Summary
Overview
Work History
Education
Skills
Work Availability
Affiliations
Work Preference
Accomplishments
Software
Languages
Timeline
Personal Information
Personal Information
Professional Title
Generic
Murali G G

Murali G G

ME Structural Engineering
Chennai,Tamil Nadu

Summary

Results-driven structural steel erection professional with over 23 years of experience in project and construction management, specializing in metro rail infrastructure projects. Skilled in coordinating complex steel assembly operations, ensuring strict adherence to safety protocols and quality standards. Proven track record of completing high-precision erection work within tight urban timelines and challenging site conditions, particularly in metro rail projects, railway, and high-rise buildings. Dynamic professional with expertise in project supervision, construction coordination, and technical liaison with government agencies, clients, consultants, and contractors. Proficient in inspecting field sites, evaluating conditions, collecting survey data, and supervising construction work to meet specifications and drawings effectively.

Overview

24
24
years of professional experience
6
6
years of post-secondary education
3
3
Languages

Work History

Sr. Engineering Manager - Design (Viaduct)

Larsen and Toubro Ltd (L&T Construction)
Bangalore
01.2024 - Current
  • Support the Civil Team Leader for the smooth implementation of the Project for all design and construction issues related to civil design.
  • Review all detailed design and re-design from the design consultant.
  • Attend the periodical site inspection during construction and the defects liability period to resolve any civil structural design and construction issues arising.
  • To support Lead Interface Coordinator on the interfacing related civil and track work, like all interfacing work civil to track, and civil to railway systems, etc.
  • Reviewing all technical reports (Basis of Design, Alignment, Geotechnical, Structural & Architectural, Tunneling, Dilapidation survey etc.) for the Deep Underground Stations and associated Tunnels.
  • Ensuring design principles and assumptions meets the ITT & Contract requirements.
  • Ensuring design information is thoroughly reviewed for buildability, safety and maintainability, ‘completeness’ accuracy, quality & technical suitability.
  • Ensuring designs are compliance with standards and requirements for various design packages.
  • Oversaw strong team of engineering personnel.

Deputy General Manager

Egis India Consulting engineers Pvt Ltd
Surat
08.2022 - 12.2023
  • Company Overview: Egis India Consulting engineers Pvt Ltd, India.
  • Support the Civil Team Leader for smooth implementation of the Project for all design and construction issues related to civil and track design.
  • Review all detail design and re-design from design consultant or proposed by contractors.
  • Assist Civil Team Leader in appraising bids as part of the bid evaluation process in civil and track packages and in evaluating of the capacity of contractors.
  • Attend the periodical site inspection during construction and the defects liability period to resolve any civil structural design and construction issues arising.
  • To support Lead Interface Coordinator on the interfacing related civil and track work, like all interfacing work civil to track, and civil to railway systems, etc.
  • To review civil and track related contractor’s interfacing reports, to attend all civil related interfacing meeting, to monitor all civil related interfacing issues closed out.
  • As a GEC (General Engineering Consultant) Involved in Depot construction works at Bhesan depot location including construction of Workshop Building, Inspection Building, Manual Wash Building, Stabling Shed, Permanent Way Building, Vehicle Wash Building, Admin Building, Security Building, Pump Station, Water tank, Pit Wheel Lathe, Boundary Wall, Electrical Light pole foundation/pedestal, Signal Pole foundation Car parking foundations, Storm Drainage channel Train Access Platform, Fencing, Road Works with landscaping, signage boards and lighting fixing including sewer, Storm, and potable internal depot network utilities works etc.
  • Coordinate with DDC (Detailed Design Consultants) for delivery of the GFC drawings to the contractor on time; submitting all reports and deliverables by their due dates; make presentations to client and stakeholders.
  • Plans, organizes, and ensures adequate staffing, execution, and monitoring of all field engineering activities and related support operations.
  • Provides guidance regarding scope of work, schedules, procedures, field construction problems, and other technical information.
  • Collaborates with construction management to eliminate any hazards associated with the work that may adversely affect the environment or the safety or health of employees.
  • Maintains project control documentation, design drawings and specifications, back-charge documents, change orders, etc.
  • Reviews material submittals, recommends approval, forwards to the Client for final approval and follows-up with the Client, as applicable.
  • Conducting site safety and quality audits with contractor’s representatives in order to identify progress hindrances and quality issues.
  • Reviewing drawings (shop drawing and GFC), method of statements, RFI’s all the construction activities.
  • Control of non-Conformance Reports, field Change works, corrective & preventive action.
  • Egis India Consulting engineers Pvt Ltd, India.

