Summary
Overview
Work History
Education
Skills
Department Controlling
Current Designation
Current Address
Highest Qualification
Second Highest Qualification
Roles And Responsibilities
Personal Information
Emails
Awards
Projects
Languages
Timeline
Generic
NITIN GUPTA

NITIN GUPTA

DORAHA

Summary

Hardworking employee with customer service, multitasking and time management abilities. Devoted to giving every customer a positive and memorable experience and having a committed and motivated team and similar work environment. Utilize the opportunities to become a versatile engineer.

Overview

14
14
years of professional experience

Work History

Sr. MANAGER PRODUCTION

MOONLIGHT TOOLS PVT. LTD.
Doraha
11.2019 - Current
  • Moonlight Tools Pvt LTD
  • Was established in 2002 as a dedicated manufacturing unit for Hand Tools & Tool Kits and sheet metal parts of Four Wheeler.

DEPUTY MANAGER PRODUCTION

NEW SWAN GROUP
02.2017 - 11.2019
  • New Swan is one of the leading manufacturers of fine blank, sheet metal parts and sub-assemblies.

ASSISTANT MANAGER (PRODUCTION)

AMBER ENTERPRISES (I) PVT LTD.
Rajpura
08.2014 - 02.2017
  • Amber has nine manufacturing plants, located at Rajpura, Dehradun, HP, and NOIDA
  • Group turnover: 1100 Crores (USD 164.18 Million)
  • Major work part of all Type of Fuel Tank and Driver/Passenger Door and Chassis of Bus and Truck of Swaraj Mazda and Combine Parts of John Deere, Govt Agencies, etc.

PPC ENGINEER (PPC)

NEW SWAN GROUP
04.2013 - 08.2014
  • M/S New Swan Group is established in 1985 and ISO/TS 16949:2009: ISO 14001 Certified Company and has reached to a sales turnover of 35.87 Million USD
  • (Manufacturer and Exporter of Auto parts and other sheet metal parts and assemblies in India)

PRODUCTION ENGINEER (MACHINE SHOP, ASSEMBLY SHOP)

TECH AUTO (P) LTD.
09.2010 - 04.2013
  • M/S Tech Auto (p) LTD., Ludhiana, and ISO/TS – 16949:2009 Certified Companies
  • (Producing tubular and sheet metal parts for export in foreign as well as in India .i.e., seat parts and sprocket for TVS motor bikes)

Education

B.Tech. in Mechanical Engineering -

Malout Institute of Management & Information Technology (MIMIT), Malout, Punjab Technical University, Jalandhar
01.2010

Diploma in Mechanical Engineering -

Mehr Chand Polytechnic College, Jalandhar, Punjab State Board of Technical Education & Industrial Training, Chandigarh
01.2007

Matriculation -

Mahavira High School, Faridkot, Punjab State Education Board

Skills

  • Stamping
  • Assembly
  • Production Planning
  • Part Costing
  • Takt Time
  • Line Balancing
  • Cycle time study
  • OEE
  • SMED
  • Kaizen
  • 5S
  • 3R
  • Poke Yoke
  • 3M
  • Welding
  • Riveting
  • Press Work
  • Lean Sigma
  • 7 Waste
  • QC Tools

Department Controlling

I am Oversees a company's organizational processes and planning of operations with required resources to ensure productivity and quality and minimize losses with continues improvements in production processes.

Current Designation

Sr. MANAGER PRODUCTION

Current Address

DASHMESH NAGAR, STREET NO. 6, TELEPHONE EXCHA-NGE DORAHA, LUDHIANA, PUNJAB

Highest Qualification

B.TECH IN MECH. ENGG.

Second Highest Qualification

DIPLOMA IN MECH. ENGG.

