Summary
Overview
Work History
Education
Skills
Languages
Timeline
Delacration
Generic
Mukesh Kumar Giri

Mukesh Kumar Giri

Siwan

Summary

Results-driven construction professional with over 18 years of extensive experience in major projects, including Hydrocarbon, CMRL Ganga Water Lift Project, WDFC, LILA Project, DMRC, and various airport and power plant developments. Proven expertise in managing complex construction initiatives while ensuring adherence to safety standards and project timelines, and optimizing resources. Strong background in administrative and operational roles within the construction sector, contributing to the successful delivery of high-profile infrastructure projects. Committed to leveraging industry knowledge and leadership skills to drive project success and enhance team performance.

Overview

21
21
years of professional experience

Work History

SR. CIVIL FOREMAN

VSL INDIA PVT.LTD
Chennai, India (CMRL UG-06)
05.2024 - Current
  • Supervised site operations ensuring adherence to Safety, Quality protocols and project specifications.
  • Coordinated daily activities of construction Teams to optimize Workflow and Productivity.
  • Collaborated with Engineers to resolve onsite Challenges, ensuring Compliance with design Specifications.
  • Streamlined procurement processes for Materials and Equipment, minimizing Potential delays.
  • Mentored Junior Foremen and supervised their work, fostering a Skilled workforce through Knowledge sharing.

CIVIL FOREMAN

L&T GEO STRUCTURE
Gujarat, India (TCL MITHAPUR)
01.2023 - 04.2024
  • Directed execution of piling work for pump house,ensuring hydraulic Rigs safely positioning and timely completed piles.
  • Successfully supervised and completed 2 km sheet pile installation
  • Assisted with excavation activities including PCC reinforcement and shuttering for foundation work. Supported bolt fixing and concreting operations on site. Maintained safety and quality standards during construction tasks.
  • Implemented safety protocols, reducing incidents and promoting a culture of workplace safety.

CIVIL FOREMAN

MEGHA ENGINEERING & INFRASTRUCTE LTD.
*Bihar Patna,India
03.2020 - 01.2022
  • Directed execution of D Wall and superstructure projects to enhance pump house infrastructure.
  • Executed d-wall installation by coordinating excavation with bio-grab machine and implementing bentonite slurry for concrete placement.
  • Managed site preparation and superstructure assembly for pump house, adhering to safety and engineering standards.

** IOCL,Paradip,Odisha

  • Oversaw pilling operations within specified dimensions of 600 mm to 1000 mm to ensure structural integrity.
  • manged site perpartion rig machine positioning and transmisst safley postioning work concrete placement

CIVIL FOREMAN

STRONG plant infrastructure Pvt Ltd
Rewari, India (Haryana)
07.2018 - 03.2020
  • Coordinated and executed tasks related to 1200 diameter piling rig to maintain project timelines.
  • Oversaw load testing and pressure evaluation processes to ensure system reliability.

CIVIL FOREMAN

VALENCHA PILE TECH INFRA PVT LTD
Noida, India (Samsung C&T Project Noida 81.)
07.2017 - 06.2018
  • Coordinated and supervised precast piling activities, ensuring adherence to safety standards and quality control measures.

KH FOGES INDIA PVT.LTD

Civil Foreman
Gujrat&Rajasthan,india (WDFC)
11.2015 - 07.2017
  • Executed direct excavation for 1200 mm diameter piling operations.
  • Proven ability to learn quickly and adapt to new situations.

CIVIL FOREMAN

GEOSTRUCTURE LLP CD-WALL WORKS
Bengaluru, India (LILA Project Bangalore.)
04.2015 - 09.2015
  • Oversaw execution of D-Wall projects to ensure timely completion.
  • cutter posting and pipe laying initiatives to ensure project efficiency. Managed trenching and stop end and cage lowering operations to maintain safety standards. Coordinated concreting placement to enhance structural integrity.

Civil Foreman

Jitendra Kumar Giri
New Delhi, India
12.2013 - 03.2015
  • Managed d-wall work operations to maintain project timelines and quality standards.
  • Coordinated site activities, optimizing resource allocation for project efficiency.
  • Trained and mentored junior staff, enhancing team skill levels and performance.
  • Implemented quality control measures, reducing rework and improving project outcomes.