Senior Project Execution Expert and Design Coordinator

Louis Berger Consulting Pvt Ltd
Mumbai
02.2019 - 06.2022
  • Company Overview: General Consultancy Services
  • The 32.32 km (20.08 mi) line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala to Kasarvadavali.
  • Supervised steel structure erection for elevated metro rail corridor, completing all sections ahead of schedule.
  • Managed a team of 45 skilled workers including riggers, welders, and equipment operators.
  • Implemented enhanced safety protocols resulting in zero lost-time incidents over 3.5 years.
  • Coordinated with multiple stakeholders to minimize traffic disruption during urban erection activities.
  • Optimized installation sequences reducing overall project timeline by 12%.
  • I worked as a Senior Project Execution Expert (Package In charge) – Depot (OCC, BCC Building, Admin Building, Stablish shed works and RSS building), Stations, Viaduct and Casting Yard reporting to Project Director in this Mumbai Metro Line 4 Project, Mumbai.
  • I am supervising the depot OCC, BCC and Admin building, Switch Yard, Pit Wheel Lathe, Auto Coach Wash plant and control Room, Test Track (Ballasted and Ballast less Track, Unloading Platform for Coach Unloading, Internal Cleaning, Underground Water Tank, Administrative building including workshop, stabling line, combined Services for Signaling S&T Telecom, Power Supply, Pull Pits, MEP and HVAC services, M& P, Retaining walls, Compound walls.
  • Ensuring that, all field tests and site inspections are conducted as per approved Inspection test plan.
  • I supervising building Finishes, Approach Road works inside Depot, reviewing method Statements, resolving technical issues and attending meeting with Client, arranging Interface Coordination meeting with Contractor’s and team, Attending progress review meeting, financial meeting.
  • Executing UG tanks, Admin Building (B+G+3 floors) including workshop, Internal cleaning, Contractor’s payment certificates, Architectural and building finishes.
  • I am Ensuring full and detailed permanent site records, which will include site correspondence, survey data, quality acceptance data, site diaries, measurement and certification, minutes of meetings, and records of all other contractually relevant matters for all depot civil and structure work.
  • Identifying the requirement of Depot Equipment and recommending the list to higher management for Procurement and Coordination between equipment supplier & Operation & maintenance team for Operation & maintenance training.
  • Technical Specifications & Schedule of Quantities Estimates for depot and elevated stations of MMRDA.
  • Depot Equipment initializing with Design, Approval, Procurement, Testing & Commissioning.
  • In charge for construction of Viaduct & Station and depot works.
  • Assisting the Site team in administering the contract conditions.
  • Interpreting contract conditions in response to Contractor's claims, project leadership queries and Employer queries.
  • Drafting contractual letters for day-to-day issues in consultation with Project Manager.
  • Managing potential variations and claims including records-keeping and following up with the Contractor, site engineers and Client.
  • Assisting in review of payment applications.
  • Preparing documentation for potential future arbitration hearings.
  • Assisting the PM in strictly adhering to the contractual time limits for Engineer and Employer.
  • Setting up weekly and monthly targets, monitoring and review planning.
  • Plan and manage the constructions team development and resource allocation.
  • Liaison with Government officials for Right of Way clearance.
  • Liaising with clients for approval and billing and ensuring customer satisfaction.
  • Review and certify the monthly progress claims of contractor and ensure that all measurement is taken as per specification and drawing of the work.
  • General Consultancy Services

