Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Training
Timeline
Generic

Mohammad Ali

E&I Construction Manager -H.O.
Kharghar, Navi-Mumbai

Summary

To contribute relevant experience & educational background to a challenging position by joining an organization of repute, which can exploit the talent up to maximum by providing high profile job environment, I want to attain a high level of managerial and technical excellence while making significant positive contributions to the organization. As an experienced Engineer with over 30 years in the Oil and Gas industry, I am seeking a challenging high-level role in managing Complex projects. I am leveraging my wealth of experience in Project Engineering and interface between discipline and various vendors , plant construction, engineering, commissioning startup, project completion and project handover to the operating customer. I am especially at ease leading large-scale projects in Onshore, Offshore, FPSO, LNG, Oil Refinery, Petrochemical Power Plant, Gas Plant Green Hydrogen Generation in India ,Middle East Countries (Saudi Arabia, Oman ,Qatar ,UAE Yemen) and South Asia region ( Singapore & Indonesia) With a proven track record in detailed engineering, Fabrication, construction, Quality, commissioning, and project management across continents, my career goal is to drive exceptional results for industry giants through diligent and expert management of projects leading to cost savings and operational excellence.

Overview

30
30
years of professional experience
5
5
Certifications

Work History

Commissioning & Start-Up Manger

Hi-Marine Singapore / Plug Power-Netherlands/ U.S.A.
Walvis Bay
01.2025 - Current
  • Project Engineering Management , Interface Management , Construction, Commissioning & Start-Up Site Lead/ Manager for Commissioning & Start-Up of 2TPD Capacity1x5MW PEM Technology Complex Green Hydrogen Project.
  • Project: 2TPD Capacity 1x5MW PEM Technology Complex Green Hydrogen Project EPCI: Hi-Marine Singapore / Plug Power-Netherlands/ U.S.A.
  • Client: CMB , Namibia

Commissioning & Start-Up Manger

Hi-Marine Singapore / Plug Power-Netherlands/ U.S.A.
NTPC ,Vindhychal ,Singrauli, Madhy Pradesh
01.2023 - 01.2025
  • Project Engineering Management , Interface Management , Construction, Commissioning & Start-Up Site Lead/ Manager for Commissioning & Start-Up of 2TPD Capacity1x5MW PEM Technology Complex Green Hydrogen Project.
  • Project:2TPD Capacity Capacity1x5MW PEM Technology Complex Green Hydrogen Project EPCI: Plug Power-Netherlands/ U.S.A./India
  • Contractor: TEN. ( Technip Energies):Installation Contractor.

Commissioning Lead (Electrical ,Instrumentation &Telecom )

ANOTECH Energy Singapore PTE Ltd
01.2022 - 01.2022
  • Karish FPSO Project, (EPCI Contract in respect of the Karish Gas Development Offshore of the State of Israel), SEMCORP Marine Admiralty Yard, Singapore as a Lead Commissioning Engineer (Electrical ,Instrumentation &Telecom) -Karish FPSO. My main responsibility is all interface issues between discipline to discipline, Package Vendors, Client and Sub-Contractor and Head office and offshore marine.
  • Project: Karish FPSO Project
  • EPCI-Contractor-Technip Energies

Lead Commissioning Engineer ( Electrical ,Instrumentation &Telecom)&Interface Site

ANOTECH Energy Singapore PTE Ltd
01.2021 - 01.2021
  • Karish FPSO Project, (EPCIC Contract in respect of the Karish Gas Development Offshore of the State of Israel), SEMCORP Marine Admiralty Yard, Singapore as a Commissioning E-House Coordinator (In-charge of E-House) for Fabrication, Erection, Installation of all switchgear HV/MV /LV Switchboard, all ICSS, Fire Gas, GTG Panels, UPS, batteries Subsea Panels, HVAC system, integration, pre-commissioning and commissioning, Start-up & Hand Over of projects and sail away.
  • Project: Karish FPSO Project
  • EPCI-Contractor-Technip Energies

