Summary
Overview
Work History
Education
Skills
Personal Information
Software
Timeline
Hi, I’m

NIRAJ PATIL

Quantity Surveyor MEP
Mumbai,Maharashtra
NIRAJ PATIL

Summary

Perceptive MEP Quantity Surveyor and Estimator offering 13 plus years of experience in developing and managing project estimates by coordinating with colleagues and clients. Successful in devising bid proposals in line with client specifications and objectives through clear communication and attention to detail. Driven to minimize costs by continually comparing project costs to estimates and coordinating with leaders on cost-cutting methods.

Overview

14
years of professional experience
3
Languages

Work History

Turner Consulting and Management Services Pvt. Ltd.

Team Leader - MEP
10.2019 - Current

Job overview

  • Preparation of detailed Bill of Quantities and quantity take off in cost-x software for MEP services for various types of projects
  • Preparing cost estimate as per the Bill of Quantities, specifications & drawings
  • Evaluation of all change management including variations, additional works, field changes, additions & omissions and incorporation of the same within the monthly cost reports
  • Prepare technical and commercial evaluation report of bidders and making comparison statement of price bid
  • Prepare budget for tender bid submission and benchmarking with similar kind of project estimate as well as subcontractor quote
  • Prepare value engineering report for cost saving items
  • Prepare submittal log including list out of all data based on shop drawings, product data, sample warranty etc.
  • Under items needed to be submitted as action and informational submittals throughout construction by contractor & vendor based on the data specified in MEPF specification documents
  • Assist in review of submittals based on specification and drawing and provide comments if found any discrepancies between both documents.
  • Monitored team performance and provided constructive feedback to increase productivity and maintain quality standards.
  • Worked with team to identify areas of improvement and devised solutions based on findings.
  • Mentored junior staff members, helping them develop their leadership potential and advance in their careers
  • Managed 4 different clients in month and increased sales revenue by 3%.
  • Delivered high-quality workmanship on all assigned projects, ensuring client satisfaction and repeat business opportunities.
  • Project Details:
    1. The Club SFO at San Francisco
    2. Kaiser MRI Renovation at Oakland
    3. UCB Moffit Library Renovation at Oakland.
    4. NAO-5&6 Data Centre at New Albony, Ohio

LODHA Developers Ltd.

Associate Manager - Design & Cost Optimization
02.2019 - 10.2019

Job overview

  • Review of design development packages and explore further need for cost optimization across various packages and Value engineering options feasible
  • Ensure confirmation of adherence various policies and norms, while review of tenders and release it to procurement for further process
  • Preparation of DD Budgets as per DD drawings and provide inputs on variation in concept design Vs DD Design and cost implication thereto.
  • Maintain active communication with various departments like MEP service design, architecture design and construction management
  • Preparation of pre-qualification documents for tender bid submission and appointment of contractor.
  • Obtain market rates and prepare rate analysis for all items and update rate master periodically.
  • To prepare database of market rates, monitor trends and update same time to time.
  • Conduct techno commercial audits for post contract work and suggest improvements in process to avoid irregularities/mistakes.
  • Worked with team to identify areas of improvement and devised solutions based on findings.
  • Project Details:
    1. Upper Thane project (24nos. buildings G+19TH Floor with infra work for 150Acre land) at Mumbai.
    2. Lodha Pallava Phase 2 project (5nos. of buildings G+22nd Floor with infra work) at Mumbai.
    3. Splendora Platino D Project (G+32nd Floor) at Mumbai
    4. Amara Kolshet (2nos. of residential tower G+27 Floor with 3Pod. level and mini clubhouse + 1 nos. of commercial tower)

Turner Consulting and Management Services Pvt. Ltd.

QS - MEP
11.2016 - 02.2019

Job overview

  • Preparation of detailed Bill of Quantities, estimation and quantity take off in cost-x software for MEP services
  • Preparation of estimation & pre-qualification documents for tender bid submission and appointment of contractor
  • Preparation of rate analysis and value engineering reports based on received contractor/subcontractor quotation
  • Evaluation of all change management including variations, additional works, field changes.
  • Project Details:
    1. KIA – Airport Terminal T2 & Central Utility Plant (CUP) Building [ BIAL, India] at Bangalore.
    2. Hiranandani Fortune City, Panvel (Total 9nos. of Towers, G+35th floors with 3 podium level and 2B floors for car parking) [Hiranandani Developers, Mumbai India]
    3. SNB-1&2 Data Centre at Springfield, Nebraska.
    4. KCM-1&2 Data Centre at Missouri, Kansas City.