Chief Utility and Formation Engineer

SYSTRA MVA Consulting (India) Pvt. Ltd
Meerut
01.2018 - 02.2019
  • Project Management Consulting services for construction of Single line Electrified (2X25 KV) Railway Track complete with Signaling & Telecommunication system and 667 Structure for Khurja-Pilkhani, section (Approx. 222 Route Km).
  • I am supervising the station construction activities such as Secant pile, Station box & Launching shaft excavation with strut supporting system, kingpost installation for strut supporting system.
  • Ensuring that, all field tests and site inspections are conducted as per approved Inspection test plan.
  • I am ensuring that, Contractual requirements are met during execution of work by the Contractor.
  • If it is necessary, I am instructing the Contractor to accomplish the Contractual necessities.
  • I am providing input to my superiors on Contractor’s request for ‘Variations’ and ‘Claims’ etc., and giving recommendations on the subject of Contractual matters.
  • I am ensuring that, the Contractor’s submittals and his records regularly, when non-conformance is observed.
  • I am reviewing all the Method statement related to Station Construction activity and preparing comment sheet for Contractor’s action.
  • Validate and provide data to GC Cost Control Team in verifying the actual progress accomplished by the Contractor, for the purposes of progress payment.
  • Conduct weekly site meetings with the Contractor to track the progress, quality and safety issues.
  • Liaise with senior personnel from the Engineer, Government departments and the utility companies.
  • Keep the team leader and the Construction Manager fully informed on the progress of the Works, staffing requirements, technical matters, etc.
  • Assist the Team leader in overall administration and supervision of the engineering contracts with particular responsibility for the following aspects.
  • Preparing Daily Diary including adequate records of actual site progress against baseline programme, material delivery, off site inspection, test reports, inclement weather, visitors etc.
  • Ensure that standards accepted are applied uniformly throughout and to coordinate progress and interface problems.
  • Conduct Site walk through regularly and Prepare monthly and weekly report.
  • Certify the quantities of works satisfactorily completed for monthly progress payment.
  • Prepare for and organize site visits by Government officials.

Senior Engineer

AECOM India Pvt Ltd
Ahmedabad
01.2016 - 12.2017
  • Section Engineer/ Elevated Viaduct+ 3 Stations and Casting Yard & Launching Role - R2W1 (East - West) (Local), Ahmedabad Metro Rail Project – Phase I.
  • Led steel structure assembly for 3 elevated metro stations and connecting viaducts.
  • Directed critical lift operations for 80-ton steel trusses in congested urban environments.
  • Monitored quality control processes ensuring 100% compliance with project specifications.
  • Collaborated with engineering team to resolve field modifications and structural conflicts.
  • Maintained comprehensive documentation for all erection activities and quality inspections.
  • Responsible for Carried out Construction supervision and Design Checking for the Design and Construction Contracts as an Engineering Consultant and is responsible for bringing the project from design stage to Construction stage and coordinate for final commissioning with all interfacing contractors.
  • Detailed documentation pertaining to Site progress on weekly, monthly, quarterly basis to assist senior and resident engineer for liaising with client in order to have updated programme of the project.
  • Ensured numerous site inspections during construction stage and provide/agreed site changes as per Design Modification Requests (DMR) raised by construction teams.
  • Responsible for review and implementation of construction sequences and methodology related to Viaduct, Tunnel, Station and Ancillary Buildings structures.
  • Preparation of BOQ for civil and structural works of Viaduct, Tunnel, Elevated & UG stations and Evaluation of cost variation during tender stage and execution stage and advice the contractor in order to understand additional cost for completion if any.

