Summary
Overview
Work History
Education
Skills
Projectshandled
Internship
Academic Projects
Certification
Accomplishments
Affiliations
Languages
Disclaimer
Timeline
Generic
NAGOOR BASHA SHAIK

NAGOOR BASHA SHAIK

VIJAYAWADA

Summary

Dynamic Planning Engineer with 7 years of experience in project management, billing, coordination,engineering and quantity estimation for water, sewer, and residential projects. Proven leadership and technical expertise have driven project improvements and enhanced operational efficiency. Committed to continuous improvement, leveraging analytical skills to optimize future project initiatives.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Planning Engineer

AMILIONN TECHNOLOGIES PVT LTD
MAHARAJGANJ
11.2022 - Current
  • Prepared daily progress reports and RFIs.
  • Prepared daily, weekly, monthly, quarterly, and annually, work and bill program.
  • Prepared Work Completion and Billing Reports.
  • Arranged all supporting documents for client billing
  • Processed client billing from initiation level to PFMS level.
  • Arranged all supporting documents for sub-contractor billing.
  • Prepared BBS and Quantity Estimation.
  • Engineering and project coordination with clients, engineers, and higher management.
  • Executed the whole project in the absence of the project manager for around six months.
  • Identified, addressed, and cleared site issues along with engineers and clients.
  • Prepared detailed reports on cost estimates, labor requirements, material costs and other variables relevant to projects.
  • Identified any potential conflicts between different stakeholders involved in a project's execution.
  • Provided guidance on resource allocation strategies across various departments involved in a particular project..
  • Organized and coordinated project meetings to review progress, discuss changes and provide updates.
  • Analyzed project risks and developed mitigation strategies to minimize impact on timelines and costs.
  • Conducted feasibility studies and cost-benefit analyses for proposed projects to inform strategic decision-making.
  • Managed movement of materials
  • Assisted fellow planning staff members with tasks to maintain proper workflows.
  • Developed comprehensive project plans, incorporating timelines, resource allocation, and budgeting to ensure project completion within agreed parameters.
  • Traced missing material and shipments through vendor and customer communications.
  • Collaborated with cross-functional teams such as sales, operations, providing input into their decision making process when necessary.
  • Maintained records of all documents related to projects including cost estimates, work orders.
  • Provided technical support throughout the life cycle of a project by troubleshooting problems that arise during its execution.
  • Created presentations outlining key aspects of each project such as objectives, timelines.
  • Developed risk management plans based on potential risks associated with projects being undertaken by the organization.
  • Coordinated with suppliers and subcontractors to ensure timely delivery of materials needed for projects.

Project Engineer

Saradhi Projects Pvt Ltd
HYD
03.2022 - 11.2022
  • Prepared daily progress reports and daily work plans.
  • Monitored Site Execution.
  • Prepared Quantity Estimation and BBS.
  • Managed the requirement of materials.
  • Coordinated with management on a daily basis.
  • Managed Work Delay Management
  • Performed reconciliation of material on a regular basis.
  • Prepared DPR, WPR, and MPR.
  • Prepared micro-level planning and scheduling of the project.
  • Participate in management meetings.

Project Engineer

Land India Developers Pvt Ltd
Manikonda
04.2021 - 02.2022
  • Prepared daily progress reports and daily work plans.
  • Monitored Site Execution.
  • Executed apartment work as per drawings and with the required specifications.
  • Supervised site operations for building residential apartments.
  • Executed tasks adhering to predetermined quality standards.
  • Coordinated site management for work completion, material needs, fund status, and RA Bill submission to clients.
  • Prepared Quantity Estimation and BBS.
  • Managed the requirement of materials.
  • Coordinated with management on a daily basis.
  • Managed Work Delay Management
  • Performed reconciliation of material on a regular basis.
  • Prepared DPR, WPR, and MPR.
  • Prepared micro-level planning and scheduling of the project.
  • Participate in management meetings.

