Over 43+ years of experience in the field of Project Engineering Management Rotating Equipment Engineering; pumps, compressors, steam turbines and gas turbines. Over twenty-seven years of experience in Engineering, Procurement and Construction projects, out of which: More than seven years in Innovative Environmental Technologies Pvt. Ltd. based in Pune, India Over sixteen years in Oil & Gas projects through Petrofac, a well-known service provider, based in UAE, for Oil & Gas fields. Around nine years in Petrochemical, Chemical, and Fertilizer projects through Toyo Engineering India Ltd based in Mumbai, India. Over seven years of experience in Engineering of a manufacturing unit through Bharat Heavy Engineering Ltd based in Hyderabad, India. Possess technical knowledge in Proposal Engineering and Detail Engineering of rotating equipment for Engineering, Procurement, Construction, and Commissioning projects. Confident in guiding young engineers on rotating equipment engineering in EPC environment.
Project Handled:-
Novatera Energy-Tabayyah Syeria- Engineering, Procurement Services, Early Production Facility-75 MMSCFD with well heads (5 Nos)
Concept development for 75 MMSCFD Early Production Facility, FEED, Review of Equipment & Pipe Sizing , Compressor and gas engine driver selection stratigy, Review of Process Philosphies, Description, PBD, PFD, P&ID, Equipment List, Module identification and list, Data Sheet. Compressor Technical Bid & Vendor Evaluation Risk Analysis & Mitigation, Value Engineering.
Acero Engineering:
Conceptual Design & Preparartion of RFP of 2 X 200 MMSCFD Gas Processing Trains including LPG Recovery for MIDAD Energy - Southeast Illizi field in Algeria. Prepared philosophies, Basis of Designs, Specification, Architecture diagrams, ICSS, Telecom & Security system, Process & HSE deliverables, EPC list of deliverables, Responsibility Matrix, Risk analysis & mitigation.
Lamar Holdings - Independent Water Transmission Pipeline Project -Basic Engineering & Project Management Consultancy (PMC) services.
Basic Design and Engineering for prebid engineering of 890 MLD Capacity & 855 KM of Water Pipeline upto 96" and two Pumping Stations, HV Switchgear, ICSS.
HYSIS Simulation, Hydraulics, Pipeline Sizing & Route analysis, Process Description, PBD, PFD, Equipment List, Layout Drawings, Instrumentation, Control System Architecture, Pipeline Schedule, RFQ (Pump & Pipeline), Telecom System Architecture, ICSS, Electrical SLD, Substation. Technical Bid Evaluation (TBE) of EPC Bidders bid documents, EPC Cost Estimate, Risk Analysis & Mitigation, Value Engineering, PMC for Co-ordination with EPC bidders.
Petrofac International Ltd – Waha Oil & Gas
Pre-Bid Engineering, FEED verification, Simulation (HYSYS & Flarenet) & Performance Guarantees, BOQ, MTO, EPC cost estimate for Waha North Gialo (6J) field containing 61 producer wells (17 existing wells + 23 new for First Oil & 21 future well with 100,000 BOPD & 200 mmSCFD gas processing and injection.
HYSIS Simulation, FEED Endorsement, PBD, PFD, P&ID, Equipment List, BOQ , MTO, RFQ, ICSS, Electrical SLD, Substation. Technical Bid Evaluation (TBE), EPC Cost Estimate, Risk Analysis & Mitigation, Value Engineering
Captive power plant of 100 MW (GTG)
Compressors – 13 Nos
MIDC - FCI Chakan, Maharashtra
NON-HAZARDOUS SLOID WASTE COLLECTION, TREATEMENT & BIOCNG GENERATION
Technology, Engineering, Procurement, Construction, Commissioning & Operations Services for Waste to Energy Plant.
Waste Handling, processing, Biogas generation, cleaning, compression and filling in cascades with Digester, coloum, tanks, pumps , blowers, Compressors, Flare, Control systems, PMCC, Transformers etc.