Deputy General Manager and Design Coordinator

Egis India Consulting engineers Pvt Ltd
Chennai
06.2012 - 12.2015
  • Company Overview: EMBYE Consortium (Egis Rail, Egis India, Aecome, Yec & Barsil)
  • Detailed Design and Construction of Elevated Viaduct and Stations, Chennai Metro Rail Limited Phase - 1, India.
  • The Phase – I of Chennai Metro Rail project covers a length of 45.046 km network and consists of two corridors i.e. Corridor-I – From Washermenpet to Airport (23.085 Km), Corridor -2 – From Chennai Central to St. Thomas Mount (21.961 km).
  • Performed hands-on steel erection activities including rigging, bolting, and alignment.
  • Assisted in developing innovative erection techniques for curved station roof structures.
  • Participated in daily safety briefings and equipment inspection procedures.
  • Executed precision alignment of structural components within millimeter tolerances.
  • Responsible for Carried out Construction supervision and Design Checking for the Design and Construction Contracts as an Engineering Consultant and is responsible for bringing the project from design stage to Construction stage and coordinate for final commissioning with all interfacing contractors.
  • Activities performed in Design Coordination and Execution: Responsible for Carried out Site Supervision as an Engineering Consultant and is responsible for bringing the project from design stage to Construction stage and final commissioning.
  • Ensure works is being executed generally in accordance with the Contract, specification and requirements of the governing Code, Dealing with Contractor claims, variation and Extension of time as per FIDIC Contract.
  • Execution generally Co-ordinate with Contract, Geotech, Design, Quality, Safety, Utility, MEP, Track, System & Interface teams.
  • Detailed documentation pertaining to design progress on monthly basis for liaising with client in order to have updated programme of the project.
  • Execution, Contractor bill checking, Attending meeting, Preparing agendas Reports and Client presentation.
  • In charge for Launching Girders and Segment Casting Yard and Parapet wall casting yard.
  • Detailed documentation pertaining to Site progress on weekly, monthly, quarterly basis to assist senior and resident engineer for liaising with client to have updated programme of the project.
  • Ensured numerous site inspections during construction stage and provide/agreed site changes as per Design Modification Requests (DMR) raised by construction teams.
  • Preparation of BOQ for civil and structural works of Viaduct, Tunnel, Elevated & UG stations and Evaluation of cost variation during tender stage and execution stage and advice the contractor in order to understand additional cost for completion if any.
  • Assisting in the detailed design with the help of software as well as performing hand calculations and Analyses and design of all enabling structures (RCC & Steel).
  • Attending internal meetings to facilitate proper coordination with Architects, Clients and Contractors, coordinating with different disciplines for preparation and periodic submission of reports to the Clients.
  • Prepared the construction scheme of Top‐Down methodology of Underground Stations and passing through scheme of tunnels under the historically important structures.
  • Knowledge in Structural and Architectural drawings reviews with MEP & Interface requirements for Station Buildings and Liaising with CAD Technicians in the preparation of final drawings.
  • Examined and ensured the design and drawing provided by consultant complies with the contract requirement and doesn’t exceed the cost implication as well.
  • Efficiently managed various consultants like the Geotechnical, Architectural, Structural, Tunnel, Instrumentation, Traffic, Building Condition Survey, TBM agency etc. corroborating all interface issue.
  • EMBYE Consortium (Egis Rail, Egis India, Aecome, Yec & Barsil)

Senior Project Engineer (Structures)

Sabari Foundation Private Limited
01.2007 - 05.2012
  • Supervision of Bored cast in-situ piles consists of double basement + Ground + 3 floors. The total plot area is 4.14 Acres with a constructed area of 6 Lakes Sft. Monitoring of works from marking of foundations to handing over of the project is done. Critical care is taken in carrying out the works such as structure, finishing of civil works, External dry granite cladding, structural glazing, ACP works.
  • Supervision consists of 20 Villas, each with [Basement + Ground + 1 floors] and the total area covering 300000 sft. The works include structure, finishing works and interior works with Italian marble finish.