Civil Engineer

M/s Power Mech Projects Ltd
Noida
05.2018 - 03.2021
  • Prepared process design calculations for sewage treatment plants for current projects or tenders.
  • Prepared BEP, layout, and hydraulic flow diagram for the sewage treatment plant for current projects or tender.
  • Prepared General Arrangement (GA) Drawings for Sewage Treatment Plants.
  • Designed Interception and Diversion Works.
  • Prepared BBS and BOQ for construction activities.
  • Calculated the actual cost of civil works for the project, as per material procurement and work done by subcontractors at each site.
  • Coordinated with each site management regarding work completion, material requirements, fund status, and RA Bill submission to the client.
  • Prepared DPR, WPR, and MPR.
  • Checked the monthly RA bills of subcontractors from each site, as well as engineering-related bills, along with their bill register, and then submitted them to the finance department after approval from higher authorities for payment.
  • Participated in management meetings.
  • Prepared Technical Data Sheet of Equipment for Sewage Treatment Plant.
  • Prepared comparative data sheet of equipment to finalize the vendor.
  • Performed engineering coordination.
  • Reviewed General Arrangement (GA) drawings, structural drawings, and HFD as per tender specifications.
  • Reviewed the tender documents and sent the requirements to concerned persons.
  • I received offers from vendors, designers, subcontractors, and suppliers for current projects or tender costing.
  • Prepared design mix calculation as per required specifications in the tender.
  • Handled the work related to engineering and obtained approval from the client.
  • Prepared and submitted a correspondence letter to the client.
  • Prepared civil works costing, with quantity estimation for cost estimation, as per tender specifications for a particular tender bidding or current project.
  • Studied tender documents and provided pre-bid queries to the BD department.
  • I received an offer from an approved vendor or supplier for the tender costing.

Education

B. Tech - Civil Engineering

Lakireddy Balireddy College of Engineering
Mylavaram
04-2018

Diploma - Civil Engineering

Govt. Polytechnic
Hyderabad
05-2015

10th - A.P. State Board

LHR Govt. High School
Mylavaram
04-2012

Skills

  • Project Planning
  • Client Billing
  • Sub Contractor Billing
  • Project management
  • Leadership capability
  • Coordination
  • Adaptability
  • Communication
  • Creativity
  • Team Work
  • Problem Solving
  • Decision making
  • BBS
  • Engineering & Process-Designing
  • Engineering Coordination
  • Quantity and cost estimation
  • Contract negotiation
  • Bill verification
  • Reconciliation
  • Excellent technical skills
  • Site inspections

Projectshandled

  • Erection testing commissioning of 15 MLD, 10 MLD, 2.5 MLD STP along with 130 Km sewerage network at Palwal Town under AMRUT with 5-year O&M.
  • Erection testing commissioning of 20 MLD, 8 MLD STP at Karnal Town under AMRUT with 5-year O&M.
  • Erection testing commissioning of 5 MLD STP at Gudivada Town under AMRUT with 5-year O&M.
  • The River Front residential project at Manchirevula.
  • The Brigade residential project at Gandham Guda.
  • Shivpuri residential project at Manchirevula.
  • Precast Villa project at Tukkuguda.
  • Jal Jeevan Mission Maharajganj UP

Internship

  • 3 Months, Internship on Land Surveying and layout at MRO Office, East Meredupally, Hyderabad.
  • 1 Month, Internship on Construction of Waste Water Line at Associate Engineering Consultancy, Mylavaram.
  • 3 Months, Internship as Technical Assistant for Deputy Executive Engineer in Panchayat Raj Department, Mylavaram.

Academic Projects

An experimental investigation on the strength properties of a concrete with concerned GGBS proportions.

Certification

  • Surveying using Total Station & Auto Level
  • AutoCAD and Building Design from CADD Centre, Hyderabad.

Accomplishments

  • Completed 10th, Diploma & B tech- First class with distinction
  • Won Many awards in Chess
  • Achieved Scholl Second in 10 th
  • Achieved Top project of the year in college with main project

Affiliations

  • Playing Badminton,Cricket & Chess
  • Listening Music
  • Watching Movies

Languages

Telugu
First Language
English
Advanced (C1)
C1
Hindi
Proficient (C2)
C2

Disclaimer

I hereby declare that, the above information furnished by me is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.

Timeline

Planning Engineer

AMILIONN TECHNOLOGIES PVT LTD
11.2022 - Current

Project Engineer

Saradhi Projects Pvt Ltd
03.2022 - 11.2022

Project Engineer

Land India Developers Pvt Ltd
04.2021 - 02.2022

Civil Engineer

M/s Power Mech Projects Ltd
05.2018 - 03.2021

B. Tech - Civil Engineering

Lakireddy Balireddy College of Engineering

Diploma - Civil Engineering

Govt. Polytechnic

10th - A.P. State Board

LHR Govt. High School
NAGOOR BASHA SHAIK