Summary
Overview
Work History
Education
Skills
Personal Information
Languages
Training
Timeline
Generic
Mohammed Tajuddin

Mohammed Tajuddin

DUBAI

Summary

To be associated with a progressive organization that gives scope to apply my knowledge and skills to excel in not only the concerned field, but any field which can explore my talent and creativity which gives my potential to its fullest. To work as a MEP Coordinator for a growing and expanding organization that can extract and enhance my skills making use of my rich work experience. To carry the challenging position of SENIOR PROJECT ENGINEER ELECTRICAL AND ELV. In the industry wherein I could work upon the best skills and experience and become an integrated part of its growth.

Qualified professional with over 10 + years of work experience in SENIOR PROJECT ENGINEER ELECTRICAL AND ELV. Ability to interpret technical drawings and resolve issues within time frame. Sincere loyal and highly motivated personality with strong ethics and willingness to challenging situations. A dedicated modeler with professional skills like problem solving, organizing, technical coordination, communication, interpersonal and time management. Have an excellent training, knowledge, and experience in the latest software such as Microsoft Outlook, Microsoft word, Microsoft Excel, and Microsoft PowerPoint & AutoCAD. Involves in various residential, commercial and Industrial Projects.

Overview

16
16
years of professional experience

Work History

SENIOR CONSTRUCTION & COMMISSION ENGINNER MEP (ACTING AS CONSTRUCTION MANAGER)

BESIX CONTRUCTION
Dubai
04.2023 - Current
  • Supervising the work ensuring compliance with contract provisions Electrical & Mechanical works
  • Verifying the compatibility of the site with the designed permanent works
  • Ensuring awareness of all aspects of construction activity in order to provide quality assurance and safety standards in line with contractual requirements
  • Interpretation and application of Contract specification in respect of technical matters
  • Analyzing Contractors material submissions (Electromechanical) and approval
  • Analyzing of Contractors technical proposals and their approval
  • Reviewing and approving of shop drawings submitted by the Contractor
  • Inspecting temporary and permanent works to ensure compliance with the Contracts Documents and approved shop drawings and submissions
  • Assisting with the inspection of completed work
  • Monitoring the start-up, testing, commissioning and handover of works
  • Maintaining records of tests performed and work executed
  • Leading the team in commissioning MEP works.

SENIOR CONSTRUCTION & COMMISSION ELECTICAL ENGINNER (O & M support for SITE TRAINING WITH DLP)

BESIX CONTRUCTION
Dubai
07.2019 - 04.2023
  • Receiving panels, equipment & materials at site as per approved material submittal related to projects specific
  • Make proper storage arrangements for safeguarding panels, equipment & materials at site followed by safety procedures
  • Material Request submittal to the store for everyday activities
  • Installing the panels/equipment as per approved GA drawings & Method statements follow the Authorities DEWA/ADDC standard
  • Earthling system related Earth pit construction, Equipment’s/Panels body earthing & neutral earthing done as per approved IFG drawing & Method statements
  • Cable related to Equipment’s/Panels laid as per approved cable schedule & Method statements
  • Cable cold test -continuity test & IR value test carried out as per approved Method statement
  • Cable glanding & Termination done as per approved material submittal after that Torque test to be carried out
  • Panels/Equipment’s -Site Acceptance test carried out as per approved GA drawing, Load Schedule & Method statements
  • Pre-functional test/Pre-Commissioning test for Equipment’s/Panels carried out as per approved Method statements & Test sheet
  • Functional Operation test/Live test for Equipment’s/Panels carried out as per approved Method statements & Test sheet
  • Resources allocation of assigned work to be arranged proper & reasonable manner to complete the task
  • Arrangement of Instrument, machinery & materials for the work execution at site for completing the assigned work
  • Work completion as per approved plan & cost related to work to be considered
  • Raising Work Inspection Request of Installation/Testing & Commissioning after the work completion at site
  • Safety Induction & Toolbox Talk to be given every day to the staff working at site
  • Permit to Work procedure to be followed and arrangement of PTW for live Electrical panels related work
  • Coordination with Supplier/Vendor to replace the failure parts in the Panels
  • Coordination with Sub-Contractor to complete the assigned work for them
  • Coordination with Consultant, Client & Independent Commissioning Authority
  • Attending the Consultant Site Observation Report (SOR), Non-Confirmative Report (NCR) till closing
  • Coordination with other disciplines Civil & Mechanical for smooth work every day at site
  • Prepare & submit daily reports, weekly report & monthly report to higher level staff
  • Troubleshooting the LV panels, MDB, SMDB, DB, MCC & Control Panel
  • Supporting to prepare O & M manual for the equipment’s/Panels
  • Closing the Snag list received from Consultant/Client
  • Training given to the low-level staff for the work activity
  • Handing Over the required documents to the client as per project requirements

