Summary

Dynamic and results-driven Project Management Professional with over 15 years of experience leading complex Solar EPC, High Voltage Substations (GIS/AIS up to 765 kV), and Transmission Line projects across India. Adept at managing multi-crore government and private infrastructure initiatives under schemes like RDSS, DDUGJY, IPDS, and Jal Jeevan Mission. Known for delivering projects ahead of schedule and under budget while ensuring full compliance with safety, quality, and regulatory standards. Expert in vendor development, SAP-based procurement, stakeholder engagement, and team leadership across geographically dispersed sites. Proven ability to drive operational excellence, resolve critical ROW and statutory challenges, and lead high-performing teams to successful project outcomes.

Overview

14
years of professional experience

Work History

SARBATI INFRA PROJECT PVT. LTD.

Assistant General Manager
06.2025 - Current

Job overview

Leading execution and on-site monitoring of the Ajmer Solar Project.
Managed resource allocation and reporting processes between corporate HQ and site teams.
Managed project timelines and quality standards for successful completion.
Managed client communication to ensure alignment with project goals.
Managing project documentation, billing, and contractual
obligations with EPC vendors and sub-contractors.
Representing the project in review meetings, addressing technical challenges, and ensuring stakeholder satisfaction.
Enhanced operational efficiency in solar infrastructure projects.
Motivated, trained, and disciplined employees to maximize
performance.
Handled cash accurately and prepared deposits.
Increased customer satisfaction by addressing and resolving concerns in a timely manner.

WINBEE SOLUTION

Deputy General Manager
02.2025 - 04.2025

Job overview

Spearheaded the execution of rooftop and ground-mounted solar EPC projects ranging from 250 kW to multi-MW capacity, ensuring on-time delivery and strict adherence to quality benchmarks.
Managed end-to-end procurement of critical components including solar PV modules, inverters, transformers, and BOS items,optimizing supplier lead times and cost efficiency.
Acted as the primary liaison for key clients such as Adani, ACME, and Renew Power, ensuring seamless communication, technical approvals, and milestone alignment.
Supervised project budgeting, billing cycles, and financial reporting to safeguard margins and improve profitability tracking.
Resolved complex issues related to Right of Way (ROW), local statutory clearances, and utility permissions to avoid execution delays.
Directed multidisciplinary site teams, enforcing strict compliance with HSE protocols and ensuring accurate documentation of project progress, inspections, and compliance reports.
Introduced process improvements in project coordination and documentation practices, contributing to streamlined handovers and reduced punch-list items.
Short-term solar rooftop EPC support engagement.

Jakson Ltd.

Senior Project Manager – Solar & Infra
01.2024 - 01.2025

Job overview

  • Solar EPC Projects (Pan India)
  • Delivered over 300 MW of solar projects including ground-mounted, rooftop, and airport solar electrification.
  • Handled full EPC lifecycle from design review to procurement, execution, and commissioning.
  • Led key projects including 10 MW NTPC Solar (Rajasthan), 250 KW Airport Solar (Ayodhya), and utility-scale plants for UPPCL & MSEDCL
  • Managed cost optimization, vendor development, and procurement using SAP MM.
  • Ensured project delivery within budget and timelines through proactive risk mitigation and resource planning.
  • Maintained quality and compliance with MNRE, IEC, and state regulations
  • Liaised with clients, consultants, and internal teams for smooth approvals, testing, and handover.
  • RDSS Projects (Distribution Infrastructure – Maharashtra)
  • Planned and executed RDSS projects under Government of India schemes to upgrade 33/11 kV distribution infrastructure.
  • Led bay extension, augmentation of existing substations, and installation of Special Deign Transformers (SDTs).
  • Managed coordination with DISCOMs, consultants, and site teams for smooth execution and energization.
  • Ensured material procurement, DPR/BOQ verification, and site progress as per REC and RDSS guidelines.
  • Handled shutdown approvals, ROW issues, and local liaison with utilities and contractors.
  • Monitored site safety, documentation, and adherence to quality standards (CBIP, BIS, REC norms).
  • Maintained quality and compliance with MNRE, IEC, and state regulations.
  • Liaised with clients, consultants, and internal teams for smooth approvals, testing, and handover.
  • Team & Process Management
  • Directed cross-functional teams of engineers, supervisors, and contractors across multiple project locations.
  • Tracked project progress via MIS, DPRs, and reporting to management.
  • Implemented HSE protocols on all job sites and ensured zero safety violations
  • Conducted technical reviews, client meetings, and vendor performance assessments.
  • Lead and mentor a team of project managers, engineers, and technical staff.
  • Monitor team performance and ensure smooth execution of responsibilities.
  • Recruit, hire, and develop talent to build a high-performing team.

Pratap Technocrats Pvt. Ltd.

Project Head – EPC (T&D)
04.2023 - 01.2024

Job overview

  • Led 765/400/220/132 kV TL projects for PGCIL/SPTL with drone-based inspections.
  • Oversaw OPGW stringing, shutdowns, and statutory approvals (PTCC, NHAI, Forest).
  • Submitted monthly EPRs and managed project budgeting effectively.
  • Coordinated site readiness, resource allocation, and project schedules across zones.
  • Ensured safety protocols, FQP compliance, and stakeholder coordination.
  • Reviewed technical documents and vendor performance.
  • Managed subcontractor billing, DPR verification, and BOQ execution.
  • Resolved ROW challenges by liaising with forest departments, utilities, and local authorities.
  • Trained site teams on quality audits, safety procedures, and client communication.

