Summary
Overview
Work History
Education
Skills
Affiliations
Certification
Accomplishments
Timeline
MRIDUPAM PATHAK

MRIDUPAM PATHAK

Engineering Geologist
Guwahati

Summary

Highly experienced Engineering Geologist with nearly 17 years of experience in project execution and construction supervision of Transportation Tunnels and Hydro Power Projects with NATM & Conventional methods. Masters in Applied Geology. Profound knowledge in geological works related to tunneling in the challenging Himalayan geological conditions.

Excellent manpower management skill, time management skill, leadership skills. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

17
17
years of professional experience
23
23
years of post-secondary education
1
1
Certification
1
1
Language

Work History

Head Of Department Geology

Rithwik Projects Pvt. Ltd.
Srinagar
08.2022 - Current

Construction of Single Line Broad Gauge G Tunnel No. 11 (9050m), under Package-6 in connection with New Single BG line between Rishikesh and Karnprayag (125km) in the State of Uttarakhand, India. Total Tunneling Length – 19051 m including Main Tunnel (average excavated cross-sectional area of 69m2 and finished cross-sectional area of 42m2), Escape Tunnel(average excavated cross-sectional area of 32m2 and finished cross-sectional area of 17.50m2) and Cross-Passages).

  • Heading the Geology and Instrumentation Team
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Cross-checking of all Face Logs, 3D maps and Longitudinal Section before submission to the Engineer
  • Interpretation of Probe Holes from manual observation and MWD data processed through ISure software
  • Preparation of Blasting pattern and modifying as per site geological conditions
  • Preparation of Geological reports
  • Cross-checking of documentation for Geological Overbreak before final submission
  • Monitoring of primary support installation in Tunnel
  • Blast vibration monitoring and monitoring of cracks along with photography in populated areas in the proximity of the Tunnel and report submission
  • Correspondences with Engineer regarding all geological issues and technical issues
  • Regular interaction with execution team regarding site geological conditions and suggesting preventive measures to be taken
  • Involved in preparation of Required Excavation Support Sheet (RESS)
  • Instrumentation inside Tunnel and Portals and monitoring the processing of data and report submission
  • Conducting interviews for Geologists, Tunnel Engineers, and Civil Foremen.

Engineering Geologist

PEMS Engineering Consultants Pvt. Ltd.
Manali & Rangpo
10.2014 - 03.2022

1. Project Management Consultants for construction of ATAL TUNNEL, ROHTANG, 9020m (Longest Highway Tunnel in the World above 3000m) near Manali, Himachal Pradesh, having cross sectional area of 137m2 and finished cross sectional area of 75.9m2.

2. Construction of Tunnel 9 - 542m & Tunnel 10 – 5300m in connection with construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single Line BG Railway line Project. Tunnels having average excavated cross-sectional area of 69m2 and finished cross-sectional area of 39m2.

  • Checking and verifying the geological documents submitted by the Contractor
  • Issuing Required Excavation Support Sheet (RESS) and Non-Compliance Reports
  • Monitoring of Support installation and Instrumentation in Tunnel
  • Monitoring of Slope Protection works
  • Preparation of Technical Reports
  • Probe Hole Logging and data interpretation for advance Geological information
  • Regular interaction with Site Engineers regarding site geological conditions and suggesting preventive measures to be taken
  • Correspondences with Client regarding all geological issues
  • Co-ordination with Design office for all issues relating to drawings
  • Preparation of Face logs, Longitudinal Sections and Classification of Rock Mass using Q
  • Indicating direction of rock anchors spot bolts, fore-poling, etc
  • Tunnel excavation adopting DRESS methodology for Shear/ Fault Zone
  • 3D monitoring of the Tunnel and Instrumentation
  • Installation of Lining Stress Controllers (LSC) in tunnel as per site conditions
  • Geological mapping of the cut slopes
  • Correspondences with Client and Contractor regarding all geological issues
  • Supervision of Slope Protection works including instrumentation, installation of Cable Anchors and Double Corrosion Protection (DCP) bolts
  • Accomplishments in Atal Tunnel, Rohtang:
  • Successfully crossed the Seri Nalla Fault Zone of 587 m adopting DRESS method of tunnelling
  • This zone comprised of sheared & shattered rock mass, clay gougy material and River Borne Material where very high inflow of water upto 116 L/sec was observed
  • Very high deformation of upto 800 mm in 8 weeks was observed leading to cracks in shotcrete, buckling of lattice girders and settlement of pipe-roofs
  • Successfully crossed the high stress zone which had very high overburden cover of >1500 m and maximum overburden cover of 1860 m by applying various measures as per site conditions
  • Due to the high stress conditions squeezing of the tunnel, cracks in shotcrete, buckling of lattice girders were observed.