senior Electrical Engineer - Electrical and ELV Systems

SIX CONSTRUCT QATAR
Qatar
07.2017 - 06.2019
  • Design review and recommendation of contract documents to incorporate electrical decruitment
  • Design review, recommendation for conceptual and detailed design for extension of new substation panels, 11kv substation switch gears, LV System, switch gears,11kv battery calculation, transformation sizing, generator sizing, Up’s sizing, LV cable size calculation etc
  • Reviewing 11kv schematic, LV schematic for cable size, break size, lighting and small power drawings, containment drawings etc
  • Attending weekly, monthly progress technical meetings and reporting to the construct may
  • Managing and directing the electrical working site according with the specification, contract drawing, agreed procedure and misstatements
  • Site supervision of electrical installation, testing commission of 11kv substations, switch gear, 11kv UIs transformation, lighting and small powder installation, cash containments and another electrical worker
  • Managing and directing project energies and site engineer
  • Attending the weekly programs meetings with the management clients
  • Preparation of project as built drawings, and close and documents
  • Checking ELV installation works-CCTV cameras, FAS, WDN, SCN, FIDS, PAS
  • Co-ordinate with QA/AC with the ongoing work conduct site inspection
  • Monitoring, Co-ordination of target schedule to compensate delays due to design, construction, engineering, material issue etc
  • Preparation of correspondence for ongoing activities
  • Exerting full control over the work force on site
  • 11kv/UIs v power substation and distribution system with cable and switch board installation having 16 nos’’’: 500KVA transformations and 300KVA diesel generator system
  • Supervise and inspect electrical installation and equipment’s, distribution boards, MCB, MCCB, ELCB, cables, wiring method, other components inspect for conformance to drawings, specification etc
  • In order to ensure compliance with regulation of local authority
  • Procurement of equipment and electrical fitting for installation
  • Electrical inspectorate standards and specifications, safety regulations and procedure for electrical installation
  • Verification of materials for quality and corrections
  • Arranging of inspectorate and electrical boarders’ staff to verify and getting sanction orders for energizing installation
  • Installation, testing and commission of capacitor panel to enhance power factor and thereby reducing electrical bill
  • Hydrogen system
  • Installed and maintained air compressor vacuum pumps, air dryer and air controller units
  • 415v AC diesel generator of rating 300KVA
  • Installation of civil Defense fails
  • Responsibility for the who procedure of the installation of GEF, SEFs
  • The installation of power factor correcting unit is performed in accordance with the project specification and manufactures recommendation
  • Capacitor shall comply with EN 60831-1/2 and shall be of dry metalized film construction, containing no liquids and must have low losses (typically O.S watts/KVA) Capacitors shall be equipped with suitable discharge resister to reduce voltage less than 50v in one minute (or) less, after supply disconnections
  • The procedure is intended to lay down the testing requirement’s to be carried out regarding the MCCS/VFDs and their components
  • To verify proper functioning of the MCCS/VFDs
  • The field test available for assessing the suitability’s for service and reliability of uninterruptable power supply (UPS systems)
  • Installation and testing of MICC cable is performed in accordance with project specification and manufacture recommendation
  • Installation of electrical boards (PDBs and PSDBs) Installation of UPS and battery work procedure and liaison with relevant authorities when required
  • Responsible for bus bar operations, quality of work safety for teen others who may be affected by the works
  • Installation of diesel generator set with quality of work
  • The scope covers the methodology and techniques to be implemented for the requirements and procedure for the installation of central battery system.

Electrical Engineer - Electrical and ELV Systems

SIX CONSTRUCT QATAR
Qatar
02.2017 - 07.2017
  • Preparing Daily Inspection Schedule with QC department (Electrical, ELV and BMS systems)
  • Organizing quality control inspections for materials received by the site stores
  • Preparing weekly inspections status monitoring report
  • Preparing site surveillance report and SOR
  • Liaise with consultant/client for the de-snagging inspections, handover inspections
  • Ensure safety on site shall be strictly followed, comply with safety procedure and practice
  • Report to Manager for any deficiencies and irregularity or doubts in implementing works on site
  • Support the site inspections with consultant as per the QCS standards and project specifications
  • Checking Material inspections with consultant as per the QCS standards and project specifications
  • Installations done as per the approved method of statements and controlling with ITP
  • Controlling the projects with the approved documents like drawings and site instructions
  • Co-ordination with MEP teams and sub-contractor for the site installation and material inspections
  • Liaise with technical teams for any discrepancies in drawings, installation details
  • Working with construction team to meet systems functionality complies with the standards of NFPA and following the local civil defense (QCDD)
  • Co-coordinating and follow-ups for the testing and commissioning and site installation for electrical and ELV systems.