Dolphin Trading & Investment LLC

QS - MEP
06.2015 - 07.2016

Job overview

  • Preparation of detailed estimation and quantity take off manually or in AutoCAD software from 2D drawings for the project of Residential Villas and multi story's Tower, commercial building project at pre & post contract stage for MEP services from Tender and shop drawings
  • Evaluate tender/supplier material scope of work and preparation of tender document & floating the enquiry to the suitable vendors/suppliers/subcontractor, follow up with vendors/suppliers/sub-contractor and procure the required quotations
  • Coordinate with subcontractors to receive inputs on pricing on labor, materials and other cost for preparation of tender estimation
  • Preparation of tender suppliers/subcontractor quotes comparison reports as per tender clauses
  • Led engineering teams to successfully complete projects on time and within budget.
  • Preparation of value engineering as per schematic and detailed design and providing the suggestion in design stage
  • Preparation of final tender report/ contract documents to award supplier/sub-contractor LOI & work order
  • Preparation of the cost statements & cash flow statements for client
  • Preparation of contractor running interim bill claims, Follow up with clients / consultant for timely Certification
  • Thorough review and scrutiny of sub-contractor interim valuation and payment certification as per taking out actual measurements on site & drawings (GFC) in timely manner and in accordance with the terms and clauses of agreement
  • Attending weekly site progress coordination meeting with project manager, client/consultant and subcontractor team for additional works or claims from client as per IFC/GFC drawing
  • Appraising the value of proposed services or other structures already erected and preparing the valuation of Monthly progress and final payments in connection with any contract or sub-contract
  • Preparation of variation order as per assessment of the eligibility of variations and evaluating the same by carrying out Quantity Take off & Rate Analysis during the time of site execution
  • Preparation of monthly QS report includes tracking schedules for payments, purchase and work order, variation works along with special observation details, cash flow and bill certification status, project procurement status.
  • Project Details:
    1. Regional Head Quarter [Include 12 Buildings (G+R), 4 Buildings (G+1+R), 1 Building (G+2+R), 6 Nos. of substation 11/0.430KV with 1000KVA & 500KVA Generator Backup, STP Plant and external MEP services] at Nizwa OMAN [Royal Oman Police, OMAN].
    2. Border Post Complex [Include 2 Buildings (G+R), 3 Buildings (G+1+R), 18 Immigration Booths & 1 No, Vehicle Weighing and scanning room, 4 GH, 4 Nos. of substation 11/0.430KV with 1000KVA & 500KVA Generator Backup, STP Plant and external MEP services] [Royal Oman Police, OMAN]
    3. Kitchen and Dining Project (G+2) at Nizwa OMAN [Royal Oman Police].

G.P. Zachariades Overseas LLC.

QS - Electrical
04.2014 - 05.2015

Job overview

  • Preparation of detailed estimation and quantity take off manually or in AutoCAD software from 2D drawings for the project of Residential Villas and multi story's Tower, commercial building project at pre & post contract stage for MEP services from Tender and shop drawings
  • Evaluate tender/supplier material scope of work and preparation of tender document & floating the enquiry to the suitable vendors/suppliers/subcontractor, follow up with vendors/suppliers/sub-contractor and procure the required quotations
  • Coordinate with subcontractors to receive inputs on pricing on labor, materials and other cost for preparation of tender estimation
  • Preparation of tender suppliers/subcontractor quotes comparison reports as per tender clauses
  • Preparation of pre-qualification documents for tender bid submission and appointment of the vender
  • Preparation of value engineering as per schematic and detailed design and providing the suggestion in design stage
  • Preparation of final tender report/ contract documents to award supplier/sub-contractor LOI & work order
  • Preparation of the cost statements & cash flow statements for client
  • Preparation of contractor running interim bill claims, Follow up with clients / consultant for timely Certification
  • Thorough review and scrutiny of sub-contractor interim valuation and payment certification as per taking out actual measurements on site & drawings (GFC) in timely manner and in accordance with the terms and clauses of agreement
  • Attending weekly site progress coordination meeting with project manager, client/consultant and subcontractor team for additional works or claims from client as per IFC/GFC drawing
  • Appraising the value of proposed services or other structures already erected and preparing the valuation of Monthly progress and final payments in connection with any contract or sub-contract
  • Preparation of variation order as per assessment of the eligibility of variations and evaluating the same by carrying out Quantity Take off & Rate Analysis during the time of site execution
  • Preparation of monthly QS report includes tracking schedules for payments, purchase and work order, variation works along with special observation details, cash flow and bill certification status, project procurement status.
  • Project Details:
    1. Al Arab Newsroom Interior Fit-Out Works, Bahrain (Jehan Mohamed Alarayed).
    2. Bahrain International Airport Enabling Work Package 1-B at Bahrain (Ministry of Trans. & Tele., Bahrain).
    3. Banyan Tree Al Nakheel Hotel & Resort, Beach Villa [1, 2 & 3 Bedroom], Kids Club, Water Sports, Pool Grill & Spa, & 5nos. Of Sub Stations, Plant Room @ Janabiya Bahrain.
    4. Multi Storey Car Parking @ Manama Police Fort. (Ministry of Interior Works Directorate Development)
    5. Clinics & Car Parking @ Wadi Al Sail- West Riffa (Bahrain Defence Force Kingdom of Bahrain)
    6. Comprehensive handicapped complex @ A'ali (Ministry of Social Development, Bahrain)

I.G. Petrochemical Ltd.