Commissioning Lead( Electrical, Instrumentation & Telecom )

ANOTECH Energy Global Solutions Ltd
01.2019 - 01.2019
  • As an E&I Lead Engineer my main responsibility was all Electrical and Instrumentation field engineering related Karish FPSO project in Batam’ yard, Indonesia-E-House technical issue and Engineering solution need to provide construction contractors like Technical Deviation request, Engineering site instruction provide to construction contractors and sub-contractor. All Field Engineering Drawing and documents development for E-House. Construction Installation verification as per Engineering approved document during E-House construction. As built drawing review and approved. Day to day basis attend engineering meeting with contractor and client. Engineering issue follows up with Head Office (Paris Operating Centre, France, Follow up with material, logistic and procurement department for Equipment Deliverable purpose. Final Documentation handover, Job Card review and approved. Assist with pre-commissioning and commissioning team. Assist with the sail-away team of E-House till sail -away.
  • Project: Karish FPSO Project
  • EPCI-Contractor-TechnipFMC

Electrical and Instrumentation (E&I) Superintendent

Technip France
01.2016 - 01.2016
  • Champion all HES Activities / Initiatives inclusive of Injury and Incident Free (IIF) initiatives, Behavioral Based Safety (BBS) programs, and identification of unsafe acts / unsafe conditions and raise observation cards Remains knowledgeable of safety policies and procedures as well as performs assigned duties in a safe manner while managing others, has responsibility for their safety and ensures that they comply with established safety policies and procedures and practice safe work habits. Compliance with Project Ethics policies. Supports Module Delivery Lead Project Engineers (MDLPE) whom are responsible for the timely delivery of a group of Pre-Assembled Modules (PAUs) inclusive of structural fabrication and assembly, piping fabrication and installation , equipment placement and mechanical outfitting, Electrical and Instrumentation installation, testing of piping systems / E&I systems, pre-commissioning of equipment (minimum) in addition to preparation of PAUs for shipment / sail away requiring de-stacking (horizontal splitting) of assembled PAUs, disconnection of piping, and E&I systems, preservation of equipment and systems, securing all items required for transport, load-out and secure PAUs onto ocean transport vessels. Understand the requirements of the contract EC&I fabrication Scope Of Works inclusive of all aspects of EC&I fabrication, installation (cabling, small power, lighting, heat tracing, earthing, instrumentation, control systems), schedule and look ahead plans for EC&I fabrication discipline. Ensures work is in conformance with plans, specifications, schedules, and cost control estimates. Ensure Fabrication Contractor complies with agreed build methods inclusive of single weld hook up (SWHU) methodology, lifting procedures and method statements for the most expedient approach. Active participation in mechanical completion. Ensures that subcontractors are complying with contract specifications and work procedures and material is being utilized to ensure optimum efficiency, and that work is being performed in conformance with specified quality requirements. Interfaces with Quality and Engineering Teams to insure all work scopes are following project requirements / specifications, any corrections, additions, re-work identified by Quality or Engineering is performed accordingly. Support MOC process. Assist in preparing punch list / carry over work packs as required. Maintains effective schedule reporting control functions of the project and ensures adherence to these practices. Establish daily contact with Fabrication Contractor supervision forming good relationships. Develop excellent working relationships with Company and Contractors teams assisting Fabrication Contractor in all his endeavors and objectives observing quality codes and standards. Maintain high standards of attitude and behavior throughout the site and offsite acting as a role model / mentor for younger members of staff and local employees. Monitor and reports work activities and manpower requirements to meet established completion dates, monitors craft personnel levels, material, and equipment needed to meet schedules. Understand KPI targets and monitor progress and have a perspective towards the contractor focus on meeting targets Prepares and issues weekly / monthly status reports as required. Fabrication yard-based role with majority of daily responsibility out on the site workface. Reports to the Yard Manager.
  • Project: Yamal LNG Project
  • Client: YAMAL
  • EPC-Contractor: YAMGAZ (Joint Venture of Technip, JGC & Chiyoda) Site
  • Employer: Technip France- Abu-Dhabi

