About 5.5 years of experience in the Electrical and Electronics industries. Key skills include basic engineering, detail engineering. Design electrical schematics, single-line drawings using AutoCAD (Electrical). Generation of the bill of materials, project schedule, and monitoring project progress. Involved in procurement activities. Involved in field engineering, construction, and commissioning assistance. Involved in site engineering support. Versatile Project Engineer offers quality assurance, root cause analysis and project management expertise coupled with outstanding multitasking and communication abilities. Polished in observing and monitoring project milestones and interacting with clients to interpret needs. Sound knowledge of design and visualization software.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Senior Project Engineer

George Multi Tech Systems Pvt Ltd.
04.2024 - Current

Assistant Project Engineer

George Multi Tech Systems Pvt Ltd.
Chennai
11.2021 - 03.2024

Electrical Engineer

George Multi Tech Systems Pvt Ltd.
11.2019 - 11.2021

Education

B.E - Electrical & Electronics Engineering

Government College of Engineering
Bodinayakkanur, Tamil Nadu
01.2019

Higher Secondary -

P.L.W. A Higher Secondary School
V.K. Puram, Tirunelveli
01.2015

S.S.L.C -

P.L.W. A Higher Secondary School
V.K. Puram, Tirunelveli
01.2013

Skills

  • AutoCAD and electrical design
  • Project management and scheduling
  • Cost estimation and budgeting
  • Risk assessment and mitigation
  • Purchasing and procurement strategies
  • Schematic drawing and reading
  • Electrical panel design and development
  • Panel wiring and troubleshooting
  • Technical documentation

Other Initiatives

  • Assembled solar control panel's mechanical arrangement in General Electric
  • LV5 solar inverter panel wiring in General Electric
  • Design and develop electrical panels for power distribution
  • Draw a component structure and develop a drawing using AutoCAD
  • Strong mechanical and electrical work assessment knowledge
  • Drawing and designing an electrical distribution network
  • Reading schematics and doing panel wiring
  • Experienced in panel wiring and designing
  • Good knowledge of hydraulic systems and developing hydraulic equipment
  • Design and develop LT electrical panels and wiring
  • Control panel wiring and design

Languages

  • English
  • Tamil
  • Malayalam (Basics)

Disclaimer

I hereby declare that the information furnished above is true to the best of my knowledge.

Major Projects Handled

  • 11 kV substation testing and commissioning, Global Info City, Perungudi, preparation of single line diagrams, preparation of test procedures and testing reports, contact resistance test at all the VCBs, checking and inspection of all the testing equipment and components, preparation of pre-commissioning report, testing of all the earth bits, insulation test for all the VCBs, checking and correcting all the drawings, transformer insulation testing, LT side cable insulation testing, relay current injection testing, preparation of final test report, coordinate with other service disciplines
  • Power electronics multimodal factory, GE, preparation of single line diagrams, preparation of cable routing layout, and lighting and small power distribution layout, preparation of cable sizing calculation, cable tray or trench sizing, preparation of cable schedule, preparation of bill of materials (BOM or MTO), preparation of purchase requisitions (PR or RFQ), coordinate with other service disciplines, preparation of feeder list, designed and manufactured all the main distribution panels, testing and commissioning of main distribution panels
  • Insulation tester and functional test bench, GE, preparation of general mechanical drawing, component and material sizing and selection, preparation of cable schedule, preparation of bill of materials (BOM/MTO), preparation of purchase requisitions (PR/RFQ), coordinate with other service disciplines, purchase and configure all the components, preparation of specifications (cables)
  • 11 kV harmonic filter installation and commissioning activities for GE Power Conversion, Chennai
  • Design and installation of customized test benches for internal testing at MNCs like GE, ESAB
  • 8 MVA transformer installation and commissioning

Personal Information

  • Father's Name: A.Manickam
  • Date of Birth: 08/29/98
  • Marital Status: Single

Languages

Tamil
First Language
English
Upper Intermediate (B2)
B2
Hindhi
Elementary (A2)
A2

Certification

  • Certificate Course in AUTOCAD ELECTRICAL .

Softwares:

  • AutoCAD
  • AutoCAD (Electrical)
  • Eplan
  • Siemens LOGO

Timeline

Senior Project Engineer

George Multi Tech Systems Pvt Ltd.
04.2024 - Current

Assistant Project Engineer

George Multi Tech Systems Pvt Ltd.
11.2021 - 03.2024

Electrical Engineer

George Multi Tech Systems Pvt Ltd.
11.2019 - 11.2021

B.E - Electrical & Electronics Engineering

Government College of Engineering

Higher Secondary -

P.L.W. A Higher Secondary School

S.S.L.C -

P.L.W. A Higher Secondary School
Nandhakumaran M