Project Engineer & Quality Engineer (Structures)

SPS Constructions Private Limited
06.2005 - 12.2006
  • QC Inspection and monitoring the quality every stage of work in progress which comply with the clients specification.
  • Preparing report for inspection by clients and submitting for approval.
  • Liaison with QC DEPARTMENT of client to conduct inspection as per clients program and Maintaining of various tests by Third party / Testing agencies.
  • Submitting daily reports to QC Manager and verify QC Inspection reports and testing and Inspection of materials received.
  • Auditing material receiving and issue report and their traceability.
  • Compiling necessary concrete reports vis-via test reports for submitting the clients and Preparation of draft inspection and Test Reports.
  • Preparation of draft Method of statement.

Project Engineer & Quality Engineer (Structures)

SPS Constructions Private Limited
06.2001 - 05.2003
  • Complete responsibility of the smooth working of the Project.
  • Coordination with Architectural Agency, Structural Consultants and other consultants for completion of the scheduled working time and quality.
  • Attend Programmed meetings, Conference meetings, Seminars.
  • Prepare Bar chart schedules of the project, prepare building wise schedules for quantities and materials.
  • Attend to all visiting clients, give them the necessary project information, guide them to the sales office and clarify any queries regarding amenity work.
  • Check all the running account bills prepared by the senior engineer and submit them to the head office for further procedures.
  • Submit the daily reports of the site to the head office and report the progress of the work to the chief engineer.

Education

M.E - Structural Engineering

Annamalai University
06.2003 - 05.2005

B.E - Civil Engineering

Vellore Institute of Technology
08.1997 - 06.2001

Skills

Heavy structural steel erection & installation

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Affiliations

  • I am affiliated with various metro rail projects, focusing on areas such as project management, engineering design, and stakeholder engagement. My experience includes collaboration with government agencies, private contractors, and urban development teams to ensure successful project execution and integration into the existing transport infrastructure.

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementWork-life balanceCompany CultureFlexible work hoursPersonal development programsHealthcare benefitsTeam Building / Company Retreats

Accomplishments

I have successfully executed various metro rail projects, demonstrating my expertise in civil engineering and project management. My accomplishments include overseeing the construction of multiple stations and tunnels, ensuring adherence to safety and quality standards. I have effectively coordinated with teams and stakeholders, managed project timelines and budgets, and implemented innovative solutions to overcome challenges. These experiences have strengthened my skills in civil execution within the metro rail sector.

Software

Stadd Pro, MIDAS, Adsec, Microsoft Project and Primavera, Auto Cad, Microsoft Excel, Word, and Power Point

Languages

English
Tamil
Hindi

Timeline

Sr. Engineering Manager - Design (Viaduct)

Larsen and Toubro Ltd (L&T Construction)
01.2024 - Current

Deputy General Manager

Egis India Consulting engineers Pvt Ltd
08.2022 - 12.2023

Senior Project Execution Expert and Design Coordinator

Louis Berger Consulting Pvt Ltd
02.2019 - 06.2022

Chief Utility and Formation Engineer

SYSTRA MVA Consulting (India) Pvt. Ltd
01.2018 - 02.2019

Senior Engineer

AECOM India Pvt Ltd
01.2016 - 12.2017

Deputy General Manager and Design Coordinator

Egis India Consulting engineers Pvt Ltd
06.2012 - 12.2015

Senior Project Engineer (Structures)

Sabari Foundation Private Limited
01.2007 - 05.2012

Project Engineer & Quality Engineer (Structures)

SPS Constructions Private Limited
06.2005 - 12.2006

M.E - Structural Engineering

Annamalai University
06.2003 - 05.2005

Project Engineer & Quality Engineer (Structures)

SPS Constructions Private Limited
06.2001 - 05.2003

B.E - Civil Engineering

Vellore Institute of Technology
08.1997 - 06.2001

Personal Information

  • Nationality: Indian
  • Marital Status: Married

Personal Information

  • Nationality: Indian
  • Marital Status: Married

Professional Title

Senior Engineering Manager - Design (Civil Structures) and Chief Resident Engineer (Execution) with expertise in Metro Rail Projects, including viaducts, underground structures, casting yards, stations, and depots, as well as railway systems and high-rise buildings.

Murali G GME Structural Engineering