Parkash Chand Birla

Parkash Chand Birla

B.Tech, Civil Engineer, IITian
Ghaziabad,UP

Summary

Dedicated, sincere, hard-working senior civil engineering top management leader with a proven track record of real leadership qualities. Excels in planning, executing, and managing the balance sheet of multiple projects. Over three decades of pioneering success delivering optimum results and business value in high-growth environments.

Overview

38
38
years of professional experience
1987
1987
years of post-secondary education

Work History

CEO

Integration Construction Management Technology
09.2013 - Current
  • Responsible for leading the team of professionals, administratively for supervision and possess excellent project management of the overall strong focus direction, coordination, communication, implementation, planning, organizing, monitoring and controlling the development of multiple project(s) with multiple agencies execution as per agreed economical design & cost parameters in the conformance with the laid down specifications and quality standards.
  • Ensuring consistency with the company strategy, commitments and goals using Microsoft project tools.
  • Directed & lead the overall multiple projects end to end strategizing, conceptualization, planning, execution & controlling OF 2000 + ACRES OF MIXED USE MEGA TOWNSHIP MULTIPLE PROJECTS OF REAL ESTATE PROMOTION, DEVELOPMENTS WITH ACTIVITY SPANNUNG ACROSS INFRASTRUCTURE LIKE ROAD AND ALLIED WORKS / SEWRAGE / DRAINAGE /DOMESTIC AND ALLIED WORKS / SEWRAGE TREATMENT PLANT / RAIN WATER HARVESTING PITS / SEWRAGE PUMP HOUSE / TUBEWELLS / DEVELOPMENT WORKS / M.E.P.SERVICES / OFFICE BUILDING /AND High-tech construction, Turnkey projects, shopping mall, multiplex, Commercial complex, High rise Residential projects WITH HIGH CLASS FINISHES, Low rise residential apartments, Luxury villa’s INDEPENDENT FLOORS /, Farm house (with seven star finishes) COMMERCIAL BUILDINGS / INSTITUTIONAL/ NURSHING HOMES/ MULTIPLEX /Five ,THREE star hotels/ Embassy/ High class factories in India and construction of the business plan development activities to achieve strategy asset foot print to review and ensure that the work under taken at site as per plan and within budget & preparation of mitigation of project schedule for control of projects review to plan & cost estimates / budget.
  • Liaison with government to procure necessary permits, managed local community relationship and deviations from plan in terms of budget schedule and resources escalate to MD / CHAIRMAN.

President (Projects)

TDI Infrastructure Ltd
01.2010 - 05.2013
  • Excellent Co-coordinating, Directing, Controlling, & Communicating with Client, Architects, Service consultants, & Contractors, Site Executions, Implementation of Policies and Procedures, Classification of schedules, project planning and scheduling / mile stone, resourcing, quality control, Cost control /cost estimates, preparation of tender documents, finalization of contractors & vendors for the following prestigious projects AND coordinating /Liaisoning with relevant Authorities and Local people.
  • Design and implementation of all variation orders for any contractual changes, Base line programme on a weekly basis and monthly look-ahead schedules and monitor timelines for all integrated works with the project on micro scheduling.
  • Report in a timely fashion to the relevant project manager on any delays that will incur additional costs to the company.
  • Participate in client. / Consultant meetings / liaison with the procurement dept to produce programmers.
  • Monitoring of resources, manpower, and budget and cash flow histograms.
  • All payment certificates, variation order and updating the cash flow.
  • Manage the construction of the project in accordance with the contract in the most efficient and profitable manner taking particular care of client requirements and companies sub-contractors, and suppliers interest, and leading the site staff to form a cohesive unit resolved to a common purpose.
  • To monitor, co-ordinate and evaluate the work-progress and take corrective / Preventive actions if the project is not moving as per the project schedule, or if there is a quality complaint from the customer.
  • Ends resolve any unexpected technical difficulties and other problems that may arise.
  • Ensure that all site personnel and sub-contractors staff are aware of their responsibilities fully implement the quality system on site.