Electrical Engineer
11.2012 - 04.2014

Job overview

  • Responsible for the Electrical installation systems related to industrial plant and associated infrastructure including substations, power distribution, LV system, earthling, lighting systems etc
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Provided technical support to colleagues on complex issues, assisting them in finding efficient solutions to problems.
  • Coordination of administration/ project execution plans with Subcontractors, Project Team and consultants
  • Prepare & followed the Daily Project Planning activities as well as ensuring safety activities at work site
  • Drawing checking & coordination with consultant be able to carry out construction in conformity with drawings specifications, documents or surveys etc
  • Pricing of Variation claims, evaluation with Contractors / Project Managers and Finalization of Variation Orders (VO)
  • Thorough review and scrutiny of sub-contractor interim valuation and payment certification as per taking out actual measurements on site & drawings (GFC) in timely manner and in accordance with the terms and clauses of agreement
  • Attending daily site progress coordination meeting with project manager, client/consultant and subcontractor team
  • Preparation of monthly QS report includes tracking schedules for payments, work order, variation works along with special observation details, cash flow and bill certification status, project procurement status.
  • Project Details:
    1. IGPL PA-III Expansion Plant & Administration Office Building (22Blocks, 2 Floors) and IGPL Engineer Staff Residence City (4 Buildings, 3 Floors) @ I.G.P.L. at Taloja Navi Mumbai [Indo German Petrochemical Ltd.]

IDEB Projects Pvt. Ltd.

Project Engineer Electrical
10.2010 - 10.2012

Job overview

  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Responsible for the Electrical installation systems related to industrial plant and associated infrastructure including substations, power distribution, LV system, earthling, lighting systems etc
  • Preparation of bill of quantity for project as per site requirement
  • Coordination of administration/ project execution plans with Subcontractors, Project Team and consultants
  • Prepare & followed the Daily Project Planning activities as well as ensuring safety activities at work site
  • Drawing checking & coordination with consultant be able to carry out construction in conformity with drawings specifications, documents or surveys etc
  • Pricing of Variation claims, evaluation with Contractors / Project Managers and Finalization of Variation Orders (VO)
  • Thorough review and scrutiny of sub-contractor interim valuation and payment certification as per taking out actual measurements on site & drawings (GFC) in timely manner and in accordance with the terms and clauses of agreement
  • Attending daily site progress coordination meeting with project manager, client/consultant and subcontractor team
  • Preparation of monthly QS report includes tracking schedules for payments, work order, variation works along with special observation details, cash flow and bill certification status, project procurement status.
  • Project Details:
    1. Villagio Toscana City - (400K sq. Ft area) 116 Italian Residential Apartments & 19 Villa Complex, Pune, INDIA

Education

UBI Brussels, Mumbai

International M.B.A. from Operation

Mumbai

P.G. Diploma from Electrical System Design

N.M. University, Jalgaon

B.E. from Electrical

Skills

Value Engineering

undefined

Personal Information

  • Passport Number: P4421453
  • Date of Birth: 04/05/87

Software

Cost X

Building Connected

BIM Track

Naviswork

MS Project & Primavera P6

Procore

AutoCAD

Bluebeam

Timeline

Team Leader - MEP

Turner Consulting and Management Services Pvt. Ltd.
10.2019 - Current

Associate Manager - Design & Cost Optimization

LODHA Developers Ltd.
02.2019 - 10.2019

QS - MEP

Turner Consulting and Management Services Pvt. Ltd.
11.2016 - 02.2019

QS - MEP

Dolphin Trading & Investment LLC
06.2015 - 07.2016

QS - Electrical

G.P. Zachariades Overseas LLC.
04.2014 - 05.2015

Electrical Engineer

I.G. Petrochemical Ltd.
11.2012 - 04.2014

Project Engineer Electrical

IDEB Projects Pvt. Ltd.
10.2010 - 10.2012

UBI Brussels, Mumbai

International M.B.A. from Operation
2013.04

Mumbai

P.G. Diploma from Electrical System Design
2012.04

N.M. University, Jalgaon

B.E. from Electrical
2010.04
NIRAJ PATILQuantity Surveyor MEP