Summary
Overview
Work History
Education
Skills
Languages
Disclaimer
Areas Of Expertise
Personal Information
Timeline
Generic
MUNNA KUMAR SINGH

MUNNA KUMAR SINGH

Chhapra

Summary

Dynamic Senior Project Engineer with extensive experience at INOXCVA, specializing in the erection and fabrication of cryogenic tanks and piping systems. Proven expertise in welding operations and quality control, complemented by strong communication skills. Successfully led multiple projects, ensuring compliance with stringent material standards and achieving timely project delivery.

Overview

10
10
years of professional experience

Work History

SR. PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
02.2025 - Current
  • Erection & Fabrication of Tanks, Piping, Structure, Foam Bricks Insulation, Vacuum Box Test, Hydro-Pneumatic test, Pneumatic test, Chemical Cleaning, Perlite Filling Inspection Works.
  • FBT Cryogenic Tank- LOX/LIN/LAR Cryogenic Storage Tank( Double wall Storage Tank)
  • SVD Area Work LIN Tank 200KL No’s of 2 Qty. & LAR Tank 100KL No’s of 1 Qty. & LIN, LAR, LOX Product Pump Skid & Tanker Fill Pump Skid Installation and Piping Fabrication, erection, welding including NDT & Pneumatic test work.
  • Piping Isometrics, Structure drawings & Equipment and Structural GAD’s.
  • Pre fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.

SR.PROJECT ENGG.

M/s Prakash Construction Eng. Pvt. Ltd.
04.2024 - 11.2024
  • Client: IOCL Panipat Refinery & Petrochemical Complex.
  • Project: Implementation of Corrosion Study Recommendations & Replacements of Existing Feed Effluent HP Pack inox E01, E-02 Heat Exchangers with Breech Lock Exchangers in DHDT Unit of IOCL Panipat.
  • Functional Competencies: Fabrication of Piping, Structure, Erection of Piping, Structure & Heat Exchangers work.

SR. PROJECT ENGG.

M/s Dreamzwell services Pvt. Ltd.
10.2023 - 04.2024
  • Client: Air Liquide Global E & C Solutions India Pvt. Ltd.
  • Project: Installation of ASU North Expansion 350 TPD, Kosi Kalan U.P.
  • Functional Competencies: Erection & Fabrication of Tanks, Piping, Structure, Foam Bricks Insulation, Vacuum Box Test, Hydro-Pneumatic test, Pneumatic test, Chemical Cleaning, Perlite Filling Inspection Works.
  • FBT Cryogenic Tank 1a.LOX Storage Tank (Double wall Storage Tank) Capacity 1325m3 1b.LIN Storage Tank (Double wall Storage Tank) Capacity 750m3.
  • SVD Work & PESO Area LIN Tank 100KL No’s of 1 Qty. & LAR Tank 35KL No’s of 1 Qty. & LIN, LAR, LOX Product Pump Skid & Tanker Fill Pump Skid Installation and Piping Fabrication, erection, welding including NDT & Pneumatic test work.
  • Piping Isometrics, Structure drawings & Equipment and Structural GAD’s.
  • Pre Fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.
  • Submission of weekly and monthly reports.
  • Site coordination and Client coordination.
  • Turbine Cold, Turbine Warm and Plant piping Works.
  • Piping Isometrics, Structure drawings & P& ID, Equipment and Structural GAD’s.
  • Fabrication of Piping, Structure, Pressure vessels and other equipment, documentation of history sheet, Test pack clearing.
  • Carried out pressure testing & leak test at site.

SR. PROJECT ENGG.

