With 15+ years in Construction Planning, Supervision, Site Management, Safety Compliance, Quality Control, Quality Assurance, Material Management, Client Servicing, Relationship Management, Project Engineering, and Project Management, Results-driven professional. Expertise lies in ensuring safety compliance, maintaining quality control, and managing project engineering and supervision. With a strong focus on client servicing and relationship management, Consistently delivered successful construction projects. proactive approach and adeptness in material management contribute to seamless project execution. I am seeking opportunities to utilize my skills in a dynamic construction environment.

Overview

15
15
years of professional experience

Work History

Assistant Manager

Aegis Logistics Group
12.2013 - Current
  • AEGIS LOGISTICS LIMITED
  • - Orchestrated the execution of 14 Sphere tanks for LPG gas, each with a capacity of 1350 MT, ensuring adherence to timelines and stringent safety measures.
  • - Supervised the construction of 2 Cryogenic storage tanks, with a capacity of 26000KL each, along with allied facilities, contributing to a comprehensive project investment of 700Core.
  • - Successfully managed the implementation of a 220KV Transmission line accompanied by allied facilities.
  • - Led the construction of the LPG bottling plant and LPG wagon filling facility, optimizing the production and distribution process for enhanced efficiency.
  • - Completed the construction of liquid tanks with varied capacities ranging from 1500KL to 12500KL, significantly bolstering storage capabilities.
  • - Oversaw the meticulous installation of 3200 piles, with depths ranging from 20m to 25.5m and a diameter of 600mm, ensuring robust foundation for the construction projects.
  • - Directed the construction of 6 tank farms, comprising a total of 41 tanks with an average height and diameter of 25m and 20m respectively, ensuring punctual and high-quality completion.
  • - Monitored civil execution and contractor work meticulously to ensure uncompromising quality and strict adherence to timelines, resulting in the successful delivery of projects.
  • - Verified and certified bills using SAP entry, conducted Bar Bending Schedule (BBS) and diligently maintained daily progress reports, ensuring precise financial tracking and project advancement.
  • - Prepared and delivered comprehensive project progress presentations with visual documentation for WRM Projects, facilitating transparent communication and alignment with stakeholders.
  • - Ensured meticulous compliance with government regulations and upheld immaculate records, maintaining a seamless operational environment.

Associate Engineer

PMC PROJECTS (ADANI GROUP)
02.2011 - 12.2013
  • PMC Projects (I) Ltd.
  • - Executed construction of marine and non-marine projects at Adani Hazira Port, overseeing sea shore protection, container jetty, and container yard.
  • - Led the execution of sea shore protection work covering an extensive area of 2.7 km, utilizing geo-bags and gabions for effective erosion control.
  • - Prepared detailed project reports (DPR) and conducted on-site inspections and laboratory assessments.
  • - Managed the installation of 1200 mm diameter piles with a minimum length of 45 meters, as well as the implementation of precast muff, beam, and cast in-situ deck slabs.
  • - Supervised the construction of a yard including RTG crane moment beam and paver block work.
  • - Played a key role in the construction of 10 buildings, conducting the initial pile load test of 300 MT and overseeing the piling work, pile cap installation, and pedestal work.
  • - Meticulously executed all building components, including 122 individual items per building, ensuring compliance with specifications and quality standards.
  • - Supervised the specialized execution of HVAC work and false flooring, while also handling contractor billing and coordinating with architects for project drawings.
  • - Successfully completed all building projects without any non-conformance reports (NCR) or accidents, emphasizing a strong commitment to safety and quality.
  • - Contributed to the storm drainage project, overseeing line-out as per drawings, coordinating with internal departments, and managing a total drainage length of 6.14 km.
  • - Finalized the Bill of Quantities (BOQ) for piles, pile caps, and civil structural work, ensuring precise cost control throughout the project execution.
  • - Directed and guided subordinates on the management of item quantities and cost control measures to optimize project expenses.
  • - Orchestrated piling activities, including boring, reinforcement cage installation, and concrete pouring, ensuring adherence to project timelines and quality standards.

Site Engineer

AASTHA DEVLOPERS
05.2009 - 02.2011
  • Aastha Corporation
  • - Conducted initial land survey and marking of positions for a residential project comprising 6+4 high-rise buildings (G+13), ensuring accurate and efficient project kickoff.
  • - Managed independent execution and quality control of 6 high-rise building projects, ensuring adherence to project timelines and quality standards.
  • - Negotiated contractor rates, resulting in cost savings of 10% for the project.
  • - Coordinated with architects and structural consultants to ensure seamless project progress and compliance with design specifications.
  • - Prepared detailed project reports (DPR), manpower reports, estimates, and costings, contributing to efficient project management and budget control.
  • - Recognized and awarded as “Best Employee Of The Year” for exemplary contribution and dedication to project success.
  • - Prepared Bar Bending Schedules (BBS) for all reinforced cement concrete (RCC) works and obtained approval from the consultant.
  • - Oversaw and managed all project activities including billing, estimating, and reporting, ensuring efficient project execution and compliance.
  • - Updated project activity data and timelines, and maintained accurate project charts for effective project tracking and management.
  • - Verified and finalized contractor bills, ensuring accuracy and adherence to project budgets.

Education

B.TECH - Civil Engineering

Veer Bahadur Singh Paranuchal University (VBSPU)
Jaunpur, India
05.2018

Diploma - Civil Engineering

Government Polytechnic Junagadh
Junagadh, India
06.2006

Skills

    Project Execution

    Construction Projects

    Project management

    Site management & Contractor management

    Cost Estimation

    Billing

Timeline

Assistant Manager

Aegis Logistics Group
12.2013 - Current

Associate Engineer

PMC PROJECTS (ADANI GROUP)
02.2011 - 12.2013

Site Engineer

AASTHA DEVLOPERS
05.2009 - 02.2011

B.TECH - Civil Engineering

Veer Bahadur Singh Paranuchal University (VBSPU)

Diploma - Civil Engineering

Government Polytechnic Junagadh