Results-oriented professional with strong critical thinking skills and a proven track record of driving successful projects. Maintains composure in high-pressure situations and consistently delivers exceptional results through dedication and effort. Eager to contribute to a challenging and dynamic environment that fosters collaboration and mutual growth, aiming to create a positive impact as part of a cohesive team. Committed to continuous learning and leveraging collective strengths to achieve shared goals.
CapEx Projects:
Maintenance:
Operations:
CapEx Projects :
1. Shuttle racking – Increased 50% storage capacity.
2. Bottling hall entire new line installations, replacement of monobloc fillers to unibloc machines, new rinser installations, and lab equipment upgrades.
3. IIoT implementation for OEE, energy, and water monitoring.
4. Overhead modular conveyor for OSC shifting from infeed to packing area of 45 m, with a 3 90-degree bend design.
5. Telescopic conveyors were implemented across Pan India for unloading and loading activities, helping to improve productivity.
6. Multitrack installation to improve OEE from the existing line.
7. 300 kW capacity solar panel implementation.
8. Water-saving initiatives, like increasing the water recovery rate.
9. Reducing the blend batch preparation time up to a 60% reduction in time.
10. New admin building renovations.
11. Caustic hot water, hot water, and DM water market bottle rinser – two machines implementation.
12. Engineering storage racks system.
Maintenance:
1. Preventive maintenance strategy for 300,000 volume units, which runs an average of 28 days per month. Maintained 90% plus adherence.
2. Corrective maintenance strategy – maintenance request form, job card, spares availability, and manpower resources allocation. Maintained 90% plus adherence.
3. Implemented the autonomous maintenance concepts at the site by training the production team, operators, and maintenance, which helped improve OEE.
4. Break down loss reduction by 60%.
5. Ensured that root causes were prepared using problem-solving tools.
6. Maintained machine availability by 85%.
7. Spares procuring and managing the availability at all times.
8. Managed the yearly R&M budget without exceeding the allocated budget to maintain the operations cost.
Operations :
Manufacturing excellence :
Safety:
1. Monitored unsafe conditions, unsafe acts, near misses, and first aid reporting and closure status.
2. Lead fire and electrical safety audits of the plant.
3. LOTO Manager for the site.
4. Implemented machinery safety requirements.
5. Pressure vessel testing requirements as per local authority guidelines.
CapEx Project Management - Planning, Scheduling & Execution
Budget management of Projects and R&M
Problems solving through manufacturing excellence tools
Asset care tools
Safety Management
Energy Management
Good manufacturing practices
ISO standards
Team management
Analytical thinking
Data analytics
Good presentation skills
Good communication skills
Quick decision making capability