Summary
Overview
Work History
Education
Skills
Personal Information
Training
Personal data processing
Timeline
Generic

Naresh Singh

Ghaziabad

Summary

Seeking challenging assignments in new part development from RFQ to SOP with Capacity planning, Cutting Tools Planning & Finalization, Hyd Fixture Concept decide & DAP with Cutting Tools Layout. APQP, PPAP, Resource/Vendor development

Overview

17
17
years of professional experience
2
2
Languages

Work History

Divisional Manager – Project Engineering

BAJAJ MOTORS Ltd
04.2025 - Current
  • Responsible for the NPD at Fork Con Road two-wheeler, 4-Wheeler.
  • New RFQ Received from marketing department & check feasibility.
  • As per the 3D Model providing technical & Capex sheet to marketing.
  • Coordinate with design department for new product process feasibility with existing machines.
  • Die Tonnage define as per the 3d model help with design department.
  • CSR feasibility discussed with customer & Providing CSR Open point closer with action.
  • RTS Conduct with customer discussion for technical.
  • After LOI is received from customer we will work start APQP.
  • Finalize the child parts vendor & developed as per the customer requirement to assembly parts.
  • Technical DAP discussed with machine, Tool & fixture supplier as per the product requirement.
  • Tooling & fixture technical discussion with tooling supplier finalize get quotation.
  • New Machine installation and commissioning.
  • Visiting the supplier for machine tool trial.
  • As per the customer milestone plan provide parts & required document.
  • Trial conduct online ITO, TTO, HVPT & PPAP Lot submission to customer as per milestone plan.
  • As per the timeline, send FOT lot to customer.
  • PSW Sing with customer & handover line to production.
  • Monitoring & implementing ECN in development stage.
  • Responsible For implementing (Past trouble history) in new projects.
  • Management of end of production and start of production.
  • Budgeting for procuring new product.
  • Coordinate with Production Department to stabilize the process.
  • Implementation of POKA-YOKE at different Stages.
  • Eliminating unnecessary Muda activities is taking place in process.
  • FMEA, Operation control Standard and Control Plan Documentation.
  • Analysis of existing process & identifying area of improvement by time & motion study.
  • Improvement in layout to avoid unwanted movement.
  • Productivity Improvements through Cycle Time reductions and Automation.
  • Develop tooling and manufacturing processes for new products.
  • To develop jig and fixture with in house and outside support.
  • Bajaj Motors in September 1986 initially started as a machining unit with backward integration of forging and casting for Auto Components and started its commercial production in 1989 and ever since then Bajaj Motors Limited has taken precision forging to another level with its excellence in commitment and unbeatable quality. Since then Company has delighted customers who have made it earned continuous Growth year after year. During the span of 30 years Bajaj Motors has achieved many milestones which includes possession of fully modern and well equipped state of the art manufacturing units across North India for undertaking machining, forging and ferrous casting processes.

Divisional Manager – Project Engineering

BAJAJ MOTORS Ltd
04.2025 - Current
  • Responsible for the NPD at Fork Con Road two-wheeler, 4-Wheeler.
  • New RFQ Received from marketing department & check feasibility.
  • As per the 3D Model providing technical & Capex sheet to marketing.
  • Coordinate with design department for new product process feasibility with existing machines.
  • Die Tonnage define as per the 3d model help with design department.
  • CSR feasibility discussed with customer & Providing CSR Open point closer with action.
  • RTS Conduct with customer discussion for technical.
  • After LOI is received from customer we will work start APQP.
  • Finalize the child parts vendor & developed as per the customer requirement to assembly parts.
  • Technical DAP discussed with machine, Tool & fixture supplier as per the product requirement.
  • Tooling & fixture technical discussion with tooling supplier finalize get quotation.
  • New Machine installation and commissioning.
  • Visiting the supplier for machine tool trial.
  • As per the customer milestone plan provide parts & required document.
  • Trial conduct online ITO, TTO, HVPT & PPAP Lot submission to customer as per milestone plan.
  • As per the timeline, send FOT lot to customer.
  • PSW Sing with customer & handover line to production.
  • Monitoring & implementing ECN in development stage.
  • Responsible For implementing (Past trouble history) in new projects.
  • Management of end of production and start of production.
  • Budgeting for procuring new product.
  • Coordinate with Production Department to stabilize the process.
  • Implementation of POKA-YOKE at different Stages.
  • Eliminating unnecessary Muda activities is taking place in process.
  • FMEA, Operation control Standard and Control Plan Documentation.
  • Analysis of existing process & identifying area of improvement by time & motion study.
  • Improvement in layout to avoid unwanted movement.
  • Productivity Improvements through Cycle Time reductions and Automation.
  • Develop tooling and manufacturing processes for new products.
  • To develop jig and fixture with in house and outside support.
  • Bajaj Motors in September 1986 initially started as a machining unit with backward integration of forging and casting for Auto Components and started its commercial production in 1989 and ever since then Bajaj Motors Limited has taken precision forging to another level with its excellence in commitment and unbeatable quality. Since then Company has delighted customers who have made it earned continuous Growth year after year. During the span of 30 years Bajaj Motors has achieved many milestones which includes possession of fully modern and well equipped state of the art manufacturing units across North India for undertaking machining, forging and ferrous casting processes.

