Summary
Overview
Work History
Education
Currentskills
References
Currentlicenses
Timeline
Generic

Neill Tucker

Westminster

Summary

I am a hardworking and innovative professional who is looking for a new employment opportunity to utilise current skills already gained and to also enhance further into new skill sets. I have been working for over 20 years in the role of an Electrician, working on various different work sites with a variety of different equipment and components. I have extensive trade skills including the testing, installation, fault finding, repairing, and inspecting of monitoring devices. Performing general maintenance on the equipment, whilst vigorously promoting safe systems and practices as an integrated management approach to business. I proudly possess a strong technical aptitude, highly developed mechanical and problem-solving skills with the ability to work in challenging conditions. I strive to be the best at what I do and apply myself to any situation or position that I am given. I interact with the greatest degree of professionalism and personal integrity on a daily basis.

Overview

14
14
years of professional experience

Work History

Electrician (FIFO)

Civmec
Perth
08.2020 - 03.2024

QA/QC Leading Hand
FMG IRON-BRIDGE Jan 2022- Mar 2024

  • Test & checks of various cable installation works across site
  • Testing of various size Transformers, Motors, various instruments and devices, lighting and small power.
  • Testing/ commissioning of switch-rooms and temporary power installations.
  • Read, interpret and understand detailed electrical schematics, plans, drawings and diagrams
  • Completion of ITRs using FMG Pims system/ CCMS system
  • Assisting and leading the work team with any queries, materials or test instruments to ensure continual productivity and completion of work areas to be handed over to the client on time.
  • Assisting supervisor to relay work loads, job requirements or any issues out in the field
  • Carrying out wiring modifications on MCC'S, marshalling panels and vendor's equipment to match up with the client’s design.
  • Identifying issues through testing and inspection then rectifying works to the client's specifications.

QA/QC Electrician

RIO-TINTO MESA A Jan 2021-Dec 2021

  • Test & checks of various cable installation works across site
  • Testing of various size Transformers, Motors, various instruments and devices, lighting and small power.
  • Testing/ commissioning of switch-rooms and temporary power installations.
  • Read, interpret and understand detailed electrical schematics, plans, drawings and diagrams
  • Completion of ITRs using Rio Tinto Pims system/ CCMS system
  • Carrying out wiring modifications on MCC'S, marshalling panels and vendor's equipment to match up with the client’s design.
  • Identifying issues through testing and inspection then rectifying works to the client's specifications.
  • Correct use of PPE, safe working procedures and completing tasks as requested
  • Completion of JHAs, Carry out site electrical isolations with use of LOTO procedures and relevant permits, take 5’s, test and tag of portable equipment

Construction Electrician

FMG- ELIWANA Aug 2020-Dec 2020

  • Construction works; Iron ore crusher project at FMG Eliwana mining processing plant
  • Cable installations for the supply, control and instrumentation equipment
  • Cable terminations (Up to 240mm), glanding & terminations of distribution boards, MCCs, control panels, instrument devices, small and large motors ,lighting & small power
  • Installation of conduit, ladder & tray systems
  • Use of grinders, band saw, magnetic drills and battery crimpers
  • Read, interpret and understand detailed electrical schematics, plans, drawings and diagrams

Electrician

TES Electrical
Perth
08.2015 - 08.2020

Forestfield Train Station

  • Member of Cable-Pulling Team, ranging from 50mm 4 Core and Earth Up to 400mm Single, Above and Below Ground Using Winches and Rollers, Installing All Cable Basket on Concourse and Platform Area

Prime House Joondalup

  • Install and Fit-Off of All Main Switchboards and Sub boards Including Cbus Lighting and Control Installing and Fit-Off of All Mains Cables Up to and Including 630mm XLPE
  • Installing All Ladder Rack
  • All Mains and Control Cabling for Two 1100 KVA Generators
  • Test and Inspect All Cabling Associated with the Install Including Setting Up a Load Bank to Simulate Full Operation of the System
  • Install and Fit-Off of All Backbone Cabling for C-bus, Load Shedding and Remote Electric, Gas and Water Metering

Yagan Square lighting tower and canopy lighting

  • Wiring and Fit-Off of Lighting System Including Drivers, Ethernet Switches, Cat6 Cables and Power Supplies.
  • Fault-Finding and Problem Solving Using Innovative Techniques | Lighting Tower.

Electrician

Schindler Lifts
Perth
11.2013 - 08.2015
  • Set Out Shaft Installing MRL Elevators
  • Install and Connect All Cabling for Shaft, Car and Pit
  • Install Tray, Trunking and Conduit
  • Install Guide Rails, Motors and Building Cars to Millimetre Tolerance
  • Electrical Testing of All Circuits
  • Fault-Finding
  • Maintain the Builders Lift on Site

Electrician

CPS National
Perth
07.2013 - 11.2013
  • Install New Power System in Telstra Exchange, Girrawheen WA
  • Install Battery Racks and Batteries, DC Cables and Cable Tray
  • Install and Fit-Off of AC Distribution Boards and AC Cabling
  • Install and Fit-Off of New Power Racks
  • Cut-Over New System onto Existing Equipment

Electrician

Claremont Electrical
Queens Riverside Apartments
02.2012 - 06.2013
  • Install All Electrical Requirements in the New 24-Storey Apartment Block
  • Install Busbar Trunking
  • Install and Fit Off of All Sub-Distribution Boards
  • Wiring of All Power and C-bus Lighting in Hallways and Communal Areas
  • Install All Containment Tray and Ladder Rack
  • Install HV and Sub Mains Cables
  • Interpret Construction Drawing, Line-Drawings and Problem-Solving Related Issues
  • Install All Conduit in Slabs before Concrete Pour Including Planning and Scheduling
  • Maintain All Temporary Power to Hoists, Cranes and Temporary Distribution Boards on Site