M/s Ellenbarrie industrial Gases Ltd.
02.2023 - 09.2023
  • Client: JAI RAJ ISHAPAT LTD. Orvakal,Guttapadu, Kurnool,Andhra Pradesh 518010.
  • Project: Installation of Air Separation Unit of capacity 600 TPD, Oxygen Plant.
  • Functional Competencies: Erection & Fabrication of Tanks, Piping, Structure, Foam Bricks Insulation, Vacuum Box Test, Hydro-Pneumatic test, Pneumatic test, Chemical Cleaning, Perlite Filling Inspection Works.
  • FBT Cryogenic Tank 1a. LOX Storage Tank( Double wall Storage Tank) Capacity 2000m3 1b. LIN Storage Tank( Double wall Storage Tank) Capacity 1000m3.
  • SVD Area Work LIN Tank 50 KL No’s of 2 Qty. & LAR Tank 100KL No’s of 1 Qty. & LIN, LAR, LOX Product Pump Skid & Tanker Fill Pump Skid Installation and Piping Fabrication, erection, welding including NDT & Pneumatic test work.
  • Piping Isometrics, Structure drawings & Equipment and Structural.
  • Pre fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.
  • Site coordination and Client coordination.
  • Turbine Cold, Turbine Warm and Plant piping Works.
  • Piping Isometrics, Structure drawings & P& ID, Equipment and Structural.
  • Erections of Turbine, Cryogenic & Normal Pumps, Motors etc.
  • Fabrication of Piping, Structure, Pressure vessels and other equipment, documentation of history sheet, Test pack clearing.
  • Carried out pressure testing & leak test at site.

PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
06.2022 - 01.2023
  • Client: Inox Air Products Pvt. Ltd. (Rae Bareli Uttar Pradesh).
  • Project name: Installation of Air Separation Unit of capacity 200 TPD Oxygen P.
  • Erection & Fabrication of Tanks, Piping, Structure, Foam Bricks Insulation, Vacuum Box Test, Hydro-Pneumatic test, Pneumatic test, Chemical Cleaning, Perlite Filling Inspection Works.
  • FBT Cryogenic Tank- LOX Storage Tank( Double wall Storage Tank) Capacity 900m3.
  • SVD Area Work LIN Tank 200KL No’s of 2 Qty. & LAR Tank 100KL No’s of 1 Qty. & LIN, LAR, LOX Product Pump Skid & Tanker Fill Pump Skid Installation and Piping Fabrication, erection, welding including NDT & Pneumatic test work.
  • Piping Isometrics, Structure drawings & Equipment and Structural GAD’s.
  • Pre fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.

PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
04.2021 - 05.2022
  • Client: Inox Air Products Pvt. Ltd. (AMNS Hazira Surat Gujarat).
  • Project name: Installation of Air Separation Unit of capacity 700 TPD.
  • Erection & Fabrication of Tanks, Piping, Structure, Foam Bricks Insulation, Vacuum Box Test, Hydro-Pneumatic test, Pneumatic test, Chemical Cleaning, Perlite Filling Inspection Works.
  • SVD Area Work LIN Tank 200KL No’s of 2 Qty. & LAR Tank 100KL No’s of 1 Qty. & LIN, LAR, LOX Product Pump Skid & Tanker Fill Pump Skid Installation and Piping Fabrication, erection, welding including NDT & Pneumatic test work.
  • FBT Cryogenic Tank 01. LOX Storage Tank( Double wall Storage Tank) Capacity 700m3.
  • Piping Isometrics, Structure drawings & Equipment and Structural GAD’s.
  • Pre fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.

SITE PROJECT ENGINEER

SOPAN O & M COMPANY PVT. LTD.
12.2020 - 03.2021
  • Client: Indian Oil Corporation Limited.
  • Project name: IOCL TANKAGE PIPING EXTENSION PROJECT MANMAD Maharashtra for MS, HSD, ETHANOL, BIO- DEISEL, fire water, service sir & foam pump & piping, pipeline work.

SITE PROJECT ENGINEER

Bharat Petroleum Corporation Limited.
08.2019 - 11.2020
  • Project name: BPCL POL Terminal Installation Haveli Pune Maharashtra construction of fire water tanks & 45000.00 KL of petroleum product storage tanks including 5 nos. of underground tanks and 11 nos. cone roof tanks 3 nos. of floating roof tanks for MS, HSD, SKO, ETHANOL, BIO- DEISEL, ATF,& Hydrocarbon, fire water , service sir & foam pump & piping, pipeline work.

SITE PROJECT ENGINEER

AARVI ENCON LIMITED.
11.2018 - 06.2019
  • Client: Cairn/Vedanta India Ltd. Barmer / Rajasthan (oil & gas).
  • Project name: MPT MBA Project, Process Underground /above pipeline & Structural Work.