Deputy Manager

BAXY AUTO LIMITED (Continental Engines)
10.2023 - 04.2025
  • Complete Project in BAXY: - Dana Front housing basely this part is EV H-Voltage Which is end customer is TATA Motors.
  • Kawasaki cylinder head which is a two-wheeler engine part. The end customer is Kawasaki.
  • Cover thermostat front housing for Volvo truck customers.
  • Multi cylinder head project complete for VECV.
  • Transmission housing (Customer is Volvo).
  • Front housing (Customer is Volvo).
  • Cylinder head (Customer is Iveco).
  • BAXY Limited is a leading name in the field of intricate Aluminum Cast Components for Automotive Applications. The company has three state-of-the-art manufacturing units located in Bhiwadi. TS 16949, ISO 14001 & OHSAS 18001 accredited organization, CEL is a global leader in Aluminum cast components offering products like Single Cylinder Heads, Multi-cylinder Heads, Inlet Manifolds, EGR Housings and Coolers, Transmission Housings, Flywheels, Tubes and Brackets among others.

Deputy Manager

BAXY AUTO LIMITED (Continental Engines)
10.2023 - 04.2025
  • Complete Project in BAXY: - Dana Front housing basely this part is EV H-Voltage Which is end customer is TATA Motors.
  • Kawasaki cylinder head which is a two-wheeler engine part. The end customer is Kawasaki.
  • Cover thermostat front housing for Volvo truck customers.
  • Multi cylinder head project complete for VECV.
  • Transmission housing (Customer is Volvo).
  • Front housing (Customer is Volvo).
  • Cylinder head (Customer is Iveco).
  • BAXY Limited is a leading name in the field of intricate Aluminum Cast Components for Automotive Applications. The company has three state-of-the-art manufacturing units located in Bhiwadi. TS 16949, ISO 14001 & OHSAS 18001 accredited organization, CEL is a global leader in Aluminum cast components offering products like Single Cylinder Heads, Multi-cylinder Heads, Inlet Manifolds, EGR Housings and Coolers, Transmission Housings, Flywheels, Tubes and Brackets among others.

Deputy Manager – Project NPD

Sunbeam Auto Pvt. Ltd
09.2018 - 10.2023
  • Complete project in sunbeam.
  • TBA Dia-22 Machining & Assembly project Customer-Vitesco.
  • TBA Dia-26& Dia-34 Customer-Vitesco.
  • Nox base plate 2V customer- Vitesco.
  • Dia-44 Throttle body machining customer- Bosch.
  • Bottom & ECU Cover customer- Bosch.
  • Dia-64 throttles body machining customer-Bosch.

Deputy Manager – Project NPD

Sunbeam Auto Pvt. Ltd
09.2018 - 10.2023
  • Complete project in sunbeam.
  • TBA Dia-22 Machining & Assembly project Customer-Vitesco.
  • TBA Dia-26& Dia-34 Customer-Vitesco.
  • Nox base plate 2V customer- Vitesco.
  • Dia-44 Throttle body machining customer- Bosch.
  • Bottom & ECU Cover customer- Bosch.
  • Dia-64 throttles body machining customer-Bosch.

Production/ Engineering Senior Engineer

Sona Koyo Steering Systems Ltd.
06.2012 - 09.2018
  • Managing Daily production activities like Manpower Handling, Production plan executing on 14 lines, Bekido & Chokko monitoring, Downtime Monitoring, Rejection Analysis, etc.
  • Meeting & follow up of Management for Objectives.
  • Introducing Poka-Yoke online.
  • Conduct HVPT for SOP for New Lines and involved in core team for ITO & TTO.
  • Responsible for New manpower training (Product knowledge, Process knowledge, Daily Work Management, safety knowledge, TPM, 5S, Kaizen’s & other systems used on shop floor), existing manpower multiskilling & job rotation.
  • Motivating operators for Teamwork to get maximum Kaizens and form QC Teams.
  • Preparing Poke Yoke check sheets, JH check sheets, Process check sheets, Process sheets & responsible for their implementations & follow up by operators & shift engineers.
  • Improvement through V-Map tool implementation.
  • Productivity improvement through simplifying the manual processes & cycle time reduction of overall processes.
  • Sona Koyo Steering Systems Ltd. with a turnover of 1300 crores & a Demming Application Prize winner company is largest manufacturer of manual & power steering systems to major O.E.M’s (Maruti, Mahindra & Mahindra, Tata, General Motors, Toyota, Suzuki Powertrain, Fuzi Autotech France etc.). The company is ISO9001:2000, TS16949 certified.
  • Project Complete in Sona koyo steering: Pinion Housing for steering-Customer is Maruti.
  • Pinion housing W105 for Scorpio- Customer is M&M.
  • Steering housing for bolero- Customer M&M.
  • Power steering rack bar for bolero, W105 Scorpio.
  • Valve housing.

