NARENDRA KUMAR SAINI

Manager Electrical Project and Maintenance
Chittorgarh

Summary

Project 1. Accomplished and goal-driven professional with 11+ years of extensive expertise in installation, testing, and commissioning of E & I equipment’s. Adept at overseeing projects from start to finish, including planning, procurement, execution, monitoring, and closeout. Committed to ensuring high-quality work and safety throughout the planning, engineering, and execution phases. Developing project documentation and carrying out audit reconciliations to secure the prompt and cost-efficient completion of projects. Maintenance 2. Highly skilled Electrical Maintenance engineer with 9+ years of experience in the Cement and Power sectors. Proficient in diagnosing and repairing electrical systems, implementing preventive maintenance practices, and enhancing system reliability. Adherence to safety standards. Proven track record of reducing equipment downtime through strategic maintenance and fault detection. Known for strong problem-solving skills, and effective teamwork.

Overview

20
20
years of professional experience
4
4
Certifications
2
2
Languages

Work History

Manager – Electrical Projects and Maintenance

Birla Corporation Limited – Unit Chanderia Cement Works
09.2018 - Current

Prepare plans, specification and Cost estimation for Electrical works for projects.

  • Examining and interpreting E & I drawings, generating BOQs, Specifications, and collaborating with consultants and contractors.
  • Developments of project schedules and manpower requirements.
  • Review and check technical vendor submittals for installation requirements.
  • Direct and coordinate all activities related to purchasing, construction, installation, maintenance, support, documentation, and testing to ensure compliance with relevant specifications, codes, and site requirements.
  • Preparation of Purchase Requisitions through SAP module and the documentation of service bill entries within the SAP system.
  • Achieve successful installation, testing, and commissioning of transformers, HT and LT panels, HT and LT motors, PCC, MCC, and air conditioning systems at the project site.
  • Perform inspections to identify installation and quality-related issues, ensuring that operational and safety standards are met.
  • Conduct PSSR to confirm compliance with safety protocols.
  • Preparing root cause analysis (RCA) investigation, focusing on improving safety and reliability.
  • Maintain day to day record of progress related to work at site and maintain all related documents.
  • Responsible for the planning and adjustment of available resources and manpower, as well as ensuring safe work practices and adherence to the work permit system and material management.
  • Successfully implemented safety measures across all levels of operation in both plant and utility sections.
  • Implementation of preventive, planned, and predictive maintenance strategies to optimize machine availability.
  • Accountable for monitoring the overall operational and maintenance performance of all electrical equipment.

Electrical Engineer-1 (Projects and Maintenance, 3x60 MW Thermal Power Plant)

Jaypee Churk Industrial Complex
01.2013 - 09.2018
  • Company Overview: A Unit of Jaiprakash Associates Ltd
  • Accountable for end-to-end project management & coordination, erection and commissioning of Electrical and Mechanical Systems, including taking corrective measures / steps to rectify the equipment's faults
  • Review and Verify BOM before erection
  • Review of erection GA Schematics, interlocks and Preparation of cable schedule
  • Review of SLD as per specification
  • Erection, Commissioning of 225 TPH grinding unit and 60 MW CPP
  • Erection, Commissioning and Testing of Up to 12.5 MVA Distribution Transformers
  • Installation, Testing and commissioning of HT/LT panels and HT/LT motors.
  • Identify and fix the flashover complications occurring at the ACC MCC to reduce the downtime by 50%.
  • Reduced energy consumption in auxiliary systems by 10% through a focused efficiency improvement project Installation of VF Drives on ACC Fans.
  • Successfully managed the Overhauling of Generator.
  • Proficient in using diagnostic tools like meggers, multimeters, and thermal imaging cameras to assess equipment health.
  • Maintenance & Operation of variety of HT motor and LT motors.
  • Maintenance of MCC, troubleshooting and rectification.
  • Good Knowledge of Control circuits. Modification in control circuit as per requirement.
  • Participated in the design and modification of power distribution systems to enhance plant efficiency and safety.
  • Developed and executed preventative maintenance schedules for all electrical assets, improving equipment reliability and extending their service life.
  • Supervised a team of technicians in the installation, testing, and commissioning of new electrical equipment during plant upgrades and overhauls.
  • Conducted root cause analysis (RCA) for equipment failures, implementing corrective actions that prevented recurrence.