Lead Engineer QC- Electrical & Instrumentation / Lead E&I Inspector

Technip France
01.2012 - 01.2014
  • Leader of Electrical and Instrument (E&I) Quality Department for PMP Project Reporting to Project Quality Manager, Construction Manager and Project Manager as per site reporting requirement on day-to-day basis regarding all Electrical and Instrument activities To maintain and follow Project quality strategy and quality system within the onshore cum offshore site organization and to support the Electrical, Instrumentation Inspectors ensuring that quality risks are identified, assessed and managed for all onshore cum offshore facilities project management activities resulting in high quality project delivery/execution. Responsible for implementing Project Quality Plan in assigned scope of work Monitor construction activities and ensure compliance with approved processes and procedures. Plan and coordinate inspection activities for discipline inspectors at site and reports to the Site Manager of Quality Surveillance issues, status and metrics. Implement the Construction Surveillance Program according to the approved Surveillance Plan. Promote Quality awareness throughout the Site. Ensure establishment and proper implementation of adequate control processes within the site inspection activities, as stipulated in the Project Plan and the Project Quality Plan. Schedules and coordinates inspection activities on site.
  • Project: Technip Chiyoda Joint Venture TCJV–PMP Project, Qatar Gas
  • Employer: Technip France

Project Engineering Cum Interface Coordinator / Company Site Representative

Technip France
01.2010 - 01.2012
  • Review the contract in terms of scope of work, obligations to the client schedules possible areas of concern, action plans, prepare the agenda for the kickoff meeting with the client and collect relevant information from various disciplines. Finalize the list of deliverables as per the contract after discussing them with various sites which is then submitted to the client for their review and approval. Co-ordinate with all Engineering disciplines who will prepare and issue deliverables such as material requisition, technical bid evaluation and purchase requisition as required for procurement activities as well as Deliverables like Drawings, Procedures, calculations etc. These are then reviewed and monitored on a weekly basis and slippage corrective action is taken. Interface with procurement to review the status of procurement activities and Take corrective action as needed Organize weekly review meetings with the client to discuss progress achieved to date as well as a forecast for the following week in addition to any other issues which need to be resolved. Interface with other Company if required as per Contract wherein the project engineer ensures any co-ordination required with other organizations which is achieved by transferring engineering documents, sorting out queries etc. in concurrence with the Client Co-ordinate with the expediting team for delivery of equipment and materials in order to monitor the status of equipment delivery by the vendor and organize weekly review meetings to verify the status and take corrective action as required. Interface with the suppliers to resolve technical issues and in case of any deviations understand the reasons thereof and decide the feasibility of continuing with the existing arrangement.
  • Project: TOTAL Yemen LNG Upstream Project (CPU-II-SAFEER) Phase-II

E&I Construction Manager

Al-Hassan Engineering Co S.A.O.G
01.2010 - 01.2010
  • Coordinate with engineering and procurement to review the scope of the job in terms of deliverables to be submitted to the client, finalize schedules to be met resources required as per contractual terms, and support in terms of required coordination with the respective teams to ensure execution as per defined parameters. Manages and coordinates all contractors and consultants at site to achieve the goal of project completion within time, quality and budget. Recommends appropriate solutions and proposes changes as necessary. Assists the project team in review and approval of the documents such as equipment, manpower mobilization programmer, construction programmer, shop drawings, work method statement etc. submitted by contactor and subcontractors and consultant and vendors. Ensure implementation of Plans and programs and take necessary action in case of any lapse and or lagging. Attend meetings with clients, contractors, consultants and vendors to review progress on weekly or more frequent basis as required Analyzes and addresses critical areas of progress delays in construction, procurement, resource mobilization and any other areas shortcomings. Validates and certifications progress final claims of contractors and consultants. Reviews and comments on pre-commissioning, commissioning and startup procedures and Operation and Maintenance manuals, appropriate to his functional area of work. Appropriate to own background, participates in the training and development of Local Engineers and inspectors. Report to the Project Manager.
  • Project: A ‘Seeb Wastewater Treatment Project (HAYA-WWTP) Capacity 80,000 cum per day Sewage Treatment Plant in Oman