Electrician

Silcar Energy Solutions
Perth
11.2010 - 02.2012

RPG5 Rail project BHP

  • Work on Repeater Sites for Radio Communications Signals Between Newman and Port Hedland
  • Upgrade Existing Solar Arrays to Ensure Compatibility with New Equipment
  • Install and Fit-Off of Regulator Panels
  • Install All AC and DC Cabling | 12v, 24v and 48v
  • Assist with Commissioning of New Systems Including Cutting Over Equipment and Building Alarms
  • Dismantled Old Battery Sheds and Removed Remaining Debris and Old Batteries, Disposing of them Under Compliance with Correct Regulations
  • Complete Punch-Lists for All Sites Including Tasks from Installation of Ladder Rack to Wiring Generators for Remote Start

Power upgrades on remote Telstra exchanges and repeater sites across WA

  • Install New Solar and AC Power Systems
  • Upgrade and Install New Batteries and Battery Racks
  • Upgrade and Install New Solar Array Frames and Solar Panels
  • Install and Connect All AC and DC Cables
  • Install and Connect Cable for All Building and Equipment Alarms Including Generators, Low Fuel and Anti-Theft Alarms
  • Testing of All Alarms
  • Commissioning All Upgraded Power Systems to a Telstra Standard
  • Install Temporary Generators Including AC Cables and Alarm Cables for Remotes Start to Back-Up Sites
  • Perform Dogman Duties on Site for Loading and Unloading Materials and Landing Solar Array Frames
  • Perform Repairs on Generators

Electrician

Cockburn Electrical
Perth
10.2009 - 11.2010

Gorgan Project Nomads Modular Buildings for Barrow Island

  • Wiring and Fit-Off of Power and Lighting in Administration Block, Gym, Locker store and Workshop
  • Install and Fit-Off of Junction Boxes and Distribution Boards of Above Areas
  • Mechanical Wiring and Fit-Off for Air-Conditioning in Administration Block
  • Wiring and Fit-Off for the Kitchen Block

Pearce Airbase Hanger 95

  • Full Refurbishment of Existing Hangar
  • Wiring and Fit-Off of Power and Lighting
  • Install and Fit-Off of Mains Distribution Boards and Sub-Distribution Boards
  • Installation of All Containment
  • Inspect and Test of All Completed Work
  • Wiring Up AC/DC Converters for DC Plugs to Power the Planes when Starting

Education

Western Australia Registered Electrician -

01.2008

City and Guilds – Level 3 Certificate - Knowledge of Electrical Installation Engineering

01.2004

NVQ Level 3 - Installing and Commissioning Electrical Systems

Newry and Kilkeel Institute of Further and Higher Education
01.2003

Currentskills

  • Extensive Experience with Conduit, Cable Laying and Fibre Optic
  • Able to Read and Interpret Electrical Schematic Drawings and Diagrams
  • Testing Commissioning Diagnostics and Fault Finding
  • High Level Technical Skills with Experience Conducting Preventive and Routine Maintenance
  • Efficient Procurement and Project Coordination | Including Design, Testing and Regulatory Compliance
  • Complete Projects on Time | Within Budget and According to Company/Legislative Requirements
  • Quality Assurance | Strong Focus on Quality Workmanship and Industry Best Practices
  • Excellent Problem Solving, Decision-Making Skills and Troubleshooting Skills
  • Excellent Interpersonal Skills | Able to Liaise and Negotiate at all Levels
  • High Work Ethics and Professional Approach to all Obligations and Commitments
  • Ability to Work in a Demanding and Stressful Situation
  • Excellent Work Habits with the Ability to Set Objectives, Timetables and Priorities
  • Ability to Lead by Example, Support and Motivate Co-Workers
  • Strong Experience Working with Tagging/Checks, JHA’s, 5x5, Pre-Start’s and MSDS’s
  • Strong Awareness and Commitment to Occupational Health Safety and Environment in Challenging Areas
  • Extensive Risk and Hazard Control Experience with Assessing Risks, Hazards and Implementing Solutions to Prevent Personal Injuries and Damage | Fatigue Management
  • Physically Fit with the Ability to Work in Remote Locations, Flexible in Working Hours and Shifts Undertaken

References

Micheal Nettle

Civmec Electrical QA/QC Supervisor

0478217554

Trevor Jeakes

Civmec Electrical Superintendent

0400086329

Currentlicenses

  • WA Driver’s License ‘C’ Class
  • Electrical License ‘A’ Grade
  • CPR and Low Voltage Rescue Training
  • High Risk Work License – RB | Basic Rigging, DG | Dogging, WP | Elevated Work Platform – Scissor Lift and Boom Lift
  • Construction White Card
  • Working Safely at Heights
  • Work and Enter into Confined Spaces
  • ACA Fibre Optic License
  • Telecommunications Cabling Open License
  • Demonstrate First Attack Firefighting Equipment

Timeline

Electrician (FIFO)

Civmec
08.2020 - 03.2024

Electrician

TES Electrical
08.2015 - 08.2020

Electrician

Schindler Lifts
11.2013 - 08.2015

Electrician

CPS National
07.2013 - 11.2013

Electrician

Claremont Electrical
02.2012 - 06.2013

Electrician

Silcar Energy Solutions
11.2010 - 02.2012

Electrician

Cockburn Electrical
10.2009 - 11.2010

Western Australia Registered Electrician -

City and Guilds – Level 3 Certificate - Knowledge of Electrical Installation Engineering

NVQ Level 3 - Installing and Commissioning Electrical Systems

Newry and Kilkeel Institute of Further and Higher Education
Neill Tucker