Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic
Bollu Naresh Kumar

Bollu Naresh Kumar

Bhadrachalam, Bhadradri- KothagudemDist

Summary

Profile Summary: Over 05 years 7 Months of experience in Erection engineer / Projects Mechanical. Proven skills in troubleshooting and problem solving. Proficient in developing a framework of quality standards, procedures & systems Had a sound knowledge in problem and defect analysis in production and quality related issues A keen communicator with superiors and subordinates regarding product and process related issues. Excellent team building, listening and communication skills. A good knowledge on Product Development & Testing of defense related products. An effective leader with skills in coordinating with & motivating with teams for successful erection operations and implementing standards for operational excellence. A good knowledge on preparation of erection checklist and method statements for erection. A good knowledge to study and prepare the inspection protocols for rotatory equipment’s, tanks, structure

Overview

6
6
years of professional experience
3
3
Languages

Work History

Senior Structural Engineer

Ven Consulting India Private Limited
Karnataka
07.2023 - Current
  • Verified construction documentation to meet client requirements and vision.
  • Assisted drafters in developing structural design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
  • Completed accurate engineering calculations for weights, loads and other metrics using both manual and digital methods.
  • Administered contracts and managed projects.
  • Wrote project proposal summaries, outlining factors such as cost, timelines, scheduling and required permits.
  • Attended professional training courses to maintain current knowledge and licensure.
  • Performed quality inspections of all plans, documents and calculations as well as in-progress and final bridge construction.

PROJECT ENGINEER

ITC Ltd Paperboards
10.2017 - Current
  • And Specialty Papers Division Bhadrachalam Unit
  • DES, Erection and commissioning
  • Responsibilities, Reviewing erection schedules, engineering specifications, process flow sheets & other information to understand drawings and activities in erection
  • Study of General Arrangement Drawings for new machine installation, Civil, Structural, Pipe Line
  • Drawings for new Paper Machine installations, (C C K) Color coating kitchen, ASH Leaching Plant
  • Soda recovery boiler 45 days shut down, new installation of HPRB High Pressure Recovery Boiler
  • Evaporator and ATFD Agitated Thin Film Dryer
  • Inspection of steam drum
  • Managing various functions such as Argon, Arc welding jobs and cutting works for structural, pipelines
  • Planning manpower & material and implementing preventive & predictive maintenance activities of all equipment & expertise in shutdown and breakdown maintenance
  • Implementing plans & schedules for maintenance operations with focus on optimum utilization of manpower & material.

Education

B.Tech - Mechanical Engineering

Intermediate - undefined

SSC - undefined

Skills

Led the troubleshooting & maintenance ofDisc filters, Pumps, Gearboxes, Agitators, Valves, Dampers, all types of Filters, conveyors (screwBelt, Drag chains, Rotatory Feeders, Crushers, ESP’S, Steam Drum Inspection, Pressure PartsInspection Material Handling )Received many internal appreciations from the top management for executing the projects with inStipulated time and parametersPerformed TPM activities & implemented continuous effortsLed plant maintenance function supporting 24/7 operationsDeveloping strong professional relationships with senior level managers (customer) at key accountsTechnical KnowledgeNDT inspections QCOperating systems windows 10Auto cad 2d nd 3DCatia v5Microsoft officeProjects Handled:-In ITC LTD (High pressure recovery boiler 2700 TDS & 420tph) in India’s first recovery boilerWith high capacity as erection engineer in mechanical deptSuccessfully completed Erection and commissioning High pressure recovery boiler 2700 TDS &420tph) in India’s first recovery boiler with high capacityComplete Erection of pressure parts and its related equipment’sSuccessfully completed Erection and commissioning (EVEPORATOR 390 TPH Capacity) withMultiple effectsSuccessfully completed Erection and commissioning (ALP ASH LEACHING PLANT) SuccessfullyComplete erection and commissioningSuccessfully completed Erection and commissioning of Hall Ventilation, Machine VentilationPaper Ventilation, hood ventilation and coater Ventilation, IR Dryers systems in ITC PSPDBHADRACHALAM, machine (Board machine with capacity 700 tons per day)Successfully completed Erection and commissioning of False Ceiling of Machine floorSuccessfully completed Erection and commissioning of Steam system including steam lines forMachine, Paper and Coater ventilation systems and Dryer steam and Condensate systemSuccessfully completed Erection and commissioning of All OSBL piping including Water, AirPulp and SteamSuccessfully completed Erection and commissioning of Starch piping, Coating pipingSuccessfully completed Erection and commissioning of PIPING for CCK (Color CoatingKitchen)Personal SkillsTraining SkillsInterpersonal SkillsCommunication SkillsResearch SkillsArticulating SkillsAnalytical SkillsAble to help others in a concise way to gain knowledge and skills

Project Management

[Type] engineering background

Inspection proficiency

Structural Design Planning

Proposal writing

Structural Inspection

Computer-Aided Design (CAD)

Safety planning

Schedule maintenance

Adept at computer drawing

Technical Specification Development

Compliance Management

Additional Information

  • Willing to relocate : Yes
  • Installation & commissioning works to ensure timely completion of projects. Erection of rotatory equipment’s, tanks, pumps, Flue gas systems, ducting, and process piping. Erection of pressure parts of the recovery boiler. Administering overhauling work for equipment and conducting modifications, & major repairs to improve equipment efficiency by fault-finding. Controlling labor requirements/manpower planning. Taking stringent quality measures including preparation of necessary documents to ensure compliance with quality standards. Participated in technical and commercial discussions and material procurement. Ensuring Installation completion and inspection of installed components with respect to the check lists as per drawing /standards.

Timeline

Senior Structural Engineer

Ven Consulting India Private Limited
07.2023 - Current

PROJECT ENGINEER

ITC Ltd Paperboards
10.2017 - Current

B.Tech - Mechanical Engineering

Intermediate - undefined

SSC - undefined

Bollu Naresh Kumar