Project Coordinator-QC ( Electrical, Instrumentation &Telecom)

Technip France-YEMGAS FZCO
01.2007 - 01.2009
  • Responsible for implementing Project Quality Plan in assigned scope of work Monitor construction activities and ensure compliance with approved processes and procedures. Plan and coordinate inspection activities for discipline inspectors at site and reports to the Site Manager of Quality Surveillance issues, status and metrics. Implement the Construction Surveillance Program according to the approved Surveillance Plan. Promote Quality awareness throughout the Site. Ensure establishment and proper implementation of adequate control processes within the site inspection activities, as stipulated in the Project Plan and the Project Quality Plan. Schedules and coordinates inspection activities on site.
  • Project: TOTAL YEMEN LNG Onshore cum offshore LNG Plant with Jetty facility

Construction Specialist Electrical, Instrumentation &Telecom of Project Management Team (PMT)

Saudi Armco/ Resource Science Arabia Ltd (RSAL)
Dahran
01.2006 - 01.2007
  • Worked as a Project Engineer of Project Management Team (PMT) for Petro-Rabigh Refinery and Petrochemical Ltd Reviewing and consulting of Design & Engineering drawing & documents Package stage by stage (30%, 60%&90%) with design and consultant department and preparation of Issue for Construction (IFC) Drawing & documents Package for Construction of Projects. Bidder documents technical reviewing and evaluation of bid documents. Vendors design documents technical review and approved for manufacturing. Monitoring of Procurement schedule and follow up Vendors supply items with procurement department. Monitoring of Construction Schedule and follow-up of day-to-day construction activities, To maintain milestone for each activity’s construction completion and commissioning Resolve issues of interface Design& Engineering and construction activities. Construction work progress preparation and reporting to Project Manage, Co-ordination with Design Consultant, Construction Contractor and Management and Co-ordination with project pre-commissioning and commissioning activities during procurement, construction, pre-commissioning and commissioning period comply with company standard and international standard also.
  • Project: Petro-Rabigh, Refinery and Petrochemical Onshore cum Offshore Joint Venture Project (JV of Saudi Aramco-Sumitomo-Japan)

Electrical Engineer

Dodsal Engineering &Construction Company
Sohar
01.2003 - 01.2006
  • Worked as an Electrical Engineer for Refinery Offsite, Process, Utilities and Marine Facilities all Electrical activities like HV and LV Transformers Erection, HV & MV Switchgear MCC, LV Panels, HV, LV Power Cables, Control and Telecom and Fiber Optic Cables, Power Panel, Lighting panel, E/I Interface Cabinet HVAC Panel UPS AC/DC Batteries Installation Pre-commissioning Commissioning and assistance for Start-Up & Operation and Coordination with Client and Consultant.
  • Project: Sohar Refinery Onshore cum Offshore project, Oman
  • Provided technical support to colleagues on complex issues, assisting them in finding efficient solutions to problems.

Assistant Engineer Electrical

Dodsal Engineering & Construction Company, Saudi Arabia.
01.2002 - 01.2003
  • Worked as an Electrical Construction Engineer for 13.8 KVA Substation-210 Process Interface Building (PIB), HV, LV Pump Motors, Air Fin Cooler Motors, HVAC System of Substation & PIB, Battery & 25kva UPS System, Cathodic Protection System, HV, LV Cable Pulling, Cable Tray Installation, Motor control stations, Telecommunication (Phone). In plant Telephone System, CCTV, Fire Alarm, Fire & Gas, Fire protection Systems, Plant Lighting System and Pre-commissioning, Commissioning of Above System & Co-ordination with Engineering, Consultant and Client.
  • Project: Saudi Aramco-Neat Khuff Condensate Fractionation Project Rastanura Refinery, (K.S.A).
  • Provided technical assistance to staff when needed.

