Summary
Overview
Work History
Education
Skills
Projects
Languages
Certification
Interests
Timeline
Generic
Narasimha Rao Uppada

Narasimha Rao Uppada

Project Manager
Palakkad,Tamil Nadu

Summary

Having 17+ years of experience in Execution & Commissioning of Electrical Infrastructure projects like 220,132 KV Substation & EHV Transmission lines, Wind Power, Electrical Projects (RGGVY, R-APDRP, HVDS, Maha Infra etc.), Lift Irrigation Projects and Water Treatment Plants (WTP), National Industrial Corridor Development Programme (NICDC) Projects.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Project Manager

NCC LIMITED
12.2024 - Current
  • Survey, construction and commissioning of 33 kV, 11 kV lines, 33/11 kV substations, HT cable, LT cable, and UG cable.
  • Erection of 33 kV, 11 kV lines, LT lines, 500, 315, 200, and 100 kVA DTRs, and 33/11 kV substation.
  • Preparing BOQs for line works and substation works. Preparation of subcontractor bills, client bills, and material consumption statements.
  • Attending progress review meetings and preparing reports highlighting the status of critical activities, problem areas, constraints on achieving planned progress, schedule impacts, critical issues, and action plans.
  • Monitor scope, quality, budget, schedules, productivity, and work in progress to ensure project plans are effectively implemented.
  • Proper work planning for location activities and communication with higher and lower levels.
  • Handover and takeover activities with documentation.
  • Enhanced working relationships by participating in team-building activities.
  • Developed excellent working knowledge of industry trends and improvements in processes.

Project In charge

SRRM ENERGY
01.2022 - 12.2024
  • Survey, construction and commissioning of 33 kV, 11 kV lines, 33/11 kV substations, HT cable, LT cable, and UG cable.
  • Erection of 33 kV, 11 kV lines, LT lines, and a 33/11 kV substation.
  • Preparing the BOQ for line works and substation works.
  • Preparation of subcontractor bills, client bills, and material consumption statements.
  • Proper work planning for location activities and communication with higher and lower levels.
  • Attending progress review meetings and preparing reports highlighting the status of critical activities, problem areas, and constraints on achieving planned progress.

Deputy Manager

MEGHA ENGINEERING & INFRASTRUCTURE LTD
Bhubaneswar, Odisha
04.2017 - 10.2021
  • WTP Project : Construction of Water Treatment Plant (WTP), 83 MLD, 0.25 MLD, Boot Project, Bhubaneswar, Odisha, 33 KV/3.3 KV Substations, 33 KV Lines, Panel Erections, 3.3 KV HT Motors, 0.433 KV LT Motor Erections, Pump Erections, EOT Crane Erections, Sluice Gate Erections, Manifold, and Flow meters.
  • Irrigation Project : Construction of Mega Lift Irrigation Projects (Cluster VII), Ganjam District, Odisha; 33KV/6.6KV substations, 33KV and 11KV lines, panel erections, 6.6KV HT motors, LT panel erections, pump erections, EOT crane erections, sluice gate erections, manifold, and flowmeters.
  • RWSS Project : Construction of Water Treatment Plant (WTP), 75 MLD, RWSS Project, Bhadark (Dist), Odisha, 33 kV/3.3 kV substations, 33 kV lines, panel erections, 3.3 kV HT motors, 0.433 kV LT motor erections, pump erections, EOT crane erections, sluice gate erections, manifold, and flowmeters.
  • Study contract documents and project technical specifications to identify the complete scope of work.
  • Preparing BOQs for lines, pumphouses, and substation works.
  • Obtaining drawing approval for pumphouse, substations, lines from client, EPC, MLIP, DISCOM, and CEIG departments.
  • Coordinating and sharing technical data information, approved drawings, and documents with the head office and site for execution.
  • Raising inspection calls to clients for line, substation, and pumphouse materials.
  • Erection of substation structures, 33 kV, 6.6 kV, 5 MVA, 3.15 MVA, 1.6 MVA, 1 MVA, 0.6 MVA power transformers, and earth mat laying.
  • Erection of 6.6 kV 240 sq mm, 185 sq mm XLPE cable, VT pump (vertical turbine), VT type LT motors/HT motors (200 kW to 5000 kW), 6.6 kV HFSR soft starters, DYCO, and 6.6 kV HT motor feeders.
  • Liaising with E&MR, MRT Team, DISCOM, OPTCL, MLIP, RWSS, Odisha, and Electrical Inspector.