Team Member (Electrical Project)

M/S Saint Gobain Glass India Limited
05.2011 - 12.2012
  • Erection and Commissioning of HT switchboard 6.6 kV, PCC and MCC Panels; reviewed manufacturing drawings before releasing for production, review of B.O.Q, Verification of specifications, SLD, wiring diagrams etc
  • Checked component details & originated purchase requisition; made site visits for refurbishment / expansion or up gradation of existing panels
  • Prepared inspection reports, attended site complaints, co-ordinate all site works
  • Successfully managed installation, testing and commissioning of various equipments under ongoing projects, also, anticipated & resolved problems and managed trouble shooting & repair work

Electrical Engineer (Maintenance)

Birla Cement Works
06.2005 - 05.2011
  • Maintenance & Operation of variety of HT motor and LT motors
  • Operation and maintenance of 132/6.6 KV switchyard
  • Operation and maintenance of Power transformer of 12.5/16.5 MVA and distribution transformer up to 2.5 MVA
  • Maintenance of Wagon Tippler, Coal & Limestone Stackers and Reclaimers
  • Managed Parallel operation of different captive sources and with the grid for optimum utilization of resources
  • Accountable for planning and modification of available resources and manpower and safe work practice and acknowledgement of work permit system & material management
  • Implemented Safety Measurement at all levels of Operation in all Equipments in plant & Utility section
  • Involved in implementation of preventive, planned and predictive maintenance to maximize operational availability of machines
  • Worked on ISO 9001: 2000 and 14001 documentation and was accountable for monitoring the total operational and maintenance aspects of all electrical equipments
  • Managed work allocation for Man Power and carried out coordination of construction, Erection, Commissioning of all type of instrument

Education

Engineering Diploma - Electrical Engineering

Vidhya Bhawan Polytechnic College
Udaipur, Rajasthan, India
01.2004

Skills

  • Electrical project management
  • Team leadership
  • Problem-solving expertise
  • Preparation of supply and service BOQ
  • Stakeholder engagement
  • JSA and HIRA documentation
  • Electrical maintenance expertise
  • Resource coordination
  • Team-based coordination efforts
  • Procurement planning
  • SAP Application Expertise

Certification

Industrial PLC and SCADA Automation

Accomplishments

  • The successful completion of the pyro circuit modification, increasing the capacity from 3600 TPD to 6000 TPD, has been achieved at the NCCW Plant of Birla Cement Works, Chanderia.
  • The AFR Projects (Pre-Processing and Co-Processing) has been successfully completed at Birla Cement Works, Chanderia.
  • The erection, testing, and commissioning of 3x60 MW captive power plants, WTP & Compressor House have been successfully completed at Jaypee Churk Industrial Complex.
  • The cutting line has been successfully erected, commissioned, and tested at Saint Gobain Glass India Ltd.
  • The capacity modification from 2500 TPD to 4000 TPD has been successfully completed at CCW Plant of Birla Cement Works, Chanderia.
  • Identify and fix the flashover complications occurring at the ACC MCC in the Jaypee Churk Industrial Complex.
  • Maintenance & Operation of variety of HT motor and LT motors.
  • Maintenance of MCC, troubleshooting and rectification.
  • Good Knowledge of Control circuits. Modification in control circuit as per requirement.
  • Letter of gratitude for the successful completion of the WHRS project.
  • Achieved 3rd place in the safety paper presentation.
  • Awarded a Certificate for the successful completion of the Pyro project without any Lost Time Injuries.

Additional information - Experience

20+ Years of Experience

Timeline

Manager – Electrical Projects and Maintenance

Birla Corporation Limited – Unit Chanderia Cement Works
09.2018 - Current

Electrical Engineer-1 (Projects and Maintenance, 3x60 MW Thermal Power Plant)

Jaypee Churk Industrial Complex
01.2013 - 09.2018

Team Member (Electrical Project)

M/S Saint Gobain Glass India Limited
05.2011 - 12.2012

Electrical Engineer (Maintenance)

Birla Cement Works
06.2005 - 05.2011

Engineering Diploma - Electrical Engineering

Vidhya Bhawan Polytechnic College