Sr. Vice President (SSG. Projects)

Integration Construction Management Technology
07.2006 - 12.2009
  • For a project management and Build firm with verifiable year-after-year success achieving revenue, profit and business objectives with in start-up turn around and rapid change environments.
  • DELIGHT SPLENDER” High Rise Residential TowBasement+G+15+2=19 Stories; (1
  • 2
  • 4
  • 15=120 Flats) at sector-57, Gurgaon.
  • ARCHITECT: DEGIGN PLUS / STRCUTURE: S VG CONSLTANT MEP CONSULTANT: MR.H K ANNE/ (M KG) MR.NISHANT.
  • ” HIBISCUS” High rise residential in 13.5 acres land built-up area-12, 00,000, with 9 no’s Villa’s, 10 no’s Pool homes, 26 no’s Pant house, 118 Flats= Total 263 units, 18 TOWERS. At sector-47 Gurgaon.
  • ARCH ITECT: ARCOP/ STRUCTURE: MADAV DESH PANDEY MEP CONSULTANT: MR. ANNE/ ABL HOSPITECH BHUPENDER SNG.
  • “LILAC”-1 Low rise housing-ground, first, second Plot in (2.84 ) acres land; build up area 4.50 Lac sq.ft with 150/180/215 sq. yard = Total 138 units at sector 49,Gurgaon.
  • ARCH ITECT: LINE OF FORCE MR.KAPIL “LILAC” -2 Low rise housing-ground, first, second Plot in (2.97) acres, Land build up area 4.50 Lacs sq.ft. with 290/360/337 sq. yard=120 units; at sector49 Gurgaon.
  • ARCHITECT: Logani& associates, Mr. VivekLogani ” AARON VILLE”- ground, first (Luxury air-conditioned villas) in 15.5 acres land; 317/279/215 sq. yard -> total units= 136 nos.At sector-48 Gurgoan.
  • ARCHITEC: SIKKA/ / STRCUTURE: AKB CONSULANT/, MEP CONSULTANT: R.K. GUPTA “Commercial Plaza”in 1.07 acres land (three basement + ground + 4 stories = 1.50Lac sq. ft. area. at sector 44 Gurgaon.
  • ARCHITEC: SIKKA / STRCUTURE: AKB CONSULANT/, MEP CONSULTANT: R.K. GUPTA.
  • ARCHITECT: SIKKA /STRCUTURE: AKB CONSULANT/, MEP CONSULTANT: S N G.
  • Client: SS Group.
  • “THE GRAND INTERNATIONAL MALL CUM THREE STAR HOTEL”in 2.07 acres land (with two basement +ground+5 stories & Built-up in 60, 00,000 sq. ft. area) at Dhanbad ARCHITECT: GAIN.P Mathur STRCUTURE: Sanjeev Jain Client: Rrastriya Advertisement.
  • ” DDA Facility Kiosk50Nos” at Nehru place, New Delhi ARCHITECT: Design experts.

General Manager (Projects)

Parsvnath Developers Ltd.
09.2004 - 07.2006
  • Project COMPLETED from Beginning to End & Operational.
  • 1.-MANHATTAN MALL CUM COMMERCIAL At Sec-20 A Faridabad.
  • Plot Area=1.157acres (5600sq.yards) Built-up Area: 175000 sqftsARCHITECT: G P MATHUR / STRCUTURE: Denfeb M B Lal / MEP CONSULTANT :( HVAC) ABIDHUSSAN (ELEC.) MR.SHIR SHARMA (PLUM.) P SONI. / INTERIOR: VASTUVID DIPTI AGG.
  • 2. CITY MALL CUM COMMERCIAL at Sec-12 Faridabad.
  • ARCHITECT: G P MATHUR / STRCUTURE: civitechMr.BHOLLA / MEP CONSULTANT :( HVAC) ABIDHUSSAN (ELEC.) MR.SHIR SHARMA (PLUM.) P SONI. / INTERIOR: VASTUVID DIPTI AGG.
  • 3. SAHADARA METRO MALL Area: 105000 sq. ft.
  • ARCHITECT: / Nivedita&Uday Consultants STRCUTURE: civitech Mr.BHOLLA / (HVAC) PANESEA TECH. (ELEC.) MR.KHARBANDA.Client: Parsvnath Developers Ltd.

