Summary
Overview
Work History
Education
Skills
Timeline
Generic

Mohanraj Gunasekaran

Mumbai

Summary

Accomplished career growth with experience of nearly 11.5 years in Design, Project Management, Planning and Execution of Works, Site Management, Health, Safety & Environment Management, Operations &Maintenance, Installation & Commissioning and Team Management. Currently associated with ASIS Elektronik as Project Manager.

Overview

11
11
years of professional experience

Work History

Project Manager

ASIS Elektronik Ve bilisim sistemleri A.S
Agra
11.2023 - Current
  • Develop and maintained a comprehensive project plan for the AFCS implementation in Agra metro OCC & 6 Priority section.
  • Define the project timeline, milestones, and deliverables for each phase of the system development (design, testing, deployment, etc.)
  • Conducted the FAT of Automatic gate, Cables , Ticket reader & Electrical Cables
  • Prepared the network architecture , system architecture and implementation.
  • Prepare the Management document submission programme, Works programme ,OIR and RFP compliance report.
  • Coordinate with a cross-functional project team and resolve the issue based on the priority
  • Manage contracts, ensuring deliverables meet the project's technical specifications and timelines.
  • Making the project budget analysis and provide input to the design and development team
  • Visited stations weekly to inspect implementation progress and analyze work achievements.
  • Plan and drive Project Schedules from design to release using MS project management and manage production launches
  • Coordinating with Client for document review and approval.
  • Coordinating with software developers to achieve the client requirement
  • Ensured smooth and accurate testing of various ticketing systems.
  • Collaborated with Development team to develop RFP & Business rule requirement, encompassing GUI and completing the Design phase.

Senior Project Manager

Paycraft Urban Solution Private Limited
Kochi
02.2022 - 11.2023
  • Involved and executed the following fare product in Kochi metro Trip pass on EMV, Common period pass on RPT, Promotional code on QRC, loyalty program in EMV
  • Group ticketing in QRC, Mobile ticketing, NCMC (In Progress), What's up (In Live), Telescopic pricing for different operator (Rail & Water) as per the business rule and RFP
  • Involved in implementation of ETM in greater Kochi bus union to integrate kochi1card for ticketing
  • Coordinating with software developers to achieve the client requirement
  • Managing the testing of multi fare media types
  • Monitoring the daily operation failure management with team members and closing it on targeted time schedule
  • Conducting monthly, weekly meeting with stockholders and internal team to progress the work
  • Prepare Project Status presentations, Monthly progress Report and submit to senior management.

Project Coordinator

Amnex Infotechnologies Ltd
Kochi
10.2021 - 02.2022
  • Manage complete Telecom system implementation projects in Kochi water metro
  • Implementation of different technologies like VHF, PAS, CCTV, PIDS, PAS, weather forecasting & ABLS in water metro
  • Monitoring the daily progress of projects
  • Providing detailed updates to project managers or other stakeholders
  • Ensuring team members have the supplies and resources they need to complete their assigned tasks on time and within their budget limits
  • Organizing reports, invoices, contracts, and other financial files for easy access
  • Planning meetings and organizing project logistics
  • Performing billing and bookkeeping tasks
  • Ordering necessary office supplies.