SUEZ Ltd - 564 MLD WWTP at Okhla, Delhi Gas Cleaning
H2S Scrubber Package
Technology, Engineering & Procurement Services for Biogas cleaning package with coloum, tanks, pumps , blowers, Control systems etc.
Petrofac International Ltd - Turkmengaz Ltd - Study and Recommendations for Modification Activities for Throughput Improvement in CPF-1 & CPF-1A of Galkynysh Gas Field
Study & Debottlenecking of existing gas processing facility at CPF-1 ( 2 X 500 MMSCFD ) & CPF-1A ( 2 X 500 MMSCFD) to establish Root Cause Analysis for Gas Throughput & Quality deterioration with specific focus on performance improvement of Filter Coalescer, Plate Heat Exchangers & turbo expander operation to comply with export gas composition.
Petrofac International Ltd - FEED for HSE & Technical, National Training Centres in Dakar, Senegal.
FEED Engineering services for Wellhead & Manifold, Oil Separation Plant, Gas Dehydration Unit, Utility System Pilot Plant, Containerised Substation and Control room, ETP for a training institute in INPG Senegal, Africa
VA Tech Wabag Ltd – STP for KMDA & BUIDCO
Technology, Engineering & Procurement Services for Biogas cleaning package with coloum, tanks, pumps , blowers, Control systems etc
for five plants.
IOTDC – PMC for Nano Dispersion Pilot Plant, Utilities & Pipeline Test Loops at IOCL R&D Facility 2, Faridabad
Project Management Consultant for the Nano Dispersion Pilot Plant, Utilities & Pipeline Test Loops.
HPCL – L&THE Medical Oxygen Plants (1 TPD & 2 TPD)
Medical Oxygen Plant of 1TPD at Sir C V Raman Hospital, Bengaluru, 2 TPD plant at Hinghanghat, Wardha, MS & Veraval Gujarat.
IOTDC FEED – Nano Dispersion Pilot Plant, IOCL R&D Facility 2, Faridabad
Concept & FEED development, EPC Cost Estimate for Nano Dispersion Pilot plant consisting of Hydrocarbon based Ceramic & Nano Ceramic semi-commercial production plant along. With underground Hexane, Hydrocarbon, Chemical storage tanks, Solvent Recovery & Vapor Recovery Systems.
IOTDC Pipeline Test Loops - Gas Test Loop (GTL), Wet Test Loop (WTL), Multiple Purpose Test Loop (MTL), Linear Pull Through Rig (LPTR).
Concept & FEED development, EPC Cost Estimate for Pipeline Gas Test Loop for intelligent pig calibration consist of reciprocating & circulation compressors, gas dehydration, 1.2 KM of 18” ANSI 600# pipeline, pig launchers, receiver, 11 KV motor of 2.4 MW and electrical systems, Control and safety system
Concept & FEED development, EPC Cost Estimate for Wet Test Loop (WTL), Multiple Purpose Test Loop (MTL) along with HSD storage tanks, Linear Pull Through Rig (LPTR).
Exterran Energy USA / UAE
Rigging & Lifting studies, Constructability Review for 250MMSCFD Train of KM500 Gas Treatment Plant at Kurdistan, Iraq
Petrofac Emirates – Nawah FLSS Skid Project
Concept, design, engineering, procurement engineering, skid fabrication management and construction at site of Flow Loop Simulator Skid for training.
ADNOC-AL Yasat Petroleum FEED FOR BELBAZEM (Petrofac-NPCC JV)
FEED services for the Belbazem Block Development Project. FEED support to the JV for Base & alternative case for oil & gas processing facility.
ADNOC-NEB FEED FOR REMOTE OPERATION & CONTROL (Yokogawa + KBC + Baker Hughes)
FEED Services for unmanned operation of NEB Field.
The NEB development comprises three major fields namely ‘Al Dabbiya, Rumaitha and Shanayel’.
Supporting Yokogawa to carry out landscape assessment, gap analysis, governance, operations and business model process to deliver assets from manned operation to 100% unmanned facilities.
Remote operation from Company Central Command Centre for superior making process along
with efficient collaboration to achieve ultimate recovery, operation excellence and making the day to day operation more efficient.