PROJECT ENGINEER

XICON INTERNATIONAL LIMITED.
04.2018 - 10.2018
  • Package handled: LOX Flat Bottom Tank.
  • EPC Client: INOXCVA (INOX INDIA PVT. LTD.).
  • Project name: Installation of Air Separation Unit of capacity L200 TPD.
  • Erection & Fabrication of FBT Tank, Piping, Structure Works.
  • FBT Cryogenic Tank- 1a.LOX FBT Tank Capacity 900m3.

PROJECT ENGINEER

Linde India Limited.
11.2017 - 04.2018
  • Package handling: LOX / LIN Flat Bottom Tank.
  • Client: JSW, Techno Project Management Limited, Dolvi. Maharashtra.
  • Project name: Installation of Air Separation Unit of capacity 900 TPD.
  • Erection & Fabrication of tanks and Piping Works.
  • FBT Cryogenic Tank 1a. LOX FBT Tank Capacity 1000m3 1b. LIN FBT Tank Capacity 900m3.
  • Piping Isometrics, Structure drawings & Equipment and Structural GAD’s.
  • Pre fabrication field for preparing Field & Shop joints.
  • Familiar with material inspection, dimensional check and documentation as per construction, Material standards.

Welding & Piping Foreman

Technomak Energy International FZC (UAE)
11.2016 - 11.2017
  • Package handle: Calciner’s 1&2.
  • Contractor: Petrofac/Bechtel.
  • Client: EGA (Emirates Global Aluminum’s Al Taweelah) Khalifa Industrial Zone, Abu Dhabi (KIZAD).
  • Project name: Al Taweelah alumina Refinery Project.

Mechanical Engineer

XICON INTERNATIONAL LTD.
Kadapa
07.2015 - 10.2016
  • Client: V Tech Wabag Ltd.
  • Project: R.T.P.P (Rayalaseema Thermal Power Plant) Distt Kadapa (A.P) 600 MW Coil based Power Plant.
  • Erection & fabrication of Piping.
  • Erection & Preassembly Fuel oil System L P Piping.
  • Familiar with material inspection, dimensional check and documentation as per Construction, Material standards.
  • Submission of weekly and monthly reports.
  • Site coordination and Client coordination.

Education

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM (QMS) LEAD AUDITOR COURSE -

TUV SUD South Asia
08.2025

NDT Level II - PT,VT,RT,MPT, UT

IANT (INSTITUTE OF ADVANCED NDT TECHNOLOGY)
01.2017

DCA - Diploma in Computer Application

RIIT Educational & Welfare Trust
01.2017

Diploma in Mechanical Engineering - Mechanical Engineering

HSBTE NCR Polytechnic
01.2015

12th - BSEB (Bihar school examination Board)

P.N.College, Parsa, Chhapra, Saran, Bihar
Chhapra, Saran, Bihar
01.2012

10TH - BSEB (Bihar school examination Board)

High School Parsa, Chhapra, Saran, Bihar
Chhapra, Saran, Bihar
01.2010

Skills

  • Welding Operations
  • Welding Procedure Qualification Tests
  • Welder Performance Qualification Tests
  • Monitoring Welding Jobs
  • Welding Procedure Specifications (WPS)
  • Procedure Qualification Records (PQR)
  • Welder Performance Qualification (WPQ) Records
  • Welder Continuity Records
  • Weld Maps
  • Welding Data
  • Material Test Certificates Verification
  • Calibration of Welding Equipment
  • Quality Control
  • Inspection of Raw Materials
  • Material Inspection Report Preparation
  • Final Inspection of Structural Welding
  • Dimensional Inspection
  • Welding In Process Inspection
  • NDT Reports Evaluation
  • Welding Qualification Certifications Review
  • Radiography Reports Review
  • NDT Methods Organization
  • Calibration Records Maintenance
  • Shutdown Inspection Witnessing
  • Inspection of Pipes, Fittings, Flanges
  • Hydro Test Witnessing
  • Welder Qualification
  • Inspection of Pressure Vessels
  • NDT Methods (RT, UT, MT, PT, VT)
  • Coating Survey
  • Insulation Damage Check
  • Inspection of Consumable Items
  • Communication Skills
  • Adaptability
  • Discipline
  • Fast Learner
  • Hard Working

Languages

  • English
  • Hindi
  • Bhojpuri

Disclaimer

I hereby declare that above mentioned details are correct and complete to the best of my knowledge. If you find my resume up to your expectations, I would surely expect a position for myself in your Organization.

