Dynamic and results-driven Mechanical Engineer with five years of experience in the steel industry, particularly in process optimization and maintenance. Seeking a challenging position where I can utilize my skills to contribute effectively to the success of a forward-thinking organization
•Assisted in the planning, execution, and supervision of mechanical maintenance activities for various equipment, ensuring optimal performance and adherence to safety standards.
•Conducted root cause analysis and implemented corrective actions to address equipment failures, resulting in a 15% reduction in downtime.
•Collaborated with cross-functional teams to implement process improvements, leading to a 10% increase in production efficiency.
•Utilized CAD software to design and modify mechanical components, enhancing equipment reliability and longevity.
•Contributed to the development of preventive maintenance schedules, reducing maintenance costs by 20% while improving equipment reliability.
Kaizen and Poka-yoke methodology
undefined Part of the commissioning team of Reheating Furnace#1 in Hot Strip Mill#3, JSW Steel Limited.
(Contractor: Tenova, I
SAP PM(end user)
Ms office
Ms Excel
Solid edge
Hobbies: Playing Cricket, Reading books ,Listening Music’s etc.
Current CTC: 3.9Lakhs/Annum
Notice Period: 1 Month
Expected: 7-8 Lakhs/Annum (Negotiable) DOB: 26.10.1996