
Seeking opportunities to gain hands-on experience, refine technical skills, and contribute effectively to engineering teams. Dedicated to learning and adapting in a dynamic environment, with a passion for contributing to the development of sustainable and resilient infrastructure solutions that positively impact communities.
• Anantraj sector 63 A gurgaon
•One Good Earth sector 71 gurgaon (curuntly)
•Cement Concrete Road Construction, Prepare a project report on cement Concrete (C.C) road. A concrete road is 2km long, 8m wide and 15cm thick over the sub base of 20mm thick consolidated soil gravel. Survey Camp, Survey Information Table: Compiled data from field survey in a tabular format. Soil Analysis: Calculated soil filling and cutting requirements based on field data. Chainage Division: Divided the road into 30-meter chainages for detailed analysis. Cross-Section Graphs: Created cross-sectional graphs for each chainage to visualize road profile changes. Longitudinal Graph: Developed a longitudinal graph of the full road length to assist in determining the Design Road Level (DRL). Contour Plan: Prepared a contour plan showing road topography, including potholes, mounds, and slope variations in 2023.