Professional with a proven track record in leadership roles, demonstrating adaptability to dynamic environments. Detail-oriented Assistant Manager skilled in establishing clear guidelines and enforcing policies to enhance staff satisfaction and achieve key objectives. Strong relationship-building, multitasking, and decision-making abilities contribute to team success.
Manpower Reduction in Stamping and Pressing Division, Project continues on reduction of manpower in current organization. 12% Manpower reduced with doing low Cost automation projects. Heavy reduction in tool setting time (SMED), Project done on setting time which was average 12 min per tool. Average settings in a day were 13 min. Now average setting time per tool is reduced drastically from 6 to 8 min. Cost reduction, Through raw material size optimization, by producing some child parts from scrap. Through tryout of all in-house blank dies to reduce the Strip size that saves the material.
I hereby declare that all statements furnished above are true & to the best of my knowledge.