Electrical Engineer

Dodsal Engineering & Construction Company
01.2001 - 01.2001
  • Electrical Engineer for 220 KVA Switchyard, HT< Substation Common Control Building (CCB), 51mw Capacity two no Gas Turbines, One 54.1MW Capacity Steam Turbine, Two no Heat Recovery Steam Gas Boilers (HRSG), Cooling Tower, Demin Water (DM) Plant, Chemical Plant, Plant & Street Lighting System and Pre-commissioning & Commissioning of all Above Systems and Coordination with Engineering, Consultant & Client.
  • Project: 156.10 MW Combine Cycle Power Plants, Hazira-Surat, India Gujarat State Energy Generation Ltd (GSEG)

Electrical Engineer

Punj Lloyd Ltd
01.1999 - 01.2001
  • HT, LT Substation, Process Plant, Jetty, Base Heating System of Three no 80 meters diameter, 40 meters, height & Capacity 160,000 m3 LNG Storage Tanks, HVAC Plant, Substations Main Control Building, Fire Water Substation, Jetty Substation, Plant & Street Lighting Systems and Pre-commissioning &Commissioning .
  • Project: Dabhol Phase-II LNG Storage & Degasification Onshore & Offshore Project with Marine Facilities-ENRON, USA &Dabhol Power Company (DPC) / INDIA

Junior Engineer

Punj Lloyd Ltd
01.1999 - 01.1999
  • Worked as a Junior Engineer Electrical for HT< Substation Motors for Sulphur Recovery unit, Cable pulling Supervision, Cable Tray Installation Supervision, Plant Lighting, Fire Alarm System Pre-Commissioning, Commissioning of above Systems and Coordination with Client & Consultant
  • Project: Sulphur Recovery Unit for DHDS Project, Hindustan Petroleum Corporation Ltd. (HPCL)-Refinery, Mumbai, INDIA

Jr. Engineer

Punj Lloyd Ltd
01.1998 - 01.1999
  • Substation, Nineteen no Storages Tank ages, power and Lighting Systems Installation, Pre-commissioning, Commissioning and coordination with Client & Consultant
  • Project: Numaligarh Refinery Marketing Terminal Projects, Numaligarh, Assam -BPCL, IBP &Numaligarh Refinery Ltd, India

Engineering Jr. Supervisor

Bharat Heavy Plate & Vessels Ltd (BHPV) A Government Enterprises
01.1996 - 01.1998
  • Worked as an Engineering Jr. supervisor Execution and Inspection of Erection of (189MT & 67Mtrs Height) Atmospheric Distillation Column for CDU Unit, Vacuum Distillation Column (Weight 287MT & Height 65.5mtrs) for VDU Unit, Air Fin Coolers for CDU & VDU Units, De-euthanizer Column 51MT weight, & Stabilizer Column 46MT for Hydro cracker Unit, Packages unit of highly Purified Nitrogen Plant (HPN-600) 18Mtrs Dia, 465Mtweight LPG Horton Sphere Three no, Included Electrical & Instrumentation System.
  • Project: Numaligarh Refinery Projects-Crude Distillation Unit (CDU), Vacuum Distillation Unit, Hydro cracker Unit, Highly Purified Nitrogen Plant (HPN-600), LPG Plant (18 meters Dia Three no LPG Horton Sphere)

Site Engineer

Metallurgic Engineering Co (MECO)
01.1996 - 01.1996
  • Works of Additional Tank ages Project, LPG Recovery Project, Crude Unit-II (CDU-II), Delayed Cooker Unit (DCU-II), and Reformer Debottlekling Project and offsite project.
  • Project: Bongaigaon Refinery & Petrochemical Projects-Crude Distillation Unit-II CDU-II, Delayed Cooker Unit-II (DCU-II), LPG Recovery Unit Reformer, Xylene and Offsite Projects, BRPL, Assam

Education

Some College (No Degree) - Electrical Engineering

State Council For Technical Education Government of Assam, Engineering College Name Bongaigaon Polytechnic
Assam,India
04.2001 -

Skills

  • Core Competencies

  • Electrification Expertise

Certification

OPITO Approved BOSIET -EBS (2027)

Accomplishments

  • Played a pivotal role in the Karish FPSO project, ensuring cross-discipline coordination and flawless execution of commissioning and interface engineering.
  • Successfully led the commissioning and start-up of a 1x5MWH2 Green Hydrogen Plant, showcasing expertise in green energy power initiatives.
  • Championed HES activities in the Yamal LNG Project, reinforcing a culture of safety and environmental stewardship.

