An Industrial Engineering professional with an overall 14.0 years of versatile End-to-End work experience in Manufacturing, Consulting & Supply Chain Management possessing hands on exposer in manufacturing operations & projects. Versatile Senior Manager specializing in [Area] and skilled at planning, implementing and overseeing key improvements to drive business growth and efficiency. History of cultivating an open culture with free exchange of information. Pursuing new professional challenges with a growth-oriented company.
Overview
13
13
years of professional experience
3
3
Certifications
4
4
Languages
Work History
Sr. Manager Industrial Engg
Udaipur Cement Works Ltd (Subsidiary of JK Laxmi Cement Ltd)
Udaipur
03.2020 - Current
Responsible for the Implementation of Best Manufacturing Practices, CII bench marking studies, Energy Efficiency, Green Co & Sustainability Projects
Looking after Condition Based Monitoring, Annual Shutdown Planning (Major & Minor), Critical Equipment Health Analysis covering Vibration Monitoring & Total Plant Lubrication Management
Implemented IoT based solution for monitoring of the Vib, Temp
Developed Centralized Lubrication Cell
Developed Extensive Annual Maintenance Contracts for all Critical Equipment
Total Plant Manpower Standardization & Studies in consultation with Human Resources
Co-Ordinator for the overall ISO Management system that includes ISO 9001, 14001, 45001 & 50001
Industrial Engineering Studies leading the overall efficiency projects in Mines, Pyro & Grinding Operations
Responsible for the Employee reward & recognition facilitation schemes like Suggestion Scheme, Kaizen Scheme, Instant Recognition & Star Awards
Facilitating on Management Information Reports includes OEE, MTBF, MTTR, Green Co, and GHG
Part of the 5000 TPD Clinker Production Brown Field Project (Valued about Rs
1650 Cr)
Planning & Coordination for the execution of Capex/Continues Improvement Projects (Valued about Rs
PAN India operations for more than 35 integrated sites for business verticals like Automobile, Retails, FMCG & other Consumer goods
Execution of automation solutions like Reach Truck, Conveyors, BOPTs, Racking, HPTs, Trolley puller, Telescopic Conveyor, Special purpose MHEs Setting up of Warehouse internal benchmarking
Review, Monitoring & Analyzing Standard Cost per unit handling for all commodities
Responsible for the PAN India Asset management - additionally acting as Equipment Manager for all CAPEx/OPEx management including budgets, AMCs, contracts, Techno commercial reviews and other repairs and maintenance
To reduce cost of warehousing operations on routine basis by identifying alternate methods while reducing NVAs (Muda-Muri-Mura) and C/T reduction using the LEAN & SIX Sigma methodologies
Preparing the Optimum Manpower planning for PAN India locations for better utilization of resources
Monthly sharing of vendor performance with the National Head for every site including profitability.
Executive Mfg. Operations
A.T.E. ENTERPRISES PVT LTD
AHMEDABAD
01.2014 - 02.2018
Acted as MR (Management Representative) for implementation of ISO standard
Data analysis using various statistical analysis tools
I.e., 7 QC tools, ABC analysis, Cp-Cpk study, MSA, FMEA, Work Sampling study, Takt time, Kanban, Fish bone Analysis/RCA, Why-Why Analysis, Incident investigation, trend analysis etc
Responsible for conducting Line balancing study, keep observing critical bottleneck areas
Leading process improvement team for Lean Six Sigma Green Belt projects
Continuous improving factory visual displays leading to visually managed factory
Preparing and analyzing sales data for OEM, After Market, Export, Domestic business, Product Mix
To track and monitor customer complaints data to ensure satisfactory closer with CAPA report in stipulated period frame Monitoring and maintaining Legal and other requirements of GPCB, CPCB, and CGWA and Gujarat factory act
Green champ for Ahmedabad business unit (ATE is IGBC certified Green building in Gold Category).
Industrial Engineer
PARKSONS PACKAGING LTD. - DAMAN
DAMAN
10.2010 - 06.2013
Making Project Time plan for installation of New Project’s Assembly and Machining lines in co-ordination with other departments
Assisted QMS head on documentation & records management, internal audit management
Layout planning for maximum utilization of available resources and minimum material movement
De-bottlenecking at required stages for achieving production target
Finding and eliminating causes for less utilization of machines through daily monitoring and analyzing and acting on OEE improvement plan
Reduction in changeover time using SMED concept from 2.5 Hrs
To 60 Min – For Die cutting
Work Content reduction by process restructuring and ergonomics
Carrying out Ergonomic study to find out fatigue intensive areas to implement solutions
Maintaining all the reports like productivity MIS, Improvement done and their benefits/Capex Preparation.
Skills
ISO 9001-14001-45001-50001 MS DigitalizationPlant Condition MonitoringLean Six SigmaCII Green CoTPMKaizen5SCost Saving InitiativesManpower StandardizationInventory OptimizationCapex & Opex Budget PlanningTQMProject ManagementData Analytics & MISMS OfficeTechnical AnalysisPeople Management
Certification
Certified Project Management Professional (PMP)
Notable Contributions
Cement Industry, 03/2020, Present, Improved Overall Shutdown Maintenance Planning process that reduced overall shutdown period time for about 7-10 days/Year. Resulting in improved Overall Plant OEE by 15-20% Reported ever highest Kiln net running of 336.6 days for FY 2022-23. Improved overall Critical Equipment Condition by rigors equipment health monitoring and planning. This initiative has improved critical equipment satisfaction level from 67% to 99%.
Supply Chain, 03/2018, 03/2020, Successfully completed End to End set up of company biggest warehouse (2.5 lac sq. ft) of FMCG warehouse. That includes advanced & high-cost CAPEx sourcing including execution of automation solutions (2.5 Cr+), Vendor & Manpower stabilization (450+ contractual labors), Productivity improvement (22%) and cost reduction (19%). Received “Best Innovation” award
Textile Bearing Manufacturing, 01/2014, 02/2018, Received Instant Recognition Award (IRA) for successful implementation of ISO9001, ISO 14001 & BS 18001 MS without any consulting support Successfully developed production assembly line based on Single Piece Flow on recommendation of KTTM (Toyoda India). Reduced process rejection for the top roller manufacturing line from 5.6% to 0.70%.
Printing & Packing Manufacturing, 10/2010, 06/2013, Smooth agreement between Worker’s Union and Company Management without any production loss and labor issue. Implemented piece rate to daily wages (720+ contractual labors) Reduction in approx. 30% manpower cost in final production Successfully implemented automation projects for box sealing machine, pallet wrapping machine, carton strapping machine, developed online box filling fixture
Timeline
Sr. Manager Industrial Engg
Udaipur Cement Works Ltd (Subsidiary of JK Laxmi Cement Ltd)
Manager de Domaine Déploiement de Référentiels at Société Nationale des Télécommunications du Sénégal (SONATEL)Manager de Domaine Déploiement de Référentiels at Société Nationale des Télécommunications du Sénégal (SONATEL)
RESPONSABILE SISTEMA DI GESTIONE QUALITA' at CONSORZIO XENIA (WEBUILD-PIZZAROTTI-GHELLA-TUNELL PRO)RESPONSABILE SISTEMA DI GESTIONE QUALITA' at CONSORZIO XENIA (WEBUILD-PIZZAROTTI-GHELLA-TUNELL PRO)