Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Languages
Awards
Projects
Timeline
Generic

O S C VIMAL BABU B.E.,M.S.,

Jharsuguda

Summary

  • Results-driven senior-level Large-Scale Manufacturing Plant Operations Manager and engineer armed with a graduate degree and 16 years' experience.
  • Dedicated to improving efficiency, productivity, and profitability of organizations through the development and execution of innovative, cost-effective solutions.
  • Adept at leading teams in the optimization of processes and procedures within manufacturing plants.
  • A Turnaround Specialist in business continuity & sustainability, cost optimization, capacity improvement, minimizing process validation, power consumption, digitalization, quality and improving customer experience Stake holder's engagement by supporting and influence internal & external
  • stakeholder's towards Mission & Vision of organization Experienced Manufacturing Engineer and Internal Energy & IMS Auditor with a background in leading process improvement initiatives and managing high quality metal introductions.
  • Expert in Lean Six Sigma, Minitab,Power BI and database management. Successfully reduced SPC of aluminium by 15%, COP V2 cost 15$ per year through lean manufacturing processes.
  • Seeking a Leading role of large scale industry and Internal Auditor position at a company where I can leverage my process improvement and quality management skills to drive results.

Overview

16
16
years of professional experience
1
1
Certification

Work History

Operation & Production Process Lead

Vedanta Aluminium Ltd.
Jharsuguda
04.2019 - Current
  • VALJHA,is the world largest aluminium producer in the single loaction
  • Specific energy consumption of aluminium per metric ton reduced from 14000kwhr to 13450kwhr by process parameter optimization and technology upgradation
  • Vedanta Lining designed which is achieved to reduce energy by 200kwhr/MT
  • SMART Pot digitilization implemented with gain of 10$ reduction in V2 Cost of the COP
  • Created technical documents, risk and opportunity details & certified ISO 50001/2018 Energy policy
  • Digitized process gaps tracking system resulting in 200% increased operator participation in 5 weeks
  • Dream Run & Vardhan Title winner.
  • Managed multiple simultaneous projects within tight deadlines while consistently meeting or exceeding expectations for quality and timeliness.
  • Collaborated closely with engineers on various process improvements that led to significant reductions in equipment downtime.
  • Participated in continuous improvement programs to drive innovation and optimize overall operational efficiency across the facility.
  • Enhanced production efficiency by optimizing machine settings and streamlining processes.

Production Process Incharge & Auditor

Vedanta Aluminium Ltd.
08.2014 - 03.2019
  • As the process lead of an Aluminum Production Plant (smelter) with a production capacity of 5.5 LTPA, my responsibilities included ensuring safe operations in the Pot Room, overseeing aluminum production, managing quality, and implementing industry best practices
  • Focusing on manpower productivity and improving quality production were key aspects of your role
  • Managed 24/7 process improvement, monitored all shift activities, and implemented process enhancement strategies
  • Training 180 new graduates in industrial safety and technical skills represents a notable achievement
  • My work aids in cultivating a competent workforce and promoting safety protocols
  • A detailed structure for collaborative work and improvement initiatives has been prepared in conjunction with experts from McKinsey, PwC, and BEE.
  • Provided detailed documentation on audit findings, facilitating swift corrective action when necessary.
  • Maintained confidentiality, handling sensitive information discreetly throughout all stages of the audit process.
  • Streamlined audit processes, improving efficiency and reducing time spent on each audit engagement.
  • Followed established auditing processes to meet internal and regulatory requirements.

Shift Engineer

VAL
02.2008 - 09.2014
  • Shift Crews to Shift Incharge
  • Pot room operation activities include pot management, anode changing, anode covering, beam raising, metal tapping, and more
  • Implementing the 5S methodology in the workplace
  • I am a certified Six Sigma Yellow Belt and have successfully completed projects using the DMAIC methodology
  • Establish, review, and update Standard Operating Procedures, training manuals, raw materials, and processing materials.
  • Reduced waste generation through continuous process improvement initiatives and diligent monitoring of resource consumption.
  • Streamlined workflow processes, optimizing staff allocation during peak production hours for increased productivity.

Education

MS Manufacturing -

BITS Pilani
Jharsuguda, Odisha
09.2015

Bachelor of Engineering in Electrical -

Anna University
05.2007

Skills

  • Leading big team
  • Excellent Communication
  • Operational Efficiency Team Player
  • Goal Oriented Self Driven
  • Flexibilty & Adaptability
  • Process Control Expertise
  • Waste Reduction

Certification

  • Internal Energy Auditor
  • QMS Auditor
  • 5'S Internal Auditor
  • AO Auditor

Accomplishments

  • Recognized three times as the best technical in-charge for demonstrating voltage reduction and improving shift manpower productivity.
  • Dream Run location achieved
  • Achieved the highest-ever current efficiency of 95.15% in FY 23.

Languages

English
Hindi
Tamil
Sourashtra

Awards

  • CEO Kitty Award
  • Successfully achieved metal production of FY23 by 5% increment of the BP
  • CII Awards- Energy Efficient Unit FY22
  • Best Technical prsentation done in fives internation conferencesIBAAS,INCAL & JNTU

Projects

  • Production Current Efficiency Improvement,FY21 - Improving Cathode Current Efficiency through Operational Excellence and Process Optimization The project received a CE improvement from 93.5% to 95%, resulting in a 2% increase in metal production for the year, along with a resultant energy saving and a $5 reduction in v2 cost per EBITDA.
  • Reduction of Specific Energy Consumption (kwhr/MT), FY23 - Through process trials and modification of the work schedule, the energy consumption per ton of aluminum can be reduced. A reduction of SPC by 20 units per metric ton of aluminum leads to a $2 benefit in COP.

Timeline

Operation & Production Process Lead

Vedanta Aluminium Ltd.
04.2019 - Current

Production Process Incharge & Auditor

Vedanta Aluminium Ltd.
08.2014 - 03.2019

Shift Engineer

VAL
02.2008 - 09.2014

MS Manufacturing -

BITS Pilani

Bachelor of Engineering in Electrical -

Anna University
O S C VIMAL BABU B.E.,M.S.,