Training

  • PMI PDUsAwarded35 Program Code: MAC 10A
  • ICAPS Exposure: Integrated Commissioning and Progress System for (TOTAL) Easy Plant system
  • Winpcs Exposure: Project Completion Certification System
  • JGC HSE Training Academy award for Completion of Basic Life Support-CPR Training
  • In Sohar Refinery Project, Sultanate of Oman
  • Certification and attending ISO 9001-2000 Awareness Program in Sohar Refinery Project
  • Star Performer of the week for Khuff Condensate Rastanura Refinery, Kingdom of Saudi Arabia
  • “In plant Training Program” and “Safety Training for Line Management” from National Safety Council of India, Dabhol Power Company, Phase- II LNG Terminal Project
  • Pulse Manager & supervisor-PMP Project, Qatar

Timeline

Commissioning & Start-Up Manger

Hi-Marine Singapore / Plug Power-Netherlands/ U.S.A.
01.2025 - Current

Commissioning & Start-Up Manger

Hi-Marine Singapore / Plug Power-Netherlands/ U.S.A.
01.2023 - 01.2025

Commissioning Lead (Electrical ,Instrumentation &Telecom )

ANOTECH Energy Singapore PTE Ltd
01.2022 - 01.2022

Lead Commissioning Engineer ( Electrical ,Instrumentation &Telecom)&Interface Site

ANOTECH Energy Singapore PTE Ltd
01.2021 - 01.2021

Commissioning Lead( Electrical, Instrumentation & Telecom )

ANOTECH Energy Global Solutions Ltd
01.2019 - 01.2019

Electrical and Instrumentation (E&I) Superintendent

Technip France
01.2016 - 01.2016

Lead Engineer QC- Electrical & Instrumentation / Lead E&I Inspector

Technip France
01.2012 - 01.2014

Project Engineering Cum Interface Coordinator / Company Site Representative

Technip France
01.2010 - 01.2012

E&I Construction Manager

Al-Hassan Engineering Co S.A.O.G
01.2010 - 01.2010

Project Coordinator-QC ( Electrical, Instrumentation &Telecom)

Technip France-YEMGAS FZCO
01.2007 - 01.2009

Construction Specialist Electrical, Instrumentation &Telecom of Project Management Team (PMT)

Saudi Armco/ Resource Science Arabia Ltd (RSAL)
01.2006 - 01.2007

Electrical Engineer

Dodsal Engineering &Construction Company
01.2003 - 01.2006

Assistant Engineer Electrical

Dodsal Engineering & Construction Company, Saudi Arabia.
01.2002 - 01.2003

Some College (No Degree) - Electrical Engineering

State Council For Technical Education Government of Assam, Engineering College Name Bongaigaon Polytechnic
04.2001 -

Electrical Engineer

Dodsal Engineering & Construction Company
01.2001 - 01.2001

Electrical Engineer

Punj Lloyd Ltd
01.1999 - 01.2001

Junior Engineer

Punj Lloyd Ltd
01.1999 - 01.1999

Jr. Engineer

Punj Lloyd Ltd
01.1998 - 01.1999

Engineering Jr. Supervisor

Bharat Heavy Plate & Vessels Ltd (BHPV) A Government Enterprises
01.1996 - 01.1998

Site Engineer

Metallurgic Engineering Co (MECO)
01.1996 - 01.1996
Mohammad AliE&I Construction Manager -H.O.