Summary
Overview
Work History
Education
Skills
Disclaimer
Timeline
Generic
Nitin Kulkarni

Nitin Kulkarni

Electrical Engineer
Mumbai

Summary

Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Knowledgeable [Desired Position]. Successfully led cross-functional teams to complete complex engineering projects on time and within budget. Demonstrated proficiency in project management and problem-solving, contributing to continuous process improvements.

Overview

12
12
years of professional experience

Work History

Project Engineer-MCGM & BWSSB Project

Pump academy Pvt Ltd
09.2024 - Current

Sr. Electrical Engineering

DRN Infrastructure Pvt Ltd
01.2024 - 09.2024
  • Operation & Maintenance of 180 MLD Versova WwTF (STP)

Sr. Electrical Engineering

Goodwill Powertech & Equipment’s Pvt Ltd
09.2022 - 12.2023
  • Transformer Installation, Commissioning, Testing & Maintenance.

Plant in charge & Electrical Engineer

Gharpure Eng & Constructions Pvt Ltd
06.2021 - 09.2022
  • WTP & 27 MLD Pumping Station & Sub Station, Project & Maintenance
  • Provided technical support to colleagues on complex issues, assisting them in finding efficient solutions to problems.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.

Sr. Electrical Engineering

SPML Infra Ltd
02.2016 - 08.2020
  • STP Plants Maintenance & Projects

Electrical Engineering

Linc Facility Services
06.2015 - 12.2015
  • Electrical Maintenance at Hamad international Airport

Electrical Engineering

Organic Recycling Systems Pvt. Ltd.
08.2011 - 09.2014
  • 3MW Power Plant Electrical Maintenance & Projects (Waste to Energy)

Electrical Engineering

Sterling Project & Engineering Ltd
07.2009 - 08.2011
  • Telecom.

Project Manager

Reliance Infocomm, ltd.
05.2008 - 06.2009
  • Telecom

Education

Diploma - Electrical Engineering

BATU University
Lonere,Maharastra
06-2007

Skills

MAINTENANCE WORK

200KVA to 50MVA Transformer Testing & Charging, Distribution Transformer & Power Transformer Commissioning & Maintenance, OLTC Panel, RTCC Panel, Marshalling Box(Alarm Systems), Annunciators, Oil Leakages All type of Transformer Work, Bus duct, Earthlings Systems, Power monitoring & Control Systems, ACB, VCB, SF6 Breakers Servicing, 1 HP to 750 HP HT-LT Motors & HT-LT Panels, 33 KV Substation, Sump Pumps & Panels, Panel Board (DP),Etc All Equipment are handled Schedule SOP & PPM (Weekly, Monthly, Quarterly, Yearly) Spare management, Time management, and crises management

Looking into the installation of utility such as ACDB, AC, DG, SMPS, commissioning of AC & DG, SMPS Maintain Shift Activities Looking into the maintenance & breakdown of utility such as 180 KVA DG SET, SMPS, SUBMERSIABLE PUMPS, RO water pumps, scrubber pump, MOTORS FROM 1 HP TO 60 HP, 90HP, 120HP, VFDS (ABB,Schnider MAKE) ETC

PROJECTS WORK

Sensors Installation Motors,Pumps,Submersible Pump &, Dry Pit Submersible pumps All Types of Pumping Stations

Supported Equipment’s installation & Commissioning(UPS,Network Rack,Cabinet,Junction Box,Earthings) Up to 300mm Cable Tray and Cable Laying Installation work

Communication with client and smoothly run projects

Planning & management of distribution lines and substation works

Planning of strategies of Erection, Commissioning & Testing of substation & allied distribution work

Execution of 33 KV Lines, 11 KV Lines, LT Lines & Distribution transformer centers Execution of 33/11 KV substations, 33 KV Bays & 11 KV Bays

Execution of all the O/H as well U/G cable works of 33 KV, 11 KV & LT line

Execution of all the distribution network activities with solution of all the row problems Subcontractor handling with all the technical support with project specifications

Control cabling & termination works

Inspection of Electrical materials, Drawing approval & Material Management

Electrical maintenanceTechnical Support

To maintained the plant by assessing its performance and estimate cost of replacement of plant member (pipeline, valves, pressure gauge, air and water filter) Planning & management of distribution lines and substation works Planning of strategies of Erection, Commissioning & Testing of substation & allied Distribution works Material reconciliation & billing of all sub-contractors To trouble shoot the electrical & Instrumentation problems during commission phase To perform the testing of MCC Breakers along with vendor using Kit CP-100 (Single Phase)

To maintain 480 kw HT Motors, HT-LT Panels, 33kv Substation For Pumping stations, Swara get reatment Plant & Water Treatment Plant Execution of Corrective & preventive Maintenance activities for Shutdown Activities as per planning schedule To supervise the Installation & Commission of Electrical Distribution boards, VFD Panels, To supervise the Installation & Commission of Electrical Distribution boards, VFD Panels, Dimmer Panels, Lighting DBS as per the drawings & Equipment layout

Project management

Analytical thinking

Schedule management

Disclaimer

Thanks & Regards Nitin P Kulkarni.

Timeline

Project Engineer-MCGM & BWSSB Project

Pump academy Pvt Ltd
09.2024 - Current

Sr. Electrical Engineering

DRN Infrastructure Pvt Ltd
01.2024 - 09.2024

Sr. Electrical Engineering

Goodwill Powertech & Equipment’s Pvt Ltd
09.2022 - 12.2023

Plant in charge & Electrical Engineer

Gharpure Eng & Constructions Pvt Ltd
06.2021 - 09.2022

Sr. Electrical Engineering

SPML Infra Ltd
02.2016 - 08.2020

Electrical Engineering

Linc Facility Services
06.2015 - 12.2015

Electrical Engineering

Organic Recycling Systems Pvt. Ltd.
08.2011 - 09.2014

Electrical Engineering

Sterling Project & Engineering Ltd
07.2009 - 08.2011

Project Manager

Reliance Infocomm, ltd.
05.2008 - 06.2009

Diploma - Electrical Engineering

BATU University
Nitin KulkarniElectrical Engineer