CIVIL FOREMAN

L&T GEOSTRUCTURE LLP (PILING & D-WALL WORKS)
New Delhi, India (DMRC)
01.2013 - 11.2013
  • Oversaw d-wall and piling operations to ensure project compliance and safety standards.
  • Managed implementation and oversight of D-Wall stop end method to ensure project compliance.

CIVIL SUPERVIOR

IO.LARSEN & TOUBRO LTD., ECC DIVISION
03.2011 - 10.2012
  • Directed building administration tasks to ensure efficient facility operations.
  • Assisted in executing steel work projects by following established guidelines. Supported team members in maintaining safety standards
  • Executed repairs and reinforcements of steel bars to ensure structural integrity.
  • Assisted in daily operations of BBS work. Supported team members in project tasks.

CIVIL SUPERVISOR

LARSEN & TOUBRO LTD., ECC DIV.
New Delhi, India ( DIAL Project T-3)
08.2007 - 10.2010
  • Supervision of all civil activities like Earth work including Excavation, L&R, Sub-Grade, Levelling and laying of WMM/DLC with Sensor Paver.
  • Line and Level checking and level given with Auto level and Laying of Pavement Quality Concrete (PQC), finishing and texturing work.
  • Handling of manpower and resources at site as per requirement.
  • Taking of level and measurements.
  • Good relationship with engineers. Site in charges and clients.

CIVIL SUPERVISOR

LARSEN & TOUBRO LTD ECC DIV.
07.2006 - 05.2007
  • At CFU at RPL Project, Jamnagar, and Gujarat.

STORE KEEPER & SITE SUPERVISOR

NEW TECH-CONTRACTORS
06.2005 - 06.2006
  • At NDPL Delhi site under Larson & Toubro Ltd.

Education

Matric -

Bihar Board
01-1998

Intermediate - undefined

Intermediate Education
Allahabad, UP, India
01-2000

Bachelor of Arts - Political Science

J.P University
Saran, Bihar, India
01-2003

Skills

  • D-wall and piling and load testing
  • Demolition planning
  • Reinforcement installation
  • Heavy equipment operation
  • Road construction
  • Subcontractor management
  • Concrete construction
  • Earthworks management
  • Site supervision
  • Job site safety
  • Heavy lifting
  • Daily reporting

Languages

Hindi
Bilingual or Proficient (C2)
English
Elementary (A2)

Timeline

SR. CIVIL FOREMAN

VSL INDIA PVT.LTD
05.2024 - Current

CIVIL FOREMAN

L&T GEO STRUCTURE
01.2023 - 04.2024

CIVIL FOREMAN

MEGHA ENGINEERING & INFRASTRUCTE LTD.
03.2020 - 01.2022

CIVIL FOREMAN

STRONG plant infrastructure Pvt Ltd
07.2018 - 03.2020

CIVIL FOREMAN

VALENCHA PILE TECH INFRA PVT LTD
07.2017 - 06.2018

KH FOGES INDIA PVT.LTD

Civil Foreman
11.2015 - 07.2017

CIVIL FOREMAN

GEOSTRUCTURE LLP CD-WALL WORKS
04.2015 - 09.2015

Civil Foreman

Jitendra Kumar Giri
12.2013 - 03.2015

CIVIL FOREMAN

L&T GEOSTRUCTURE LLP (PILING & D-WALL WORKS)
01.2013 - 11.2013

CIVIL SUPERVIOR

IO.LARSEN & TOUBRO LTD., ECC DIVISION
03.2011 - 10.2012

CIVIL SUPERVISOR

LARSEN & TOUBRO LTD., ECC DIV.
08.2007 - 10.2010

CIVIL SUPERVISOR

LARSEN & TOUBRO LTD ECC DIV.
07.2006 - 05.2007

STORE KEEPER & SITE SUPERVISOR

NEW TECH-CONTRACTORS
06.2005 - 06.2006

Intermediate - undefined

Intermediate Education

Matric -

Bihar Board

Bachelor of Arts - Political Science

J.P University

Delacration

I hereby declare that all information given is true and best of my knowledge.
Mukesh Kumar Giri