Roles And Responsibilities

  • MOONLIGHT TOOLS PVT. LTD., Sr. MANAGER PRODUCTION, To monitor planned production vs. actual production., Daily Work management meeting with our subordinate., Production planning does as per schedule proclamation from customer., Carry out production on final assembly line., Chase in line shortages to meet material at work station in time., Ensuring availability of raw material as per production plan., To ensure all IATF documents up to date., Do control the Rejection/Rework level by analysis on defects., Plan machine and manpower according to cycle time and production target given., Encouraging and increasing operators morale by finding abnormalities in line and create new ideas and implement., IN PRESS SHOP / ASSEMBLY LINE - STAMPING 4W PARTS /WELDING/RIVITING/LOCKING DIFFERENT MODEL - (JACK ASSY/KICK ASSY), Calculation of OVER ALL EQUIPMENT EFFECTIVENESS (OEE)., Do SMED and Line Balancing to increase production & machine utilization., Effective utilization of Man, Material & Machines., Maintaining discipline 3R & 5S at the shop floor., To apply POKE YOKE method to prevent mistakes., Line Re layout optimization.
  • NEW SWAN GROUP, DEPUTY MANAGER PRODUCTION, To monitor planned production vs. actual production., Daily Work management meeting with our subordinate., Production planning does as per schedule proclamation from customer., Carry out production on final assembly line., Chase in line shortages to meet material at work station in time., Ensuring availability of raw material as per production plan., To ensure all ISO - TS documents up to date., Do control the Rejection/Rework level by analysis on defects., Plan machine and manpower according to cycle time and production target given., Encouraging and increasing operators morale by finding abnormalities in line and create new ideas and implement., Calculation of OVER ALL EQUIPMENT EFFECTIVENESS (OEE)., Do SMED and Line Balancing to increase production & machine utilization., Effective utilization of Man, Material & Machines., Maintaining discipline 3R & 5S at the shop floor., To apply POKE YOKE method to prevent mistakes.
  • AMBER ENTERPRISES (I) PVT LTD., ASSISTANT MANAGER (PRODUCTION), To monitor planned production vs. actual production., Daily Work management meeting with our subordinate., Production planning does as per schedule proclamation from customer., Carry out production on final assembly line., Chase in line shortages to meet material at work station in time., Ensuring availability of raw material as per production plan., To ensure all ISO - TS documents up to date., Do control the Rejection/Rework level by analysis on defects., Plan machine and manpower according to cycle time and production target given., Encouraging and increasing operators morale by finding abnormalities in line and create new ideas and implement., Calculation of OVER ALL EQUIPMENT EFFECTIVENESS (OEE)., Do SMED and Line Balancing to increase production & machine utilization., Effective utilization of Man, Material & Machines., Maintaining discipline 3R & 5S at the shop floor., To apply POKE YOKE method to prevent mistakes.
  • NEW SWAN GROUP, PPC ENGINEER (PPC), To monitor planned production vs. actual production., Daily Work management meeting with our subordinate., Production planning does as per schedule proclamation from customer., Carry out production on final assembly line., Chase in line shortages to meet material at work station in time., Ensuring availability of raw material as per production plan., To ensure all ISO - TS documents up to date., Do control the Rejection/Rework level by analysis on defects., Plan machine and manpower according to cycle time and production target given., Encouraging and increasing operators morale by finding abnormalities in line and create new ideas and implement., Calculation of OVER ALL EQUIPMENT EFFECTIVENESS (OEE)., Do SMED and Line Balancing to increase production & machine utilization., Effective utilization of Man, Material & Machines., Maintaining discipline 3R & 5S at the shop floor., To apply POKE YOKE method to prevent mistakes.
  • TECH AUTO (P) LTD., PRODUCTION ENGINEER (MACHINE SHOP, ASSEMBLY SHOP), To monitor planned production vs. actual production., Daily Work management meeting with our subordinate., Production planning does as per schedule proclamation from customer., Carry out production on final assembly line., Chase in line shortages to meet material at work station in time., Ensuring availability of raw material as per production plan., To ensure all ISO - TS documents up to date., Do control the Rejection/Rework level by analysis on defects., Plan machine and manpower according to cycle time and production target given., Encouraging and increasing operators morale by finding abnormalities in line and create new ideas and implement.

Personal Information

  • Total Experience: 13 YEAR
  • Date of Birth: 09/12/88

Emails

nnitinkgupta@gmail.com

Awards

  • Awarded 3rd in Kaizen competition with inter unit platform by our Honorable MD San.
  • Best Cost Saving Kaizen Awarded by our Honorable MD San.
  • Best partition in Small group Activities in plant.
  • Awarded By Plant Head Sir for innovations in plant (Amber Rajpura)
  • Best NWT (Natural Working Team) award achieved from Plant Head Sir. In (Amber Enterprises)
  • Team Winner in training program (Amber Learning Center) in Amber Enterprises
  • Awarded Best Employee of the year 2018 in our unit.
  • Man of the Match in Final Cricket competition in Company.

Projects

INCREASE PRODUCTIVITY 20%, TEAM COORDINATOR, MAR'18 TO APRIL'18, LEAN INDIA CONSULTANT GROUP, NEW SWAN ENTERPRISES REDUCE REJECTION PPM, TEAM LEADER, Pareto Analysis, Histogram, Scattered diagram, Cause and Effect, FMEA, Possible cause validation, Control chart etc., AMBER ENTERPRISES INDIA PVT LTD

Languages

Hindi
First Language
English
Intermediate (B1)
B1
Punjabi
Upper Intermediate (B2)
B2

Timeline

Sr. MANAGER PRODUCTION

MOONLIGHT TOOLS PVT. LTD.
11.2019 - Current

DEPUTY MANAGER PRODUCTION

NEW SWAN GROUP
02.2017 - 11.2019

ASSISTANT MANAGER (PRODUCTION)

AMBER ENTERPRISES (I) PVT LTD.
08.2014 - 02.2017

PPC ENGINEER (PPC)

NEW SWAN GROUP
04.2013 - 08.2014

PRODUCTION ENGINEER (MACHINE SHOP, ASSEMBLY SHOP)

TECH AUTO (P) LTD.
09.2010 - 04.2013

B.Tech. in Mechanical Engineering -

Malout Institute of Management & Information Technology (MIMIT), Malout, Punjab Technical University, Jalandhar

Diploma in Mechanical Engineering -

Mehr Chand Polytechnic College, Jalandhar, Punjab State Board of Technical Education & Industrial Training, Chandigarh

Matriculation -

Mahavira High School, Faridkot, Punjab State Education Board
NITIN GUPTA