Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic
Pandya Kartikkumar Prafulchandra

Pandya Kartikkumar Prafulchandra

Vastral

Summary

Dynamic engineering manager with extensive experience at Arvind Limited, excelling in preventive maintenance and utilities management. Proven track record in project management and effective communication, driving energy savings and optimizing equipment performance. Proficient in SAP and electrical troubleshooting, consistently delivering results while fostering team collaboration.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Manager Engineering Utility and Electrical

ARVIND LIMITED
01.2018 - 12.2025
  • Responsible Compressor and Utility System of plant.
  • Responsible for Preventive and Predictive Maintenance of plant.
  • Responsible for Repairing for electrical and electronics equipment of machine.
  • Responsible for Generating Purchase Requisition for Machine spare parts also follow-ups for Material to purchase as well as vendor up till material reaches to plant.
  • Responsible for repairing material outside of company.
  • Responsible for Right Inspection of material after repairing.
  • Selection of spare part of machine in such a way that budget will be within control.
  • Help to purchase department provide quotation from different Vendor so that they can negotiate easily for material.
  • Responsible for Different AMC of system like Chiller, UPS.
  • Responsible for energy saving of Plant.
  • Daily meeting with production Head and Department Head for breakdown and upcoming project planning with required action Plan.
  • Responsible for Making Overhauling schedule of machine with due time.
  • Responsible for PM Schedule and Shift Schedule of my team members.
  • Working knowledge of HT & LT SWITCH GEAR and power distribution system.
  • Working knowledge of HT AND LT transformers.
  • Working knowledge of Utilities system pump room, fire sprinkler system and humidification Plant.
  • Working knowledge of SAP System for material procurement.
  • Working knowledge of CENTRIFUGAL IR(Ingersoll-Rand)make compressors like C_61, C_55, C_41.

Associate Manager

ARVIND LIMITED
01.2013 - 12.2018
  • Responsible for all printing machine maintenance for Electrical side.
  • Look after maintenance and break down of rotary printing machines.
  • Working Knowledge of burner system in printing Machines.
  • Working Knowledge of various communication system of VFD in printing Machines like PROFIBUS, CAN And Serial Communication.
  • Working knowledge of color Dispenser system fully automated based RS232 and RS-485 Communication system.
  • Working knowledge Different types of Screens Engraving machines used for printing.
  • Working knowledge of different types of cloth guider system like E+L and etc.
  • Budget Control and Inventory Management.
  • Working Knowledge of SAP system Material Procurement.

Project Engineer

ARVIND LIMITED
01.2011 - 12.2013
  • Looking after FBC BOILERS PROJECT.
  • Erection and commissioning Knowledge of FBC boilers and its operation.
  • Project management skill.
  • Inventory management of required material in project.
  • Power and control cable scheduling for project requirement.
  • Cost Estimation of Project.
  • Knowledge of control and instrumentation system of boilers.
  • Distribution and Interlocking of control system.
  • Distribution of power cable and VFD different systems in boilers.
  • Operation and maintenance knowledge of FBC boilers.
  • Knowledge of boiler safety Interlocks of system.

SHIFT ENGINEER

ARVIND LIMITED
01.2009 - 12.2011
  • SHIFT INCHARGE Of 5 MW ROLLS ROYCE Gas Engine and 30 MW CCPP Power plant.
  • Looking after electrical and PLC based automation system of the plant.
  • Responsible for filed Instrumentation automation system of plant.
  • Co-ordinate specific team during operation of plant for any abnormality in plant.
  • Looking after HT VCB AND LT ACB operation in the plant in power failure and tripping situation in plant.
  • Look after HRSG boilers and its Instrumentation.

TRAINEE ENGINEER

ANIL PRODUCT LIMITED
06.2008 - 12.2009
  • Routine check-up of all plants' instrumentation that is critical and directly affects the process.
  • Preventive and breakdown maintenance of all plants.
  • Project regarding instrumentation work.
  • Maintain stock of all plant instrumentation items in the Instrument Lab.
  • Calibration of some critical instruments in our lab.
  • Maintain stock data and material details of all plants.
  • Make plans for the preventive maintenance schedule, and coordinate with the plant in charge for that.
  • Vendor follow-up to instrument head.
  • Record maintenance of: # Daily maintenance work report. # Calibration of Instrument Report. # Preventive, Breakdown, Routine Maintenance Report. Pending work list, and take action on that.
  • Knowledge::
  • PLC-based system of Allen Bradley, Siemens troubleshooting.
  • All types of instrumentation system knowledge. (Gauges, process controllers, switches, transmitters, transducers.)
  • Operating lab instruments (dead weight tester, universal calibrator, tachometer, digital timer, temperature bath, U-tube manometer).
  • Maintenance of all types of control valves, their positioners, safety valves, solenoid valves, and others.
  • Maintenance of the utility side. Compressors, V.A.C. m/c.
  • Collaborated with team members to troubleshoot and resolve technical issues.
  • Assisted in designing and developing engineering projects for product innovation.

Education

B.E - INSTRUMENTATION AND CONTROL

SADAR VALLBHBHAI PATEL INSITIUTE OF TECH VASAD GUJART UNIVERSITY
06.2008

Skills

  • Word
  • Electrical troubleshooting
  • Preventive maintenance
  • Utilities management
  • SAP system administration
  • Project management
  • Equipment maintenance
  • Excel
  • PowerPoint
  • Team collaboration
  • Effective communication
  • Problem solving

Certification

6s Lean Yellow Belt Certificate, 2010

Additional Information

Hardworking and innovative

Timeline

Manager Engineering Utility and Electrical

ARVIND LIMITED
01.2018 - 12.2025

Associate Manager

ARVIND LIMITED
01.2013 - 12.2018

Project Engineer

ARVIND LIMITED
01.2011 - 12.2013

SHIFT ENGINEER

ARVIND LIMITED
01.2009 - 12.2011

TRAINEE ENGINEER

ANIL PRODUCT LIMITED
06.2008 - 12.2009

B.E - INSTRUMENTATION AND CONTROL

SADAR VALLBHBHAI PATEL INSITIUTE OF TECH VASAD GUJART UNIVERSITY
Pandya Kartikkumar Prafulchandra