Deputy Manager - Geology

Gati Infrastructure Bhasmey Power Pvt. Ltd
Rangpo & Chujachen
03.2012 - 09.2014

1. Bhasmey Hydro Electric Power Project (51 MW) East Sikkim, Sikkim

2. Chujachen Hydro Electric Power Project (110 MW), East Sikkim, Sikkim

  • Geological Surface Mapping
  • Preparation of Face logs and 3-D logs and Classification of Rock Mass using Q and RMR
  • Monitoring of Support installation in Tunnel
  • Probe Hole Drilling and data interpretation for advance Geological information
  • Indicating direction of rock bolts, spot bolts, forepoling, etc
  • Supervising Grouting work in Head Race Tunnel and Surge Shaft
  • Civil work in HRT post concrete lining and Instrumentation in Dam site
  • Preparation of Technical Reports.

Deputy Manager - Geology

SEW Infrastructure Limited
Nafra
07.2011 - 02.2012

Nafra Hydro Electric Project (120 MW), West Kameng, Arunachal Pradesh

  • Functioned as In-charge of Geology department
  • Planning, implementation and supervision of the revised Geo-technical investigation works
  • Detailed Supervision of drilling work and Core-logging
  • Geological Mapping of Head Race Tunnel, Dam Site and Intake area, Surge Shaft and Power House area
  • Geological Mapping of Quarry area for rock and clay
  • Geological Mapping of Adit areas, Penstock Portal, Diversion Road alignment areas
  • Preparation of Technical Reports.

Geologist

Patel Engineering Limited
Tenga
08.2009 - 07.2011

Kameng Hydro Electric Project (600 MW) Package-II

  • Preparation of Face logs and Classification of Rock Mass using Q and RMR
  • Monitoring of Support installation in Tunnel
  • Indicating direction of rock bolts, spot bolts, forepoling, etc
  • Probe Hole logging and data interpretation for advance Geological information
  • Surface Mapping of the Dam area and mapping of the Abutments and Dam foundation
  • Preparation of Technical Reports
  • Supervision of Grouting and Instrumentation (MPBX)
  • Civil works in Tunnel excavation.

Project Geologist

Cengrs Geotechnica Pvt. Ltd.
Noida
02.2009 - 07.2009
  • Geotechnical Investigation for Dual Feed Cracker Unit of ONGC Petro additions Ltd At Dahej, Dist. Bharuch, Gujarat, Client: Samsung Engineering, South Korea
  • Geotechnical Investigation for Glass Factory of Saint Gobain at Bhiwadi, Dist. Alwar, Rajasthan. Client: Saint Gobain Glasses, Alwar, Rajasthan
  • Pile Integrity Testing at Kameng Hydro Electric Project, Arunachal Pradesh (Client: NEEPCO) and PGIMER, Execution and Co-ordination of Geotechnical Investigation field work, Borehole logging, conducting different Geo-technical field tests including Cross Hole Seismic Test and Pile Integrity Test
  • Preparation of reports and billing
  • Co-ordination with laboratory staff for testing of samples, review and approval of test results.