Associate Manager

SMS INFRASTRUCTURE LTD
Madurai, Tamil Nadu
11.2013 - 03.2017
  • Survey, construction, and commissioning of 33 kV, 22 kV, 11 kV lines, 33/11 kV substations, and HT cable, LT cable, and UG cable.
  • Erection of 33 kV, 22 kV, 11 kV lines, LT lines, and 33/11 kV substation.
  • Cable laying and termination (power cable and control cable).
  • Preparing the BOQ for line works and substation works.
  • Preparation of subcontractor bills, client bills, and material consumption statements.
  • Attending progress review meetings and preparing reports highlighting the status of critical activities, problem areas, and constraints on achieving planned progress, schedule impacts, critical issues, and action plans.

Sr. Engineer

SUZLON ENERGY LTD
Anantapur, Andhra Pradesh
09.2011 - 10.2013
  • WIND Power Project at Anantapur and Kadapa.
  • Wind Project 1: Construction of a 250 MW Wind Power Project in Anantapur, Andhra Pradesh, including 33 kV/0.69 kV substations, 33 kV lines, panel erections, 33 kV, 2.1 MW WTP erection, power transformer erection (1, 5, 20, 50 MVA), and HT cable, LT cable, and UG cable termination works.
  • Wind Project 2: Construction of a 200 MW Wind Power Project, Kadapa, Andhra Pradesh; 33 kV/0.69 kV substations, 33 kV lines, panel erections, 33 kV 2.1 MW WTP erection, power transformer erection (1, 5.20, 50 MVA), and HT cable, LT cable, and UG cable termination works.
  • 100 MW wind power plant for customers Mythra and IOCL constructed at Vajrakarur in Ananthapur District, A.P.
  • 100 MW Wind Power Plant for customers NALCO and IOCL constructed at Gandikota in Kadapa District, A.P.
  • Survey, construction, and commissioning of 220/33kV substations, 33kV DP yards, and 33kV lines.
  • 220/33 kV substation and connected 220 kV double circuit EHV line from Uravakonda to Ramapuram (60 km) constructed in Ananthapur District (A.P.) under APTRANSCO.
  • Survey, construction, and commissioning of 132/33 kV substations and 132 kV EHV lines.
  • 132/33 kV substation and connected 132 kV double circuit EHV line from Gandikota to Jammalamadugu (50 km) constructed in Kadapa District, A.P. under APTRANSCO.
  • Handover and takeover activities, with documentation.
  • Proper work planning for location activities and communication with higher and lower levels.
  • Work knowledge of 220/33 kV substations, 33/11 kV substations, and 33 kV lines.
  • Survey, construction, and commissioning of 690 volts/33 kV switchyards.
  • Preparation of the DPR for the 2.1 MW WTG power plant at Vajrakarur, A.P.
  • Proper work planning for location activities and communication with higher and lower levels.

Project Engineer

GTL LTD
Satara, Maharashtra
03.2010 - 09.2011
  • Maha Infra II Project, Satara, Maharashtra
  • 33 kV/11 kV substations, 33 kV lines, panel erections, 33 kV, 22 kV, 11 kV, LT lines, and DTRs (315, 200, 100, 63 kVA).
  • HT Cable, LT Cable, and UG Cable termination works.

Site Engineer

ICOMM TELE LTD
Mayurbhanj, Odisha
06.2008 - 03.2010

RGGVY and HVDS Electrical Project under PGCIL,Construction of the RGGVY Project and HVDS, Mayurbhanj, Odisha.

  • 33 kV lines, panel erections, 33 kV, 22 kV, 11 kV, LT lines, and DTR (100, 63 kVA) works.
  • As per our client's technical specifications and quality procedure.

Education

B-Tech - EEE

Sri Vasavi Engineering college
Tadepallegudem, AP
2006

Skills

  • Project Management
  • Material Management
  • Client Billing & Liasioning
  • MS Office
  • Auto CAD
  • Project management
  • Risk assessment
  • Construction oversight
  • Budget management
  • Quality assurance
  • Technical documentation
  • Client relationship management
  • Team leadership
  • Problem solving
  • Contract negotiation
  • Time scheduling
  • Progress reporting
  • Decision making capacity
  • Time scheduling and allocation
  • Client relations
  • Project cost estimation
  • Project lifecycle expertise
  • Budget forecasting
  • Follow up management
  • Vendor relationship maintenance
  • Meeting facilitation

Projects

  • RDSS Project under AIIB Scheme at Jalgaon, Maharashtra.
  • Client : MSEDCL, Cost : 540 Cr,
  • Project Details :

       Survey, Construction & Commissioning of 33KV,11KV lines,33/11KV S/S and HT Cable, LT Cable, UG Cable., Erection of 33 KV ,11 KV Line, LT lines,500,315,200,100 KVA DTR'S and 33/11KV Substation.

