Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Mr Mohammad Sagir Alam

Patna,Arwal

Summary

HVAC Piping Foreman with expertise in piping installation, pressure testing, and safety compliance. Proven track record in supervising residential and commercial projects, ensuring adherence to industry regulations. Strong leadership skills and ability to troubleshoot complex systems, resulting in enhanced operational efficiency and timely project completion.

Overview

16
16
years of professional experience

Work History

HVAC Piping Foreman

First Fix
Saudi Arabia
01.2024 - Current
  • Quantities take off piping, fittings, valves, etc.
  • Installation of piping as per the drawing and site conditions.
  • Installation of the valve package.
  • Pressure testing is a complete system.
  • Installation of AH, FCU etc.
  • Supervised installation of piping systems in residential and commercial projects.
  • Coordinated work schedules and task assignments for team members on-site.
  • Conducted safety inspections to ensure compliance with industry regulations.
  • Collaborated with project managers to review project specifications and requirements.
  • Maintained tools and equipment, ensuring readiness for daily operations.
  • Assisted in troubleshooting issues related to piping installations during projects.
  • Provided technical support to pipefitters as needed during installations.
  • Adhered to company policies and protocols at all times while onsite to ensure compliance with applicable laws and regulations.

HVAC Piping Foreman

Infraroad UCC
Qatar
07.2021 - 08.2023
  • Provided technical support to pipefitters as needed during installations.
  • Adhered to company policies and protocols at all times while onsite to ensure compliance with applicable laws and regulations.
  • Attended relevant industry seminars and workshops periodically to stay current on best practices related to piping foreman duties.

Pipe Fabricator

DAS OFFSHORE
Mumbai
09.2020 - 12.2021
  • Established sequence of installations around obstructions.
  • Installed automated controls to regulate pressure and volume in pipe systems.
  • Inspected installed systems using hydrostatic testing or pressure gauges.
  • Shut off steam or other gases or liquids from pipes to conduct maintenance.

Piping Fabricator

Q.D.S.B.G
Qatar
06.2015 - 06.2017
  • Fabricated metal components using advanced welding and cutting equipment.
  • Collaborated with team members to maintain safe work environment.
  • Identified defects in welds such as porosity, cracks, slag inclusion.
  • Performed quality assurance tests on products to adhere to production standards.
  • Installed heat trace tape to tubing and controls and bent large tubing with power bender.
  • Utilized furnaces and other heating equipment to weld, shape and fuse materials.

Pipefitter

N.P.C.C
Abu Dhabi
10.2013 - 09.2014
  • Threaded pipes using specified machinery.
  • Assembled and disassembled boilers, tanks, vats, pressure vessels, exchangers and heaters according to blueprint specifications.
  • Assemble and secure pipes by welding joints or using cement or solder.

Pipefitter

HAMTON INTLWLL
Qatar
06.2009 - 07.2011
  • Interpreted blueprints and schematics to determine pipe layouts.
  • Collaborated with team members to complete installation tasks efficiently.

Education

High School Diploma -

N/A
N/A
01-2006

Skills

  • Piping installation
  • Pressure testing
  • HVAC systems
  • Quantity takeoff

Languages

English
First Language
English
Advanced (C1)
C1
Urdu
Proficient (C2)
C2
Hindi
Proficient (C2)
C2

Timeline

HVAC Piping Foreman

First Fix
01.2024 - Current

HVAC Piping Foreman

Infraroad UCC
07.2021 - 08.2023

Pipe Fabricator

DAS OFFSHORE
09.2020 - 12.2021

Piping Fabricator

Q.D.S.B.G
06.2015 - 06.2017

Pipefitter

N.P.C.C
10.2013 - 09.2014

Pipefitter

HAMTON INTLWLL
06.2009 - 07.2011

High School Diploma -

N/A
Mr Mohammad Sagir Alam