Geologist

DBM Geotechnics and Constructions Pvt. Ltd.
Mumbai
07.2006 - 01.2009
  • Posted in International assignments in Nigeria and Senegal for nearly a year
  • Independently supervised drilling work in Senegal
  • Joined as a Trainee Geologist and was promoted as Site In-charge within a period of One year
  • Geotechnical Investigation for Bangalore Metro Rail Project (North-South Corridor, Peenya to Jayanagar)
  • Geotechnical Investigation for Gosikhurd Irrigation Project, Nagbhir, Dist. Chandrapur,
  • Geotechnical Investigation for 2X33 MW Thermal Captive Power Plant,
  • Geotechnical Investigation for New Cement Plant Projects in Obajana (Kogi State, Nigeria), Ibesse (Ogun State, Nigeria) and Theis (Senegal)
  • Involved in Geotechnical Investigation projects for Metro Tunnels, Water Tunnels, Elevated Metro and Industrial plants
  • Worked in the Geotechnical Investigation Stage of Bangalore Metro Rail Project (Phase-I, North-South Corridor)
  • Responsible for execution of the field work as per Technical Specifications
  • Supervision of Drilling, Borehole logging, conducting Geotechnical field tests and preparation of reports and billing along with managing entire administration of the site

Education

Master of Technology - Applied Geology

Dr. Hari Singh Gour University, Saugar
08.2003 - 07.2006

Bachelor of Science - Geology

Gauhati University, Guwahati, India
08.1998 - 08.2003

Higher Secondary - Physics, Chemistry, Biology, Maths, English

Assam Higher Secondary Education Council, Guwahati, India
08.1996 - 06.1998

High School Leaving Certificate - English, Social Science, Maths, Science

Board of Secondary Education, Assam, Guwahati, Assam
01.1983 - 06.1996

Skills

Monitoring of Tunnel Excavation and reviewing of Tunnel Support as per ground conditions

undefined

Affiliations

Life Membership in Indian Society of Rock Mechanics and Tunneling Technology (ISRMTT) Membership No.: LM-2045


Life Membership in Indian Society of Engineering Geology (ISEG) Indian National Group of the International Association of Engineering Geology and the Environment (IAEG) Membership No.: LM-1656

Certification

• 6 Months online course on Tunnels and Tunnelling organised by Dr. Dhawan Academy of Geologists and AF Academy between 1st June 2022 and 15th December 2022.

Accomplishments

Appreciation Certificate from Chief Engineer, Project Rohtang Tunnel, for rendering yeoman service in the Construction of Atal Tunnel, constructed under the aegis of Border Roads Organisation, Ministry of Defence, Government of India.

Timeline

• 6 Months online course on Tunnels and Tunnelling organised by Dr. Dhawan Academy of Geologists and AF Academy between 1st June 2022 and 15th December 2022.

12-2022
Head Of Department Geology - Rithwik Projects Pvt. Ltd.
08.2022 - Current
Engineering Geologist - PEMS Engineering Consultants Pvt. Ltd.
10.2014 - 03.2022
Deputy Manager - Geology - Gati Infrastructure Bhasmey Power Pvt. Ltd
03.2012 - 09.2014
Deputy Manager - Geology - SEW Infrastructure Limited
07.2011 - 02.2012
Geologist - Patel Engineering Limited
08.2009 - 07.2011
Project Geologist - Cengrs Geotechnica Pvt. Ltd.
02.2009 - 07.2009
Geologist - DBM Geotechnics and Constructions Pvt. Ltd.
07.2006 - 01.2009
Dr. Hari Singh Gour University - Master of Technology, Applied Geology
08.2003 - 07.2006
Gauhati University - Bachelor of Science, Geology
08.1998 - 08.2003
Assam Higher Secondary Education Council - Higher Secondary, Physics, Chemistry, Biology, Maths, English
08.1996 - 06.1998
Board of Secondary Education, Assam - High School Leaving Certificate, English, Social Science, Maths, Science
01.1983 - 06.1996
MRIDUPAM PATHAKEngineering Geologist