Electrician
Radhe Construction, Tata Project Limited
Pachpadra, Balotra
01.2024 - Current
- Constructed control panels from blueprints or schematic drawings.
- Inspected electrical equipment and systems to identify hazards, defects and the need for adjustment or repair.
- Ensured that all work was completed in accordance with applicable codes.
- Repaired or replaced worn or defective parts using hand tools and power tools.
- Followed safety procedures when working on energized circuits; observed lockout and tagout requirements when servicing equipment.
- Maintained current electrician's license or identification card to meet governmental regulations.
- Performed electrical installations, maintenance and repairs of electrical systems, wiring, fixtures and components.
- Operated equipment and machinery according to safety guidelines.
- Managed time effectively to ensure tasks were completed on schedule and deadlines were met.