Production/ Engineering Senior Engineer

Sona Koyo Steering Systems Ltd.
06.2012 - 09.2018
  • Managing Daily production activities like Manpower Handling, Production plan executing on 14 lines, Bekido & Chokko monitoring, Downtime Monitoring, Rejection Analysis, etc.
  • Meeting & follow up of Management for Objectives.
  • Introducing Poka-Yoke online.
  • Conduct HVPT for SOP for New Lines and involved in core team for ITO & TTO.
  • Responsible for New manpower training (Product knowledge, Process knowledge, Daily Work Management, safety knowledge, TPM, 5S, Kaizen’s & other systems used on shop floor), existing manpower multiskilling & job rotation.
  • Motivating operators for Teamwork to get maximum Kaizens and form QC Teams.
  • Preparing Poke Yoke check sheets, JH check sheets, Process check sheets, Process sheets & responsible for their implementations & follow up by operators & shift engineers.
  • Improvement through V-Map tool implementation.
  • Productivity improvement through simplifying the manual processes & cycle time reduction of overall processes.
  • Sona Koyo Steering Systems Ltd. with a turnover of 1300 crores & a Demming Application Prize winner company is largest manufacturer of manual & power steering systems to major O.E.M’s (Maruti, Mahindra & Mahindra, Tata, General Motors, Toyota, Suzuki Powertrain, Fuzi Autotech France etc.). The company is ISO9001:2000, TS16949 certified.
  • Project Complete in Sona koyo steering: Pinion Housing for steering-Customer is Maruti.
  • Pinion housing W105 for Scorpio- Customer is M&M.
  • Steering housing for bolero- Customer M&M.
  • Power steering rack bar for bolero, W105 Scorpio.
  • Valve housing.

Engineer (Production Assembly and Planning)

ARB Bearings Ltd.
06.2010 - 05.2012
  • I am working in the Production department as an Engineer.
  • An ISO/TS16949: 9000: certified Company which is Bearing manufacturing.

Engineer (Production Assembly and Planning)

ARB Bearings Ltd.
06.2010 - 05.2012
  • I am working in the Production department as an Engineer.
  • An ISO/TS16949: 9000: certified Company which is Bearing manufacturing.

Assistant Engineer

TATA MOTORS LTD.
05.2009 - 06.2010

Assistant Engineer

TATA MOTORS LTD.
05.2009 - 06.2010

Education

B-Tech - Mechanical Engineering

NIMRT
Delhi
01.2012

Diploma - Mechanical Production Engineering

S.G.S.J. Polytechnic
Khurja, Bulandshar
01.2009

Skills

MS-Excel

MS-Word

MS-Power Point

Auto-cad 2006

Ms project

Personal Information

  • Father's Name: Shri Jogendra Singh
  • Date of Birth: 02th Jul 1988
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Training

  • SPC Tools
  • PFMEA
  • Problem Solving Tools
  • Hypothesis testing
  • MSA
  • Internal CNC Training Conducted by Ace micrometric
  • Attending Team Leader program By Sona skill development center
  • 5’s
  • Kaizen
  • TPM
  • TQM
  • Four days special Training about FIRST AID
  • Soft skill Training at Dehradun in Advanced Training Institute for electronics & process instrumentation
  • Special Training in Fire & Safety

Personal data processing

I hereby declare that all the information furnished above is true and correct to the best of my knowledge and belief.

Timeline

Divisional Manager – Project Engineering

BAJAJ MOTORS Ltd
04.2025 - Current

Divisional Manager – Project Engineering

BAJAJ MOTORS Ltd
04.2025 - Current

Deputy Manager

BAXY AUTO LIMITED (Continental Engines)
10.2023 - 04.2025

Deputy Manager

BAXY AUTO LIMITED (Continental Engines)
10.2023 - 04.2025

Deputy Manager – Project NPD

Sunbeam Auto Pvt. Ltd
09.2018 - 10.2023

Deputy Manager – Project NPD

Sunbeam Auto Pvt. Ltd
09.2018 - 10.2023

Production/ Engineering Senior Engineer

Sona Koyo Steering Systems Ltd.
06.2012 - 09.2018

Production/ Engineering Senior Engineer

Sona Koyo Steering Systems Ltd.
06.2012 - 09.2018

Engineer (Production Assembly and Planning)

ARB Bearings Ltd.
06.2010 - 05.2012

Engineer (Production Assembly and Planning)

ARB Bearings Ltd.
06.2010 - 05.2012

Assistant Engineer

TATA MOTORS LTD.
05.2009 - 06.2010

Assistant Engineer

TATA MOTORS LTD.
05.2009 - 06.2010

B-Tech - Mechanical Engineering

NIMRT

Diploma - Mechanical Production Engineering

S.G.S.J. Polytechnic
Naresh Singh