Productive Site Manager with 10 year track record of providing quality leadership and construction work. Expertise in equipment operation, construction management, reading and interpreting blueprints and heavy labor. Excellent knowledge of operation and safety protocols for diverse industry equipment.
Completion of RCC structure as per the drawings and schedule with utmost care of safety and quality.
Managing site resources and ensuring optimum utilization and avoiding idling of resources.
Site coordination & getting approval from PMC for executed works. BBS preparation and quantity calculation.
Erection of structural steel.
Team leader/Site Manager for execution of RCC, structural steel and finishing works for elevated metro station.
Assuring the use of approved material only as per standards. Confirm relevance and adherence to OH&S and SWMS and SDS documents and processes Conduct inductions, tool boxes and safety walk to review client requirement, finishes & site cleanliness. Coordination for MEP works.
Inspecting construction activities, providing technical inputs for methodologies of construction and coordinating for site mgmt. activities.
Networking with architects / consultants / clients / contractors to ensure technical specifications, construction related essentials, based on the prevalent rules.
Maintaining excellent relations with clients for availing mandatory inspections/supervisions and coordinating with consultant engineer, departments & supervisors for daily work progress.
Perfrom quantity calculations by taking measurements and determining percentage of completed/installed materials and works.
Assist in preparation of work plan and packages.
Assist in field surveying and works layout support including elevation, control points, and compilation of as built data.
Assist in compiling, processing and confirming daily labour timesheets.
Assist in preparation of JHA.
Participate in daily job site reviews, tool box talk, safetry meetings & Trainings.
Monitoring of site progress/arranging site progress review meetings/ attending client progress review meeting.
Preparation of sub-contractors bills on monthly basis.
Preparation and submission of clients invoices on monthly basis and continous follow up till the payment is released against the same.
Supervision of site executions works.
Maintaining propers records for all correspondances.
Preparation of reconcilliation statements on monthly basis and ensuring wasteges are kept within the limits.
Knowledgeable in construction safety
PROJECT TIME LINES
Project 1: Rehabilitation & Reconstruction of Wankhede Stadium, Mumbai
Period : Jul’10 – Sept’10
Project Details : Existing cricket stadium needed to be restructured for final match of ICC Cricket World Cup-2011.
My Role : Site engineer for civil site execution works.
Project 2: Construction of Civil, Structural and Civil Finishing works at Sahara Star Hotel, Mumbai.
Period : Sept’10 – Sept'14
Project Details : Renovation and Extension of existing five star hotel.
My Role : Site engineer for civil site execution works/Planning engineer/Client & sub contractor billing engineer.
Project 3: Construction of Riyadh Metro project, Riyadh KSA
Period : Sept’14 – Feb’20
Project Details : Construction of Riyadh Metro Project Package 2 Line 3. Longest route among all the lines. Total length 41Km (Elevated Viaduct 25.4Km, Tunnel 8.6Km and at grade sections 7.1 Kms). 22 stations (9 Elevated Stations)
My Role : Site execution and site management for one Elevated station (Valued 64 Mn$)