Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
14
14
years of professional experience
Work History
Sr Engineer
ISHAN Technologies
Jamnagar
03.2024 - Current
Working As Senior ILL Engineer In Ishan Technologies.
To Install,Configure,Maintain Various Wireless Device Like Power Beam,Lite Beam,Rocket M5,Mimosa,Ac gen2 Device.
Monitor wireless network performance and conducted routine optimizations, resulting in a 15% enhancement in data throughput.
Implementation of new sites and checking readiness of fiber & Microwave, Utilities condition for radiating BTS Sites
Telecommunications Engineer
Tata Communication Pvt Ltd
Rajkot
02.2019 - 01.2020
Worked as ILL o&m Engineer In TCL.
Network Management of Telecom transmission equipments especially SDH. Provisioning of leased lines, Trouble shooting of various circuits, VPN’S such as IBW. Coordination with the respective engineers/officials in case of link failures. Testing and commission of circuits through SDH.
Planning, implementation, integration, testing, operations and maintenance of Transmission networks.
Enterprises business network solutions – PRI, BRI, DLC, IPLC, LL and ISP.
Wireless transmission – Microwave, LMDS, FSO and Knowledge of Path Loss Tool.
Wireline transmission – Optic Fiber, Copper and Structured cabling.
Excellent knowledge of Transmission Technologies -PDH, SDH & DWDM for Microwave & Optical Broad band networks, NMS (Network Management Systems).
Ability to communicate with different part of organization to resolve problems and to meet targets.
Telecommunications Engineer
Tata Tele Service
Rajkot
12.2015 - 01.2019
Installation And Commissioning Of ECI Mux(BG20, BG300,BG500,BG1000).
MW Link Set-up, Required RSl, Alignments & Link Maintenance.
BTS Alarm Verification With OMCR, Call Testing Of New Sites, VSWR Measurement.
Cabinet And Sector Expansion As Per Requirements Of Operator.
Coordination With Installation Of BTS ,Microwave ,Battery Bank ,Power Plant ,AMF Panel.
Responsible For NMS Visibility Of Transmission SDH & PDH Nodes.
Climbed and worked on communications towers for the purpose of installing, replacing, and repairing antenna systems equipment.
Inspected completed work to ensure all hardware is tight, antennas are level, hangers are properly fastened, or adequate weather proofing has been installed.
Install, connect, or test underground or aboveground grounding systems.
Installation Of Media Cards, BTS Racks,Ethernet Cable C5,C6 Of low DC power ,sector antena alignment,RRU installation antena and other transmission units mounting on tower.
Telecom-engineer
Idea Cellular
Rajkot
06.2010 - 12.2015
Preventive & Maintenance of Idea Sites in Rajkot Cluster.BTS(RBS 2202/2204/2204V2/2206/2964/2964v2).
Traffic shifting of sites.
Expansion & cascading of RBS 2202 with 2204/2206.
MMU (4x2, 2x2-34-2,5• 34+2), SMU(16x2) Installation & Commissioning for PDH.
Worked on SAU (Service Access Unit) required for the direct line & to connect two AMM(Access Module Magazine).
Programming of software setup and commissioning of SDH & PDH equipment, wherein after establishing the link and loading its parameter, both near end and far end sites, Testing of feeder cable including both jumpers to check the Distance to Fault Ratio & VSWR (Voltage Standing Wave Ratio) and to Troubleshoot if any Problem arises, Testing of cable with TMA (tower Mounted Amplifier), Duplexer.
Monitoring of sites External Alarms, Internal Alarms (CF) from BSC.
Checked & rectify Faults arose on the site.
NEC Hop Configuration.
E1 wiring and through from BSC to BTS.
Site Upgradation/Degradation.
Mini-Link Hope Configuration.
Installation of GSM & Microwave Antenna (0.3/0.6/1.2/1.8/3)with specified degree& Polarization.
Alignment of Microwave antenna PDH & SDH with its High & Low Band Radio with offered Polarizations & degree.
BTS O&M for CDMA & Huawei GSM.
All MUX(100,300,500,1000)login and managed.
CERAGON AND NEC IDU.
Increased operational efficiency through regular monitoring, analysis, And optimization of network systems.
Education
EC -
Shubash Academy
Nashik, India
10.2000
No Degree -
English Prep School
Maharashtra
05.1997
Skills
Telecommunications equipment
Wireless Communication Systems
Hardware installation and configuration
Customer Support Capabilities
Team Leadership Qualities
4G LTE Experience
Fiber Optic Technology
Cisco switch and routing
Troubleshooting
Cisco 6500 switches
Network Management Systems Huawei(NMS),ECI(NMS),Siemens(NMS/EMS),Tejas(NMS/EMS), Nortel (NMS) , Xmanager system for Nortel equipments in NORTNMS Server, NETMAN-NMS for UTSTAR MSAN(DLC)
Power Beam ,Lite Beam,Mimosa,Mikrotik Router and Device COnfiguration