PDO-Flare Gas Monetization Project: USD 300 million
Co-Developed Flare Gas Monetisation Boot Project, along with partners in Middle East (Chemietech UAE & BEC, Oman).
Pre-Bid Engineering and FEED development work for Flare Gas Processing & Monetization to power at 34 facilities consisting of 0.413 million Nm3/day Sour Gas Processing Unit, Sulphur Recovery Unit (SRU), Gas Compression, Gas Dehydration Unit, Gas Turbine Generators, Gas Engines, Waste & Effluent Treatment, and associated utilities. Sour Gas treatment and Sulphur Recovery was based on “BioSkrubberTM” Process Technology with recovery of 20.5 tons/day bio-sulphur & 58 MW of power.
Lukoil West Qurna-2 & Development Project: USD 170 Million
Pre-Bid Engineering, FEED verification & endorsement, EPC cost estimate work for Lukoil West Qurna-2, WP-04, WP-09, WSW-22&27, consisting of 56 wells, 16 km pipeline, 132 kV OHL, MPFM, MFSV, packaged substations, ICSS, Telecom system, modification at central Degassing Facility in Iraq for Petrofac International Ltd.
Petrofac UAE Discipline Manager
From [Mar 1998 to Nov 2014]
Recruiting right candidate from the local industries
Training them on the job with Petrofac systems and business processes
Guide them for the ongoing project and proposal work as a support to Petrofac office in Sharjah
Active contribution to continual development of internal procedures on engineering of rotating equipment.
Responsible for proposal engineering and detail engineering of rotating equipment in many projects.
Only the major equipment handled in the projects are listed below.
AGT Pipeline project, BTC Pipeline Company, Georgia:
Item : Gas Turbine driven Centrifugal Pump
Service : Main Oil Line Pump
Capacity : 2233 m3/hr
Discharge pressure : 115 barg
Power : 6.5 MW
Pump make : Sulzer
Gas turbine make : Solar Turbines (Model: Mars 100)
Responsibility : Package Engineer
Field Development Project, TOTAL Kharyaga, Russia:
Item : Motor driven Reciprocating Compressor
Service : Associated Gas
Capacity : 18800 Nm3/hr
Discharge pressure : 354 barg
Power : 2.4 MW
Compressor make : Nuovo Pignone
Responsibility : Lead Rotating Equipment Engineer
GTG project, Al Furat Petroleum Co. Syria:
Item : Gas Turbine Generator
Power : 42.1 MW (ISO rating)
Model : Frame 6
Make : General Electric
Responsibility : Lead Rotating Equipment Engineer
Asab Thamama Gas Injection Pilot Project, ADCO, UAE:
Item : Motor driven Reciprocating Compressor
Service : Associated Gas Injection
Capacity : 25180 Nm3/hr
Discharge pressure : 343 barg
Power : 4 MW
Compressor make : Nuovo Pignone
Responsibility : Lead Rotating Equipment Engineer
Dukhan Consolidated Facility Upgrade Project, Qatar Petroleum
(Formerly QGPC):
Item : Gas Turbine driven Centrifugal Compressor
Service : Associated Gas
Capacity : 8320 Nm3/hr
Discharge pressure : 31.4 barg
Power : 7.9 MW
Compressor make : Thermodyne
Gas turbine make : Solar Turbines (Model: Mars 100)
Responsibility : Package Engineer
The main equipment that was engineered from this office was:
El Mark, Anadarko Algeria:
Item : Turbo Expander Re-compressor
Service : NGL plant
Capacity : 275,795 kg/hr
Power : 5.3 MW
Make : Cryostar
Responsibility : Guide a Package Engineer
Item : Fire Water Pump Package
Capacity : 681 m3/hr
Discharge pressure : 10 barg
Power : 264 kW
Pump Make : Patterson
Diesel engine make : Caterpiller
Responsibility : Guide a Package Engineer.