  • RDSS Project under REC Scheme at Chittor, Andhra PRadesh
  • Client : APSPDCL, Cost : 120 Cr,
  • Project Details :

         Construction Of 33/11 KV Substations, 33 KV Feeders, 11 KV Feeders, 33KV & 11 KV Line augmentation Works, Tirupati, Chittoor, Survey, Construction & Commissioning of 33KV,11KV lines,33/11KV S/S and HT Cable, LT Cable, UG Cable., Erection of 33 KV ,11 KV Line, LT lines .

  • WTP Project's / Lift Irrigation Projects under PHD Dept at Bhubaneswar, Odisha
  • Client : PHD, Cost : 280 Cr,
  • Project Details :

       Construction of Water Treatment Plant (WTP),STP , Lift Irrigation Projects , Bhubaneswar, Odisha, Study Contract Documents and Project Technical specifications to identify complete scope of work., Preparing BOQ's for lines, Pumphouses and Substation works., 

  • RAPDRP Project under REC Scheme at Madurai, Tamil Nadu
  • Client : TNEB, Cost : 220 Cr,
  • Project Details :

        Construction of RADRP Project, Madurai, Tamil Nadu, Survey & Construction & Commissioning of 33KV,22KV,11KV lines,33/11KV S/S and HT Cable, LT Cable, UG Cable., Erection of 33 KV ,22KV,11 KV Line, LT lines and 33/11KV Substation., Cable Laying and Termination (POWER CABLE AND CONTROL CABLE)., 

  • Wind Power Project at Ananthapur , Andhra Pradesh
  • Client : IOCL / NALCO, Cost : 280 Cr,
  • Project Details

       Construction of 250MW Wind Power Project, Anantapur, Andhra Pradesh, Survey & Construction & Commissioning of 220/33KV Substations,33KV DP Yards and 33KV Line., 220/33KV Substation and connected 220KV Double circuit EHV line from Uravakonda to Ramapuram (60KM) constructed in Ananthpur District(A.P) under APTRANSCO., 

  • Maha Infra Plan II Project under REC Scheme at Satara, Maharashtra
  • Client : MSEDCL, Cost : 140 Cr,
  • Project Details :

       Construction of Maha Infra Project, Satara, Maharashtra, Construction of Maha Infra Project, Satara, Maharashtra, 33KV/11 KV Substations ,33 KV Lines, Panel Erections, 33KV,22KV,11KV, LT lines, DTR (315,200,100,63 KVA) and HT Cable, LT Cable, UG Cable Termination works.

  • RGGVY Project under REC Scheme at Mayurbhanj, Odisha
  • Client : MSEDCL, Cost : 140 Cr,
  • Project Details :

       Construction of RGGVY Project and HVDS, Mayurbhanj, Odisha, Construction of RGGVY Project and HVDS, Mayurbhanj, Odisha,33 KV Lines, Panel Erections, 33KV,22KV,11KV, LT lines, DTR (100,63 KVA) works. As per our client Technical Specifications and Quality Procedure.

Languages

English
Proficient
C2
Telugu
Proficient
C2
Hindi
Upper Intermediate
B2
Tamil
Intermediate
B1

Certification

  • [Type] Licence

Interests

  • Reading Books and Playing Cricket

Timeline

Project Manager

NCC LIMITED
12.2024 - Current

Project In charge

SRRM ENERGY
01.2022 - 12.2024

Deputy Manager

MEGHA ENGINEERING & INFRASTRUCTURE LTD
04.2017 - 10.2021

Associate Manager

SMS INFRASTRUCTURE LTD
11.2013 - 03.2017

Sr. Engineer

SUZLON ENERGY LTD
09.2011 - 10.2013

Project Engineer

GTL LTD
03.2010 - 09.2011

Site Engineer

ICOMM TELE LTD
06.2008 - 03.2010

B-Tech - EEE

Sri Vasavi Engineering college
Narasimha Rao UppadaProject Manager