Supreme Co. Pvt. Ltd.

Senior Manager – Transmission & Substation
05.2021 - 04.2023

Job overview

  • Managed end-to-end execution of substation and TL projects (MSETCL, PGCIL)
  • Led budgeting, commissioning, statutory approvals, and documentation
  • Delivered turnkey solutions for 33/11 kV GIS substations and UG cabling in Assam & Tripura.
  • Led cross-functional teams across Guwahati, Agartala, and ensured delivery as per FQP and CBIP.
  • Led coordination for DPR finalization, billing (JMC), and materials reconciliation.
  • Recruited and supervised engineers, vendors, contractors, and monitored field teams.
  • Maintained daily/weekly MIS, presented monthly progress reports to senior management.

KEI Industries Ltd.

Assistant Project Manager
07.2017 - 05.2021

Job overview

  • Executed 220 kV GIS/AIS substations & UG cabling under DDUGJY/IPDS.
  • Led EPC works in Banaras, ensuring zero safety violations and 100% compliance.
  • Supervised field execution, documentation, statutory inspection, and energization.
  • Coordinated with PGCIL, UPPCL, and state DISCOMs for approvals and billing.
  • Ensured contractor management, site audits, and inventory tracking via SAP.
  • Facilitated timely execution and project handover within specified deadlines.

Jyoti Structures Ltd.

Senior Engineer – TL & Substations
11.2012 - 07.2017

Job overview

  • Completed EPC works in MSETCL/PGCIL 220kV-400kV substations and TL projects.
  • Site Management, Site works like Survey, Foundation, Tower Erection, Stringing & Underground cabling work. Participating in pre-bidding activities like route survey, estimating the BOQ quantities.
  • Preparing Project documentation & FQP.
  • ROW solving capability & Liaisoning work like Forest, NHAI, Power line crossing and PTCC approval.
  • Billing & Client handling, preparing the JMC and Billing the executed work.
  • Reconciliation of store material, consumption site materials time to time.
  • Projects Audit work Physical and Financial work.
  • Planning, commissioning & timely execution of works.
  • Preparing site safety plan, Risk Assessments, emergency response plan etc.
  • Ensuring all Legal regulations concerning to safety, health & environment are implementing in the execution of the project.
  • Leading the team of supervisors/vendors and providing technical support for maintenance to ensure smooth operation.
  • Supervision of all the TL & UG cable works ensuring the safety and the damage to the utility existing on the route. Individual handle site team & vendors.

Reliance Sasan Power Ltd.

Sr. Executive – Purchase & Materials
07.2011 - 11.2012

Job overview

  • Managed procurement and vendor coordination for 6x660 MW UMPP.
  • Ensured on-time delivery and billing via SAP-based systems.
  • Handled inventory control, inspection tracking, and purchase planning.

Education

KSOU (Entered by -Institute of Engineering & Management)

MBA from Power Management
01.2014

Integral University

Bachelor of Computer Science (B.Sc.)
01.2011

K. Samaj College
Chakarpur, Sachendi, Kanpur

12th from Science
01.2007

University Overview

U.P. Board

K. Samaj College
Chakarpur, Sachendi, Kanpur

10th from Science
01.2005

University Overview

U.P. Board

Skills

  • Substation Project Execution (765/400/220/132/66/33 kV GIS & AIS)
  • Transmission & Distribution (T&D) Systems
  • Solar Power Project Management (Ground-mounted & Rooftop)
  • Meter Data Management System (MDMS)
  • Building Construction & Infrastructure Execution
  • Overhead Lines (OHL) and Underground Cabling
  • Railway Electrification (DMRC & Indian Railways Projects)
  • AutoCAD, MS Project, and Project Scheduling Tools
  • Quality Control, Safety, and Compliance (IS/IEC Standards)

Languages Known

Hindi
English

Hobbies and Interests

Reading News Paper & Travelling

Disclaimer

I hereby declare that all the information provided above is true and correct to the best of my knowledge and belief. I take full responsibility for the accuracy of the particulars mentioned in this resume. Date: Place: Lucknow Signature: (Mohsin Khan)

Work Type

Full Time

Work Location

On-Site

Timeline

Assistant General Manager

SARBATI INFRA PROJECT PVT. LTD.
06.2025 - Current

Deputy General Manager

WINBEE SOLUTION
02.2025 - 04.2025

Senior Project Manager – Solar & Infra

Jakson Ltd.
01.2024 - 01.2025

Project Head – EPC (T&D)

Pratap Technocrats Pvt. Ltd.
04.2023 - 01.2024

Senior Manager – Transmission & Substation

Supreme Co. Pvt. Ltd.
05.2021 - 04.2023

Assistant Project Manager

KEI Industries Ltd.
07.2017 - 05.2021

Senior Engineer – TL & Substations

Jyoti Structures Ltd.
11.2012 - 07.2017

Sr. Executive – Purchase & Materials

Reliance Sasan Power Ltd.
07.2011 - 11.2012

KSOU (Entered by -Institute of Engineering & Management)

MBA from Power Management

Integral University

Bachelor of Computer Science (B.Sc.)

K. Samaj College

12th from Science

K. Samaj College

10th from Science
MOHSIN KHANPRIVATE JOB