Summary
Overview
Work History
Education
Skills
Previous Companies
Trainings Taken
Language
Current Ctc
Current Company
Personal Information
Expected Ctc
Projects
Training
Disclaimer
Timeline
Generic

Nitish Tiwari

Indore

Summary

Seeking for an entry into world class, highly professional organization in challenging environment, where, I can use my knowledge as well as personnel attributes to achieve the organizational goals. Organized and motivated employee eager to apply time management and organizational skills in various environments. Seeking entry-level opportunities to expand skills while facilitating company growth.

Good communicator with excellent presentation, team management / building & motivation skills. Progressive Associate Consultant with familiarity in systems, performance and capacity management. Exceptional research abilities and solid presentation skills.

Overview

11
11
years of professional experience

Work History

TPM Associate Consultant

Levers For Change Consulting
Indore
10.2023 - Current
  • Leading the project at Moira Saria For TPM Implementation in Various process of Furnace ,Caster & Rolling.
  • Leading the 20 person operational excellence team for TPM Implementation at Plant Level.
  • Training provided the OE Team about TPM ,Pillars Steps.

TPM Coordinator

Belrise Industries Limited
Indore
03.2023 - 10.2023
  • Implementation of TPM Activity at Plant Level.
  • Implementation Of F & S (IMEA) Activity at Plant Level.
  • Responsible for Preparation of master plan for F & S.
  • 12 Pillar activity monitoring, review & guidance of F & S to team members
  • Inventory cost reduction by inventory management.
  • IHR Reduction of Paint shop by Design modification of Basket loading bar.
  • EBITADA Improvement of Plant by 4 % By Yield improvement & Scrap utilization.
  • Monitoring of IATF 16949:2016 at Plant level.
  • Motivation of Staff & Workers By Providing On Job & Class room Training on Various Topic Of TPM ,F & S.

Section In-charge (Production)

Indo Auto Tech Limited
Takakura
02.2018 - 12.2022
  • Productivity Improvement of Activa Scotty Frame & Handle By 20 % Through Layout Modification ,Losses Reduction ,Operation Merging & IHR Reduction.
  • Activa Scotty & Handle Quality & Productivity Improvement during Set up ,Installation & Trail time.
  • 3S Improved By Implementation of Leg Less Concept.
  • Customer Complaint Elimination Of Swing Arm Assy by Implementation Of QC Circle & Lead Them.
  • Win QCFI Par Excellence Award at National Level for Customer Complaint Reduction.
  • 5s Improved of Line By Standardization of SOP, Line Visuals , POKA YOKE & Part Display Gallery Improvement.
  • Sustenance of Line Improvement by Implementation 3 Layer Audit.
  • Fork Line Productivity Improvement By 30 % By Identification of Bottleneck stage, Cycle time & Losses Reduction.
  • Machine Health Condition Maintain & monitor by Implementation JH of Machines.
  • Operator Upgradation By Implementation of JH Step -4.

Production Engineer & TPM Coordinator

Badve Engineering Limited
Rudrapur
05.2013 - 01.2018
  • Reduce inventory by using KAN BAN System and rejection by using 7 QC Tool & RCA
  • Maintain 5S Activity, Kaizen & Suggestion scheme
  • Productivity Improvement of Center Stand & Rider Step - 25 % By Setup & Adjustment loss Reduction & Operation merging.
  • 4 Manpower Reduction By Doing Kara- Kuri Kaizen.
  • Line OEE Improvement By 74 1to 85 % by losses reduction.
  • Mig Wire Consumption Reduction By Reuse after implementation of Winding Machine.
  • 8 Manpower from material handling by reduction of line organization loss.
  • Responsible for new process development.
  • To Provide Training On Different Topics related TPM, Such as- How to Fill KAIZEN Idea sheet, How to do Why-Why Analysis, Training on different pillars-JH, KK, PM, QM, SHE, E & T ,DM & OTPM ,ABC types defects, TPM 16 Losses, JH step (1-5), TPM Road Map., 5S Etc
  • BAL TPM Award Achieved from Bajaj Auto Limited in 2016.
  • Guidance Provided & Implementation of TPM 8 Pillar Activity At Plant Level.
  • Motivation of Employees & Workers By Providing Shop wise & Class room training various topic related to TPM.
  • Identify Best 5s Zone, Best Kaizen category wise, Best 5s Station, Best Operator, Inspector monthly basis & recognize them as per criteria.
  • Activity & Pillar wise road map map prepare as per JIPM & TPM Excellence Award & Pillar wise activity monitor as per master plan in weekly review.

Education

B.Tech. In Mechanical Engineering -

Anand Engineering College, Agra
07.2012

Intermediate -

UP Board
01.2007

High School -

UP Board
01.2005

Skills

  • Basic SAP Module for Production & Internet Applications
  • MS Office - Word, Excel, PowerPoint
  • TPM
  • IATF 16949:2016
  • Data Collection and Analysis

