

To work in a competitive environment on challenging assignments that shall yield the twin benefits of the job satisfaction and a steady-paced professional growth.
Project: New Six Lane Ganga Bridge (Extra-dosed Stay Cable Bridge), Bihar
Project Value: ₹4944.8 Cr | Client: Bihar State Road Development Corporation Ltd.
Project Scope: 22.76 km total length, including 9.76 km main bridge—India’s longest river bridge.
Key Responsibilities & Achievements
• Led segment erection operations, including segment shifting, launching via Derrick crane, dry
match, epoxy application, stitch concrete, PT bar stressing, segment stressing, and grouting,
ensuring structural precision and project milestones.
• Managed Derrick crane operations for safe and efficient launching, dismantling, and installation,
contributing to smooth and timely segment deployment for the main bridge.
• Directed structural works for lower pylons, pier table, and upper pylons: responsible for rebar and
shuttering, saddle/bracket installation, in-depth inspections with PMAE, and arrangement for
high-quality casting and finishing.
• Collaborated cross-functionally with project management and inspection teams, ensuring all
works were executed according to technical specifications, EHS standards, and client guidelines.
Microsoft excel / Auto CAD
DOB : 25/02/1987 Nationality : Indian Marital Status : Married Father’s Name : Mr. Rajendra Prasad Sinha Mother’s Name : Mrs. Sarbila Devi Caste/ Category : OBC Passport No : ZA414575 Home Address : C-1, Vrinda Nagar,Ward 17, Near Ganesh Temple, Bhilai, PO. Supela, Dist. Durg C.G. Pin. 490023 Date :- 08/05/2026 Place :- Bhilai
CIVIL ENGINEER with 15 years of experience.
Microsoft excel /Auto CAD