MEP Engineer

Al-Muhaidiab Six Construct K.S.A.
Saudi Arabia
10.2012 - 12.2016
  • Responsible for Supervision and Execution of all Electrical Works as per IFC drawings
  • Planning of weekly work schedules in coordination with Project Engineer
  • Preparation of Weekly and Monthly Reports
  • Successfully Lead Five Electrical Teams and Supervised the sub-contractors in execution work
  • Supervision in installation of Electrical and Telecommunication Duct Banks, cable trenches, Cable Installation, Medium and Low Voltage Termination
  • Installation MV Package substations of ratings 300 KVA -1000 KVA
  • Installation of External Lighting systems, Feeder Pillars, CCTV Cameras, Road Barriers and Wi Fi Units in External Car Parking and Roads
  • Installation and Testing of Grounding System around the stadium
  • Coordination with Third party and Quality representative for Testing and Pre-commissioning of Package Sub-Stations, Feeder Pillars, SMDBs, DBs, MCCs
  • Installation of EMT conduits and cable trunks for Building wires
  • Installation of cable Trays and cable Ladders for LV and MV cables
  • Installation of Interior Lighting System, LCPs, and CBS Units
  • Installation of SMDBs, DBs, MCC, VFDs
  • Installation of DDC and LDS for BMS
  • Ensure that all works shall comply with the Project specifications and international standards
  • Conduct Megger test for Medium and Low Voltage power cables
  • Manpower Handling
  • Rectification and follow-up for PMCC items as per client requirements
  • Preparation of As-Built drawings as per the site changes
  • Good knowledge in catwalk area certificated by OSHA.

Project Engineer Electrical

N. Johnson Engineers PVT. LTD
India
07.2010 - 07.2012
  • Responsible for the planning and supervision of all electrical works related to the project
  • Installation of MDB, SMDB & DB Panels
  • Installation of Cable Trays, Cable Ladders & Cable Trunking for all the electrical services used in substation entire building
  • Supervision of Project construction and monitoring of all Electrical activities consists of Electrical wiring & Low voltage system and Caballing & Termination, Panel board erection, Testing &commission, Applied International standards
  • Complete project Control for execution & Commissioning with the coordination of client &consultant, sub-contractor
  • Attending meeting with consultants
  • Electrical installation of conductor for normal lightning systems, emergency lighting system, power system.

Site Engineer Electrical

GS Engineering & Construction
India
07.2008 - 05.2010
  • Electrical installation of residential & commercial building
  • Preparation of load list of residential and commercial building
  • Making check and balance of materials as site
  • Supervision the site and daily reports
  • Check the DB ‘s provided as per site wide
  • Support for designing team
  • Installation supervision of low current systems stated below: Fire alarm system, public address system, CCTV system, security door access system, park management system
  • Installation of different type of lighting system.

Education

Bachelor of technology (Electrical engineering) -

Sindhura engineering college, India

Intermediate education -

Alphores junior college, India

Secondary school education -

VANINIKETHAN High school

Skills

  • Job Site Development
  • Contract Negotiation
  • Project Documentation
  • Hiring and Training
  • Budget Management
  • Site Management
  • Planning and Design
  • Work Planning and Prioritization
  • Estimating
  • Project Management
  • Scaffolding
  • Cost Control
  • Project Scheduling
  • Production Planning
  • Construction Management
  • Superb Management Skills
  • Team Building and Leadership

Personal Information

  • Passport Number: N 40173695
  • Passport Date Of Issue: 03/17/16
  • Passport Place Of Issue: Saudi Arabia
  • Passport Expiry Date: 03/16/26
  • Date of Birth: 08/06/83
  • Nationality: Indian
  • Marital Status: Married
  • Religion: Islam

Languages

  • English
  • Urdu
  • Hindi
  • Telugu

Training

  • Membership in Saudi council of engineering in Saudi Arabia
  • Applying for MMUP in Qatar
  • Catwalk area certificated by OSHA

Timeline

SENIOR CONSTRUCTION & COMMISSION ENGINNER MEP (ACTING AS CONSTRUCTION MANAGER)

BESIX CONTRUCTION
04.2023 - Current

SENIOR CONSTRUCTION & COMMISSION ELECTICAL ENGINNER (O & M support for SITE TRAINING WITH DLP)

BESIX CONTRUCTION
07.2019 - 04.2023

senior Electrical Engineer - Electrical and ELV Systems

SIX CONSTRUCT QATAR
07.2017 - 06.2019

Electrical Engineer - Electrical and ELV Systems

SIX CONSTRUCT QATAR
02.2017 - 07.2017

MEP Engineer

Al-Muhaidiab Six Construct K.S.A.
10.2012 - 12.2016

Project Engineer Electrical

N. Johnson Engineers PVT. LTD
07.2010 - 07.2012

Site Engineer Electrical

GS Engineering & Construction
07.2008 - 05.2010

Bachelor of technology (Electrical engineering) -

Sindhura engineering college, India

Intermediate education -

Alphores junior college, India

Secondary school education -

VANINIKETHAN High school
Mohammed Tajuddin