Directly coordination with Executive Director, General Manager on regular basis for planning of project Led the fabrication team of 27 members and achieved timely the monthly production of 600 MT i.e
RS 360 Lac Finalize the vendors & petty contractors order monthly according to their work order and ours requirement Finalized structural drawing with consultation with client meeting stringent cost & quality requirement Study all the drawings along with Bill Of Material make the needful changes as per site and send for revision Conduct Non Destructive Testing of Butt welds Execute site as per the detailed approved drawings after studying them Arrange inspection persons for the inspection of fabricated structures
Performed quality assurance checks on completed work before final sign off by client.
Assisted in resolving conflicts between contractors and other parties involved in projects.
Monitored the progress of the construction team to ensure all deadlines were met.
Provided guidance to subcontractors regarding construction techniques, materials selection, and cost control measures.
Coordinated with architects, engineers, contractors, and other stakeholders in order to ensure that all aspects of the project were properly executed.
Evaluated existing structures for compliance with building codes and safety regulations.
Conducted regular meetings with contractors, clients, and other stakeholders to discuss project updates and address any issues that may arise during the course of the project.
Provided technical assistance when needed by site personnel or subcontractors throughout the duration of a project.
Organized job-site activities such as scheduling deliveries of materials or equipment rental services.
Prepared monthly financial statements detailing income and expenses related to each project.
Researched, surveyed and inspected sites to review and improve construction plans.
Provided technical advice to project workers to apprise of issues and implement proactive solutions.
Maintained project timelines by reviewing and consolidating submittal comments.
Surveyed sites, collected measurements and assessed project conditions.
Implemented safety and accident prevention programs prior to start of each project, conducting tailgate meetings daily.
Planned and designed transportation or hydraulic systems or structures using computer-assisted design or drawing tools.
Graduate Engineer Trainee
Royal Infra Construction Ltd
08.2009 - 08.2010
Railway project of ‘4.5m Rail Cum Road Bridge’ project over ganga river Patna with strict timelines Handling entire activities related to the monitoring and scheduling of fabrication, testing and commissioning of all the equipment designed and manufactured by the company Planning & allocation of shift manpower to achieve target Provide technical guidance to the team while setting performance parameter.
Contributed to the development of project plans, specifications and reports related to engineering projects.
Interpreted drawings, schematics, diagrams and blueprints effectively.
Compiled and presented public reports and environmental impact statements to inform stakeholders, municipal officials and members of public about planned civil projects.
Kept permits, logs and isolation tags up to date.
Developed design concepts with consideration of safety, cost and environmental impact.
Education
Bachelor of Technology - Mechanical Engineering
Gandhi Institute of Engineering & Technology
Orissa
07.2009
AISSCE - PCM
DAV Public School
Khagaul, Patna
05.2003
AISSE - General Studies
Holy Mission High School
Samastipur
05.2000
Skills
Project Development and Lifecycle
Project Management
Project Scope
Budget Control
Baseline Schedules Creation
Project Planning
Budget Preparation
Schedule Management
Root Cause Analysis
Risk Management
Project Tracking
Vendor Sourcing
Client Relations
Construction Management
Project estimation and bidding
Construction management
Contract Management
Education
Project on 'OERLIKON BLADES COATING COST REDUCTION' at HVAL TATA MOTORS Jamshedpur Study of inline Mechanical Fuel Injection System in six cylinder engine' in college project under the guidance of P.K.Talapatro (HOD Mechanical).
Work Availability
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse
Quote
Success is not final; failure is not fatal: It is the courage to continue that counts.
Head IT - Infrastructure & Service Management at DHL Supply Chain India Pvt. Ltd.Head IT - Infrastructure & Service Management at DHL Supply Chain India Pvt. Ltd.