Summary
Overview
Work History
Education
Skills
Timeline
Generic

Pankaj Sukhanandi

Rajkot

Summary

  • Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

14
14
years of professional experience

Work History

Sr Engineer

ISHAN Technologies
Jamnagar
03.2024 - Current
  • Working As Senior ILL Engineer In Ishan Technologies.
  • To Install,Configure,Maintain Various Wireless Device Like Power Beam,Lite Beam,Rocket M5,Mimosa,Ac gen2 Device.
  • Monitor wireless network performance and conducted routine optimizations, resulting in a 15% enhancement in data throughput.
  • Implementation of new sites and checking readiness of fiber & Microwave, Utilities condition for radiating BTS Sites

Telecommunications Engineer

Tata Communication Pvt Ltd
Rajkot
02.2019 - 01.2020
  • Worked as ILL o&m Engineer In TCL.
  • Network Management of Telecom transmission equipments especially SDH. Provisioning of leased lines, Trouble shooting of various circuits, VPN’S such as IBW. Coordination with the respective engineers/officials in case of link failures. Testing and commission of circuits through SDH.
  • Planning, implementation, integration, testing, operations and maintenance of Transmission networks.
  • Enterprises business network solutions – PRI, BRI, DLC, IPLC, LL and ISP.
  • Wireless transmission – Microwave, LMDS, FSO and Knowledge of Path Loss Tool.
  • Wireline transmission – Optic Fiber, Copper and Structured cabling.
  • Excellent knowledge of Transmission Technologies -PDH, SDH & DWDM for Microwave & Optical Broad band networks, NMS (Network Management Systems).
  • Ability to communicate with different part of organization to resolve problems and to meet targets.

Telecommunications Engineer

Tata Tele Service
Rajkot
12.2015 - 01.2019
  • Installation And Commissioning Of ECI Mux(BG20, BG300,BG500,BG1000).
  • MW Link Set-up, Required RSl, Alignments & Link Maintenance.
  • BTS Alarm Verification With OMCR, Call Testing Of New Sites, VSWR Measurement.
  • Cabinet And Sector Expansion As Per Requirements Of Operator.
  • Coordination With Installation Of BTS ,Microwave ,Battery Bank ,Power Plant ,AMF Panel.
  • Responsible For NMS Visibility Of Transmission SDH & PDH Nodes.
  • Climbed and worked on communications towers for the purpose of installing, replacing, and repairing antenna systems equipment.
  • Inspected completed work to ensure all hardware is tight, antennas are level, hangers are properly fastened, or adequate weather proofing has been installed.
  • Install, connect, or test underground or aboveground grounding systems.
  • Installation Of Media Cards, BTS Racks,Ethernet Cable C5,C6 Of low DC power ,sector antena alignment,RRU installation antena and other transmission units mounting on tower.

Telecom-engineer

Idea Cellular
Rajkot
06.2010 - 12.2015
  • Preventive & Maintenance of Idea Sites in Rajkot Cluster.BTS(RBS 2202/2204/2204V2/2206/2964/2964v2).
  • Traffic shifting of sites.
  • Expansion & cascading of RBS 2202 with 2204/2206.

MMU (4x2, 2x2-34-2,5• 34+2), SMU(16x2) Installation & Commissioning for PDH.

  • Worked on SAU (Service Access Unit) required for the direct line & to connect two AMM(Access Module Magazine).
  • Programming of software setup and commissioning of SDH & PDH equipment, wherein after establishing the link and loading its parameter, both near end and far end sites, Testing of feeder cable including both jumpers to check the Distance to Fault Ratio & VSWR (Voltage Standing Wave Ratio) and to Troubleshoot if any Problem arises, Testing of cable with TMA (tower Mounted Amplifier), Duplexer.
  • Monitoring of sites External Alarms, Internal Alarms (CF) from BSC.
  • Checked & rectify Faults arose on the site.
  • NEC Hop Configuration.
  • E1 wiring and through from BSC to BTS.
  • Site Upgradation/Degradation.
  • Mini-Link Hope Configuration.
  • Installation of GSM & Microwave Antenna (0.3/0.6/1.2/1.8/3)with specified degree& Polarization.
  • Alignment of Microwave antenna PDH & SDH with its High & Low Band Radio with offered Polarizations & degree.
  • BTS O&M for CDMA & Huawei GSM.

All MUX(100,300,500,1000)login and managed.

CERAGON AND NEC IDU.

  • Increased operational efficiency through regular monitoring, analysis, And optimization of network systems.

Education

EC -

Shubash Academy
Nashik, India
10.2000

No Degree -

English Prep School
Maharashtra
05.1997

Skills

  • Telecommunications equipment
  • Wireless Communication Systems
  • Hardware installation and configuration
  • Customer Support Capabilities
  • Team Leadership Qualities
  • 4G LTE Experience
  • Fiber Optic Technology
  • Cisco switch and routing
  • Troubleshooting
  • Cisco 6500 switches
  • Network Management Systems Huawei(NMS),ECI(NMS),Siemens(NMS/EMS),Tejas(NMS/EMS), Nortel (NMS) , Xmanager system for Nortel equipments in NORTNMS Server, NETMAN-NMS for UTSTAR MSAN(DLC)
  • Power Beam ,Lite Beam,Mimosa,Mikrotik Router and Device COnfiguration

Timeline

Sr Engineer

ISHAN Technologies
03.2024 - Current

Telecommunications Engineer

Tata Communication Pvt Ltd
02.2019 - 01.2020

Telecommunications Engineer

Tata Tele Service
12.2015 - 01.2019

Telecom-engineer

Idea Cellular
06.2010 - 12.2015

EC -

Shubash Academy

No Degree -

English Prep School
Pankaj Sukhanandi