  • As an Deputy Manager at AMNS India Limited ( Previously Essar ) with 17 years of experience, I have made significant contributions to various projects, including - KELK SYSTEM = Kelk system is used in CB for crop cut optimization. By installing this system crop loss system , we have achieved lowest ever crop loss after onwards - PARSYTEC SYSTEM = Earlier we are used to inspect coil offline at regular interval for any defect. Online strip inspection possible after installing of parsytec system - ROLL BITE LUBRICATION = By applyingthis feature we have increase roll life as well as strip quality also gets improve. Achievements & Major Projects:
  • Project on "To increase the reliability of coiling temperature control in tail ends in thinner sections."
  • Project on "To Eliminate the Breakage of outer wraps of High Carbon Grades Coils"
  • Project on "To Eliminate the shade marks in CREN6 coils"
  • Project on "To improve coil shapes in thinner section rolling"
  • Project on "To Eliminate the tail Chewed up in Thinner section rolling"
  • Project on "Prevention of Sagging of Si added steel Grade slabs inside furnace during downtime"
  • Recipient of Positive Action Award for Correcting Gap Set Up manually to reduce Salvages due to Thickness deviation during X-Ray Gauge feedback problem. Familiar and knowledge of different defects of Hot rolled Steel strip like Heat Pattern Scale, Tiger Pattern Scale, Fire Crack, Roll Mark, Black Pits, Transverse Crack etc, I was also recognized for winning the 1st prize in the Productivity Contest. With strong leadership and project management skills, I am equipped to take on the role of a Deputy Manager. I am a hardworking individual who thrives on challenges and enjoys working collaboratively with a team. My future goals include achieving specified targets and goals, driving productivity, ensuring top-notch quality, and prioritizing safety within our operations.

Overview

19
years of professional experience
3
Languages

Work History

ARCELOR MITTAL NIPPON STEEL INDIA LIMITED

OPERATION SHIFT INCHARGE
12.2020 - Current

Job overview

  • Directed and supervised production processes in the role of Operation Shift Incharge at Arcelor Mittal Nippon Steel India Limited.
  • Consistently delivered outstanding results, enhancing company success.
  • Nurturing the junior for smooth process to achieve desired production goals.
  • Continues be in touch with R&D and TQG groups for increasing target FDT in some of general grades to achieve higher production.
  • Integral part of HSM1 upgradation with team SMS.
  • Providing support and guidance to colleagues of ROUGHING MILL, COILBOX, FINISHING MILL for smooth resumption of rolling post HSM1 enhancement.
  • Oversaw some of big upgration project with team project in HSM1.

ROLES AND RESPONSIBILITIES DURING UPGRATION :

- RM approach table #3 (6 rolls) & 4 (6 rolls) are having group driven drives. Any problem in shaft or in single roll jamming resulting whole table out of work. These both tables converted in individual driven motors rolls and saved major delay and production lost.

- Laminar cooling is essential to ensure mechanical and metallurgical properties of strip upto mark. Responsible for changing and smooth functioning of main headers (1 to19) post upgradation within time limit.


LOGIC MODIFICATION INITIATED AFTER UPGRADATION :

- Restrict Finishing mill stand screw operation to reduce FM roll change time.

- FM side guide closing logic.

- FM Interstand ON time to reduce FM rolling time.

- Define different laminar cooling strategies to achieve target CT wrt different grades and sections.

ESSAR STEEL INDIA LIMITED

OPERATION SHIFT INCHARGE
05.2007 - 12.2020

Job overview

  • Worked as an Operation Shift Incharge at Essar Steel India Limited, where I was responsible for overseeing and managing the production operations.
  • My accomplishments in this role include:
  • Achieving highest production in one shift, with a record of 4957 tons
  • Achieving highest hourly production of 817 tons
  • Achieving highest daily production of 13,712 tons
  • Achieving highest ever monthly production of 3,36,417 tons
  • Achieving lowest crop loss after implementing the Kelk system for crop cut optimization
  • Implementing the Parsytec system for online strip inspection
  • Improving roll life and strip quality through the use of roll bite lubrication
  • Introducing a cross flush header at the F#6 exit top to prevent upward folding of thinner gauge strips
  • Improving roll life by implementing roll neck lubrication via stedial lubrication system for roll grinding

LARSON & TOUBRO LIMITED

WELDING ENGINEER
04.2006 - 05.2007

Job overview

  • Worked as a Welding Engineer at Larson & Toubro Limited, where I was responsible for performing welding operations and ensuring quality standards.
  • My role included:
  • Performing welding operations according to specifications and standards
  • Ensuring quality control and adherence to welding procedures
  • Collaborating with cross-functional teams to resolve welding-related issues

Education

DR S & SS GANDHI ENGINEERING COLLAGE
Surat

DIPLOMA MECHANICAL ENGINEERING

GUJARAT SECONDARY AND HIGHER SECONDARY BOARD
Surat

H.S.C from SCIENCE

Interests

Cricket
Listen Music
Travelling

Personal Information

  • Date of Birth: 04/11/86
  • Nationality: Indian

Timeline

OPERATION SHIFT INCHARGE

ARCELOR MITTAL NIPPON STEEL INDIA LIMITED
12.2020 - Current

OPERATION SHIFT INCHARGE

ESSAR STEEL INDIA LIMITED
05.2007 - 12.2020

WELDING ENGINEER

LARSON & TOUBRO LIMITED
04.2006 - 05.2007

DR S & SS GANDHI ENGINEERING COLLAGE

DIPLOMA MECHANICAL ENGINEERING

GUJARAT SECONDARY AND HIGHER SECONDARY BOARD

H.S.C from SCIENCE
NAYANKUMAR PATELRolling Mill Operation Manager/Incharge