Summary
Overview
Work History
Education
Skills
Languages
Disclaimer
PROFILE SYNOPSIS
Professional Summary
Timeline
Generic

PARANTHAMAN G

Bangalore

Summary

Challenging position in a growth-oriented organization, which offers diverse job responsibility and will provide me a platform to learn and contribute to the company.

Overview

12
12
years of professional experience

Work History

Assistant Project Manager

Universal MEP engineering & Services (I) Pvt Ltd (TATA Voltas)
12.2024 - Current
  • Project: TATA Electronics (TEPL) Hosur.

Assistant Project Manager

SHANKAR ELECTRICALS SERVICES (I) Pvt Ltd
08.2019 - 11.2024
  • Conduct site visit and finalize the design and for guiding the site supervisors.
  • Controlling site team of manpower consisting 200 Skilled and unskilled employees
  • Giving enhanced work front to sub-contractors
  • Study and understand the contractual requirement and provide input to various departments (Engineering, Materials, safety and Quality etc) for preparing of document such as, Drawings, WPR, DPR, MPR, RFI, job safety analysis etc.
  • Responsible for the Engineering and Execution related activities in EPIC projects.
  • Preparations of schedules/Plan, verification of controlled copy of construction drawings for site construction activities.
  • Verifying layouts, design drawings and identifying weakness to make relevant modification with plans/structures in line as per client specifications.
  • Follow up with progress monitoring, weekly and monthly target preparation, calculation of ready work front availability, allotting work material, reporting to clients about daily progress.
  • Review of Electrical drawing issued for construction.
  • Major Project
  • Bosch Project (Ban 600)-Commercial Base Build Towers
  • Client: Bosch LTD
  • PMC: Knight frank
  • Consultant: TCE (MEP)
  • Sqft Area: 10 Lakh

Project Engineer

STERLING & WILSON PVT LTD
03.2016 - 01.2019
  • Verifying the scope of work and listing out the activities to be carried out.
  • Verifying Tie-in location physically and checking the feasibility for same.
  • To follow up project plan and guide supervisors.
  • Material tracking updation
  • Co-ordination with client & Principal Vendors
  • Successfully Driving the project as per the milestone dates
  • Weekly progress meeting with respective stakeholders.
  • Highlighting Project risks.
  • Effective handling site in good manner.
  • Major Project
  • DivyaSree Techno polis in Bangalore
  • Client – DivyaSree, Base Building project
  • Project Area – 5,00,000Sqf

Site Engineer

MICRON ELECTRICALS
03.2013 - 02.2016
  • Project Planning, Submitting Monthly Weekly Planning Reports to Client/PMC.
  • Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works. Directly
  • Responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution
  • Will be done according to all applicable health, safety, sanitary and environmental standards.
  • Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools
  • Major Project:
  • Oracle Pvt. Ltd in Bangalore, Client – CBRE, commercial projects, Durations – 2013 to 2014, Role – Site Engineer. (Project Area– 6, 00,000 Sqft)
  • Mind tree commercial in Bangalore, Client –Potential Pvt ltd, IT Campus, Duration – 2014 to 2015, Role – Site Engineer. (Buildup Area– 2, 00,000 Sqft)
  • Deloitte Private Limited in Bangalore, Client – CBRE, IT Campus, Duration – 2015 to 2016, Role – Project Engineer. (Buildup Area – 3, 50,000 Sqft

Education

Bachelor of Engineering - Electrical

Chennai University (Dhana Lakshmi College of Engineering & Technology)
Coimbatore, TamilNadu
01.2012

Skills

  • Language/Tools: Auto Cad
  • Application package: MS Office, MS Projects, MS Excel
  • Skills: Documentation, JMR Preparation, Bill Preparation, Site Execution, Co-ordination

Languages

English, Hindi, Tamil, Kannada

Disclaimer

Nationality: Indian Sex: Male Date of Birth: 1991-02-17 Marital Status: Married I hereby declare that the information given above is true to the best of my knowledge and belief. Place: Bangalore Date

PROFILE SYNOPSIS

Versatile professional with 10 years of Experience as Electrical Engineer.

Professional Summary

  • Well experience in process control, planning and Execution.
  • Committed team player with good communication.
  • Have good stream of positive attitude to motivate the team and run Project successful.

Timeline

Assistant Project Manager

Universal MEP engineering & Services (I) Pvt Ltd (TATA Voltas)
12.2024 - Current

Assistant Project Manager

SHANKAR ELECTRICALS SERVICES (I) Pvt Ltd
08.2019 - 11.2024

Project Engineer

STERLING & WILSON PVT LTD
03.2016 - 01.2019

Site Engineer

MICRON ELECTRICALS
03.2013 - 02.2016

Bachelor of Engineering - Electrical

Chennai University (Dhana Lakshmi College of Engineering & Technology)
PARANTHAMAN G