In the year 2010, I was transferred to Petrofac Emirates, a JV that was formed for establishing a dedicated engineering centre with a specific focus on Abu Dhabi oil fields, as a Discipline Manager (Rotating Equipment).
Responsible for proposal engineering of rotating equipment of all the bids prepared from Abu Dhabi office by guiding around twelve engineers working with me.
UZ 750 Project, ZADCO, UAE.
Major equipments are:
Item : Gas Turbine Generator (Modularized)
Power : 42.1 MW (ISO rating)
Model : Frame 6
Make : General Electric
Item : Motor driven Centrifugal Compressor:
Service : Associated Gas
Capacity : 113,715 kg/hr
Discharge pressure : 135 barg
Power : 12 MW
Compressor make : Hitachi
Item : Motor driven Centrifugal Pumps:
Service : Water Injection
Capacity : 1457 m3/hr
Discharge pressure : 215 barg
Power : 12 MW
Pump make : Sulzer
As a part of our contract with ZADCO, it was our responsibility to provide technical training to Emirati employee of ZADCO. These people were mostly fresh engineering graduate and started their carrier in Oil & Gas Engineering. I was responsible for providing training on Rotating Equipment through classroom lectures and hands-on during the course of the job.
Toyo Engineering India Ltd. Mumbai Manager (Rotating Equipment Group)
From [Apr 1989 to Feb 1998]
Responsibilities:-
On joining the organization, I was deputed to Toyo Engineering Corporation, Japan, the parent company, for two years (1989 -1991) for working on their overseas project. First an Ethylene Petrochemical Project of South Korea and then on a Gas Sweetening Project of Hungary. I had the experience of working with our Japanese counterparts for better understanding on the systems and procedures being followed in EPC business. Furnished below are the major equipment that I was involved with.
350000 MTA Ethylene Plant, Honam Petrochemicals - South Korea:
Item : Centrifugal compressor
Service : Charge gas compressor
Drive system : 24 MW steam turbine drive
Compressor make : Ebara Corporation
Turbine make : Mitsubishi
Item : Centrifugal compressor
Service : Ethylene refrigeration compressor
Drive system : 24 MW steam turbine drive
Compressor make : Ebara Corporation
Turbine make : Mitsubishi
Item : Centrifugal compressor
Service : Propylene refrigeration compressor
Drive system : 14 MW steam turbine drive
Compressor make : Ebara Corporation
Turbine make : Mitsubishi
Item : Centrifugal compressor
Service : Methane refrigeration compressor
Drive system : 3 MW motor drive
Compressor make : Dresser Rand
Gas Sweetening Plant for Hungary:
Item : Reciprocating compressor
Service : CO2 compression
Drive system : 900 kW gas engine drive
Compressor make : Thomassen
Gas engine make : Waukesha
On return from Japan, I was given the responsibility of Head of Rotating Equipment Group in Mechanical.
Following are the different projects executed during this period.
Bharat Heavy Electricals Ltd. Hyderabad, India Senior Engineer
From [Oct 1981 to Mar 1989]
Responsibilities:-
Started as a Graduate Engineer Trainee in BHEL. After completion of one-year training programme, I was posted in engineering division of Turbine and Compressor. With initial on-the-job training to the basic engineering of steam turbines and centrifugal compressors, I was assigned to Field Engineering Services, a part of engineering division, and given responsibility of the following activities:
Work involved preparation of performance test procedure of steam turbines and compressors in accordance with Power Test Code, carrying out performance testing at site and preparation of test report.
Conducted performance test at site for the following machines:
Travelled extensively to fertilizer, petrochemical and steel plants in India for checking the performance of the machines supplied by BHEL and recommending corrective actions, when needed.
Repair of steam turbine and centrifugal compressors:
Engineering design documents were prepared and issued for manufacturing and repairing of parts based on the inspection carried out for understanding the extent of damage taken place to the machines and replacement required.
Issue design documents for manufacturing of spare parts based on the purchase order received from different customers for supply of the spare parts.
Regular monitoring of purchase orders of spares was a challenge. I developed a computer programme for monitoring of these work orders, which was appreciated and implemented for routine monitoring.