Areas Of Expertise

Conducting the welding procedure qualification tests & Welder performance qualification tests for butt joints, pipe joints tube to tube joints & plate joints., Monitoring stage wise welding jobs including pre-heating, post heating & PWHT (post weld heat treatment)., Preparing the following welding documents: Welding Procedure specifications (WPS), Procedure Qualification Records (PQR), Welder Performance Qualification (WPQ) records, Welder Continuity Records, Weld maps & Welding Data as per ASME sec IX., Monitoring welder’s performance & preparation of weld defect analysis report., Verifying Material test certificates for welding consumables & raw materials., Executing periodical calibration for welding equipment., Inspection of raw materials & test certificates and the material identification for further traceability., Preparation of material inspection report for the inspected material., Final inspection of structural welding & dimensional inspection of the finished products., Welding In process inspection / Spot check to ensure qualified Welder, procedure and consumable in use., Inspection / Evaluation of DPT / MPT / UT / RT /VT Testing reports, Welding Qualification Certifications, WPS, PQR as per applicable codes and standards., Review of Radiography reports and films., Checks NDT reports and establishes welding repair requirements., Responsible for organizing in conjunction with construction all facilities required to conduct various NDT methods; monitor the progress of NDT, repair activities, etc., Responsible for effectively communicating the NDT status, general welding performance and the NDT subcontractor's performance., Maintaining the Calibration records and Ensuring Periodical calibration of Instruments and Gauges., Witnessing shutdown inspection, supervising or monitoring of expediting / inspection engineers for various projects listed below., Inspection of Pipes, Fittings, Flanges Etc., Witness Hydro Test, Hydro Pneumatic Test, pre-heating etc., Welder Qualification of Different Contractors., Inspection and expediting on various pressure vessels, piping, tanks and furnaces, etc. including NDT (RT, UT, MT, PT,VT, Hydro test, Pneumatic test), coating survey, insulation damage check, at various stages during modification work., Inspection of consumable items like electrode, gas, grinding wheel etc. for ensuring physical condition storage test certificate etc.

Personal Information

  • Passport Number: L9023857
  • Father's Name: Mr. Triloke Singh
  • Date of Birth: 08/30/95

Timeline

SR. PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
02.2025 - Current

SR.PROJECT ENGG.

M/s Prakash Construction Eng. Pvt. Ltd.
04.2024 - 11.2024

SR. PROJECT ENGG.

M/s Dreamzwell services Pvt. Ltd.
10.2023 - 04.2024

SR. PROJECT ENGG.

M/s Ellenbarrie industrial Gases Ltd.
02.2023 - 09.2023

PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
06.2022 - 01.2023

PROJECT ENGG.

INOXCVA (INOX INDIA LTD.)
04.2021 - 05.2022

SITE PROJECT ENGINEER

SOPAN O & M COMPANY PVT. LTD.
12.2020 - 03.2021

SITE PROJECT ENGINEER

Bharat Petroleum Corporation Limited.
08.2019 - 11.2020

SITE PROJECT ENGINEER

AARVI ENCON LIMITED.
11.2018 - 06.2019

PROJECT ENGINEER

XICON INTERNATIONAL LIMITED.
04.2018 - 10.2018

PROJECT ENGINEER

Linde India Limited.
11.2017 - 04.2018

Welding & Piping Foreman

Technomak Energy International FZC (UAE)
11.2016 - 11.2017

Mechanical Engineer

XICON INTERNATIONAL LTD.
07.2015 - 10.2016

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM (QMS) LEAD AUDITOR COURSE -

TUV SUD South Asia

NDT Level II - PT,VT,RT,MPT, UT

IANT (INSTITUTE OF ADVANCED NDT TECHNOLOGY)

DCA - Diploma in Computer Application

RIIT Educational & Welfare Trust

Diploma in Mechanical Engineering - Mechanical Engineering

HSBTE NCR Polytechnic

12th - BSEB (Bihar school examination Board)

P.N.College, Parsa, Chhapra, Saran, Bihar

10TH - BSEB (Bihar school examination Board)

High School Parsa, Chhapra, Saran, Bihar
MUNNA KUMAR SINGH