

More than 5 years of progressive experience in different disciplines in oil and gas, refineries, petrochemicals, and coal and gas power plants have involved fabrication, welding, NDT, pre-commissioning of STG piping, and fabrication and installation of oil and water storage tanks.
Turbine, generator, and condenser erection inspection
*Pre-weld inspection: verification that dimensions, fit-up, and weld preparations are in accordance with specifications.
*Preheating: verification that any required preheat is in accordance with the specified procedure.
In-process welding inspection and surveillance: surveillance during welding to verify compliance with specified procedures, including any preheat, inter-pass temperature control, and post-heat requirements.
*Inspection and Test Plans: Assistance and agreement with the preparation of Inspection and Test Plans (ITPs), issuing NCR and CAR to contractors
Post-weld heat treatment: verification, when required, that post weld heat treatment has been conducted in accordance with specification requirements.
*Post-weld visual inspection: visual inspection and dimensional check of completed weldments against specification requirements and drawings.
Codes, standards, and specifications: interpretation of the intent and ensuring the requirements of codes, standards, and specifications are met
Welding procedures: ensuring that a procedure is available, has been approved, and is being employed in production
Witnessing of welder and procedure approval tests: witnessing the preparation of test plates and destructive tests and verifying compliance with appropriate standards and specifications
Welder approvals: verifying that adequate and valid welder approvals are available and that only approved welders are used in production
Parent material: verifying parent material against documentation and markings
Welding consumable's identity: verification of the correctness's welding consumables (electrodes, filler wires, consumable inserts, gases, fluxes, etc.)