Previous Companies

  • Indo Auto Tech Limited, Takakura, 02/2018, 12/2022, Section In-charge (Production), Proficient in overall responsibility respective cell function, to review the set objective, Robotic Welding (Panasonic), prepare skill matrix for operator/workers, corrective measure for process sustaining, implement kaizen, poka-yoke for achieving zero defects in coordination with maintenance dept., ensure the availability of manpower and resources for achieving the production targets, to investigate customer complaint and recommend corrective action. Increase the production and productivity to achieve the target with Quality. To prepare the Optimum material requirement plan in line with production plan. Responsible for manufacturing excellence activity at plant level. Responsible for new tool trial & new developed component fitment trial. Rejection monitoring & Analysis using 7QC Tools & PDCA.. Reduce inventory and rejection by using 7 QC Tool & RCA. Reduce part COPQ, Consumable cost & Manpower cost by doing Kaizen to achieve management target. Responsible for Robot Teaching and Programming as well as jigs & fixtures maintenance for reducing downtime during shift running. Maintain the Q & D Board & Line wise OE, Consumable & COPQ data & also at Plant level. To provide training to associate & Staff as per training need. To do Kaizens and motivate the workers to do the more Kaizens. To Provide Training On Different Such as- Welding Defect, Welding Process, SOP, How to Fill KAIZEN Idea sheet, How to do Why-Why Analysis, TPM 16 Losses, 5S, Kaizen, 3M, TPM Pillars, Safety Etc. Departmental KRA made monthly & Plant level MRM made on monthly basis. Maintaining Departmental Shop floor management file & Responsible for shop floor management audit. Responsible for production department IATF 16949:2016 audit. Responsible For Manufacturing Excellence Activity at Plant Level.
  • Badve Engineering Limited, Rudrapur, 05/2013, 01/2018, Production Engineer & TPM Coordinator, Reduce inventory by using KAN BAN System and rejection by using 7 QC Tool & RCA. Maintain 5S Activity, Kaizen & Suggestion scheme. Handling Plant Level TPM related activities on shop floor. To plan & conduct the daily audit or review dept. Wise Performance on JH, 5S, Matl. Handling, OEE, Kaizen, TPM circle. To Provide Training On Different Topics related TPM, Such as- How to Fill KAIZEN Idea sheet, How to do Why-Why Analysis, Training on different pillars-JH, KK, PM, QM, SHE, E & T ,DM & OTPM ,ABC types defects, TPM 16 Losses, JH step (1-5), TPM Road Map., 5S Etc. To update the monthly Plant level TPM board and also Customer TPM board on Monthly basis. To work on 1S, 2S activity at plant level with plan zone wise. To Prepare the Pillar wise activity Plan. To follow the TPM consultant as per his guideline. TPM Activity driven as per TPM Excellence & JIPM Criteria. To work & responsible for TPM Excellence & JIPM award. To provide & Conduct training as per training need. Maintain the PQCDSM board & Review Department wise PQCDSM Board. Identify Best 5s Zone, Best Kaizen category wise, Best 5s Station, Best Operator, Inspector monthly basis & recognize them as per criteria.

Trainings Taken

  • 5 S
  • KAIZEN & Suggestion
  • TPM
  • Why-Why Analysis
  • Visual Management & Control
  • 7 QC TOOL
  • All TPM Pillars
  • SOP
  • IATF 16949:2016

Language

English, Hindi

Current Ctc

7.8 LPA

Current Company

Belrise Industries Limited, Indore, 12/2022, Present, TPM Coordinator, Handling Plant Level TPM related activities on shop floor. To plan & conduct the daily audit or review dept. Wise Performance on JH, 5S, Matl. Handling, OEE, Kaizen, TPM circle, Safety. To Provide Training On Different Topics related TPM, Such as- How to Fill KAIZEN Idea sheet, How to do Why-Why Analysis, Training on different pillars-JH, KK, PM, QM, SHE, E & T ,DM & OTPM ,ABC types defects, TPM 16 Losses, JH step (1-5), TPM Road Map., 5S ,10 Step methodology of IHR Reduction, Seven step Methodology of Zero Breakdown Etc. To update the monthly Plant level TPM board. To work on 1S, 2S activity at plant level with plan zone wise. To Prepare the Pillar wise activity Plan as per Target. Review Pillar wise Activity running status & provide guidance as per need. To follow the TPM consultant as per his guideline. To work & responsible for JIPM award. To provide & Conduct training as per training need. Maintain the PQCDSM board & Review Department wise PQCDSM Board. Identify Best 5s Zone, Best Kaizen category wise, Best 5s Station, Best Operator, Inspector monthly basis & recognize them as per criteria. TPM Circle wise define kaizen theme & allocate to TPM Circle team. Work on Visualization Improvement of Plant. Coordinate & support to pillars chairman for activity completion as per target date. Identify Pillar wise Best Kaizen, Make presentation& participate & quality circle & kaizen competition. Responsible for F & S (IMEA) Activity at Plant Level. Responsible for Preparation of master plan for F & S. 12 Pillar activity monitoring, review & guidance of F & S to team members. Responsible for F & S Award

Personal Information

  • Father's Name: Mr. Sudhansu Tiwari
  • Date of Birth: 12/20/1992
  • Nationality: Indian

Expected Ctc

Negotiable

Projects

Fabrication of IR based induction braking system.

Training

Completed my summer training in ‘NTPC, dadri’ from 20/06/2011 to 20/07/2011.

Disclaimer

I hereby declare that the information given above is correct to the best of my knowledge. In case of any error or omission found at a later date, I shall be liable for consequences arising out of it.

Timeline

TPM Associate Consultant

Levers For Change Consulting
10.2023 - Current

TPM Coordinator

Belrise Industries Limited
03.2023 - 10.2023

Section In-charge (Production)

Indo Auto Tech Limited
02.2018 - 12.2022

Production Engineer & TPM Coordinator

Badve Engineering Limited
05.2013 - 01.2018

B.Tech. In Mechanical Engineering -

Anand Engineering College, Agra

Intermediate -

UP Board

High School -

UP Board
Nitish Tiwari