Manager

AGS Transact Technologies Ltd
Kochi
10.2016 - 09.2021
  • Project 1 - Implementation of Cloud based open Loop AFC system-QR, RPT, EMV & NFC Ticketing in Kochi Metro
  • Project 2 - Installation and Maintenance of Telecom Sub-systems in Kochi Metro rail
  • Project 3 - Implementation of Cloud based open Loop AFC system with Telescopic pricing-QR, RPT, EMV & NFC Ticketing in Kochi Water Metro
  • Project 4 - Implementation of Closed Loop AFC system in Amritsar Metro bus (BRTS)- Token, QR and Closed
  • Managing activities right from the conceptualization design of network architecture and finalizing the network equipment's
  • Coordinating with telecom team to finalize the VLAN, IP scheme and topology type
  • Coordinating with software team and calculate the required bandwidth to transfer the data from OCC to Stations
  • Interfacing with telecom department to finalize the port requirement in access switch
  • Coordinate with centralized design team to design the end equipment connectivity with central device connectivity and cable finalization like, CAT6 and optical cables
  • Coordinating with Manufacturer for prototype and factory acceptance test of Automatic gates, Ticket Vending Machine, Recharge card terminal Machine, Cables and electrical cabinets
  • Coordinating with manufacturer or developer to integrate the hardware and software
  • Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the stakeholders and end user clients
  • Organizing projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives
  • Preparing and reviewing method statements and work specific quality control plans
  • Testing & commissioning of Automatic gates, Ticket Vending Machine, Recharge card terminal Machine, Ticket office machine, Excess fare office, Network switches, station servers and centralized Equipment's
  • Coordinating with telecom team to connect AFC system with FOT'S
  • Coordination with Telecom team to integrate the ticket vending machine sensor control card to CCTV system, to prevent tampering (Intelligence visual analysis)
  • Co-ordinate with client for Installation verification test, partial acceptance test and software acceptance test
  • Involved in Trial runs and monitoring the AFCS system before going Live
  • Monitoring and implementing the Safety, health & environment policy as per the client requirement
  • Coordinate with safety officer to achieve the zero accidental project completion.

Safety Supervisor

Hiranandani Communities
Chennai
02.2015 - 09.2016
  • Maintaining and monitoring periodical inspection records for all Fire safety equipment, Power tools & Hand tools, Cranes Lifting equipment, Forklifts and Heavy vehicles
  • Assisting and advising on emergency mock drill
  • Coordination of heavy lifting works and traffic safety issues
  • Reporting near miss incident / accidents
  • Analyzing & taking corrective actions of the root cause of accident or incidents
  • Daily site safety inspection and reporting of hazardous observations
  • Making and preparing of job safety analysis (JSA) for issuing permits
  • Planning and implementing safety measures in pre-commissioning operations
  • Arranging weekly safety meetings with contractor's and generating monthly site safety performance report
  • Highlight and implement environmental protection policy ISO 14001 to contractors
  • Arranging fire fighting equipment as per site requirement
  • Training on all safety aspects in fabrication yard
  • Liaison with clients, area safety co-coordinator
  • Responsible for all safety related activities in Civil, Mechanical, Instrumentation & electrical Works
  • Develop and implement 'Planned Preventive Maintenance' schedule for all fire fighting systems
  • Performed regular inspection on all machinery and maintain compliance to all regulations such as OSHA.

Site Supervisor (NMR)

CCCL
Chennai
09.2013 - 01.2015
  • Coordinate with various contractors of CMRL to implement the cable route, raceway design as per the approved design.
  • Allocating the necessary resources to complete the project on time.
  • Coordinating with AFC contractor for laying of raceway of TVM, Gate, AVM, and Internal room Connectivity.
  • Maintaining and monitoring periodical inspection records for all power tools, hand tools, and equipment.

Education

Metro Rail Telecom Expert -

Kochi Metro Rail Limited
09.2021

Project Management Professional -

Edureka
07.2021

B.Sc in Aircraft Maintenance Engineering -

Hindustan institution of Engineering and Technology
Chennai, Tamil Nadu
01.2013

Diploma in Computer Science Engineering -

Sudharshana Polytechnic College
Trichy, Tamil Nadu
06.2010

Skills

  • Project tracking
  • Financial Administration
  • Work flow planning
  • Compliance Monitoring
  • Risk Management
  • Schedule Management
  • Data Analysis
  • Procedure Development

Timeline

Project Manager

ASIS Elektronik Ve bilisim sistemleri A.S
11.2023 - Current

Senior Project Manager

Paycraft Urban Solution Private Limited
02.2022 - 11.2023

Project Coordinator

Amnex Infotechnologies Ltd
10.2021 - 02.2022

Manager

AGS Transact Technologies Ltd
10.2016 - 09.2021

Safety Supervisor

Hiranandani Communities
02.2015 - 09.2016

Site Supervisor (NMR)

CCCL
09.2013 - 01.2015

Metro Rail Telecom Expert -

Kochi Metro Rail Limited

Project Management Professional -

Edureka

B.Sc in Aircraft Maintenance Engineering -

Hindustan institution of Engineering and Technology

Diploma in Computer Science Engineering -

Sudharshana Polytechnic College
Mohanraj Gunasekaran