General Manager (Projects)

TDI Infrastructure Ltd
04.1999 - 08.2004
  • Project completed from Beginning to End &Operational.
  • TDI WESTSIDE / 3C’S MULTIPLEX CUM SHOPPING MALL WITH FOOD COURT at Lajpat Nagar, New Delhi.
  • Plot=1Acre and built up area=105000sq.fts.
  • ARCHITECT: MORPHOGENSIS s/ STRCUTURE: JUNEJATECHNO / MEP CONSULTANT :( HVAC) DEW POINT (ELEC.) MR.HARSE KUMAR. ANNE (PLUM.)SAVI RAM./INTERIOR:.RAJ & SARABJIT SINGH.
  • TATA INFOTECH (Office Building) at 5, Sikendera road, New Delhi Built-up area=60000sq.fts.
  • ARCHITECT/ STRCUTURE / INTERIOR BY GURPREET SINGH.
  • TDI MALL Rajouri Garden, New Delhi. Plot=1Acre and built-up area=150000sq.fts.
  • ARCHITECT: ARCHITECT BUREAU STRCUTURE: JUNEJATECHNO / MEP CONSULTANT :( HVAC) / (ELEC) /(PLUM.)BY SPECTRAL SERVICES CONSULTANT PVT. LTD.

Chief Engineer

Samsung India Electronics Ltd.
06.1996 - 03.1999
  • Project COMPLETED from Beginning to End &Operational.
  • CTV FACTORY/ADMINISTRATION BUILDING /DAY CARE CENTER /CAFFAT AREA /SUB STATION /STADIUM/SITE DEVELOPMENT WORKS/WASHING MACHINE FACTORY/ At Sec-82 Noida, Phase-II.
  • Client: Samsung.
  • ARCHITECT: Sehgal & Associates / STRUCTURE Mr. Rahul Patel/HVAC& ELEC. V S KUKREJA / PLUM. Mr. KALRA.
  • Contractor: CTC AND OMAXE.
  • Plot Area IN 30ACRES (121406 s am) covered area: 350000 sq. ft. Cost = 55 Corers.
  • Targeted Project Completed Within Stipulated Time. (From Land Acquiring to Handling Over &Operational.)

Project/ Process Manager

R. K. Enterprises Builders & Contractors
12.1990 - 05.1996
  • Execution of Project as per Drawings & Specifications with in approved time frame, project co-ordination between Top management , Architects, Structure Consultant , MEP Consultants and site team , quality controlling, Project Management, Tendering / Estimating, Billing, Supervision and Quality Controlling of all site Construction activities as STEEL structure , RCC Structure & all finishing & interior items, Plumbing, Fire Fighting, Air-conditioning, Elect, & Site Developments etc. and Liaisoning with relevant Authorities etc.
  • RESIDENTIALS / COMMERCIALS/ FACTORIES/MALLS / IT PARKS GROUP HOUSING SOCIETY at Sec-13 Rohini.
  • ARCHITECT: Mode Design Consorium. Mr. Mahesh Kr.
  • COMMERCIAL COMPLEX (VISHAL CHAMBER) at Sec-18 Noida. (BASMENT+8STORIES).
  • ARCHITECT: Mehta Gandhi Associates.
  • CONTROL&SWITCH GEAR FACTORY At Noida Phase-2.
  • ARCHITECT/ STRUCTURE/MEP BY M/s Stein Doshi & Bhalla.
  • DATT THE TWIN TOWERS (BUSSINES PARK) at Sec-18 Noida (Bament+9 stories).
  • Plot Area in 2243 sq.mtrs. = (.554 Acre) Built-up area=75000 sq.ft.
  • ARCHITECT/MEP Rajinder Kumar &Associates STRUCTURE/ cemac.
  • JMD KOHINOOR SHOPING MALL. At G K.-2New Delhi.
  • Plot Area in1157.54 sq.mtrs.) Built-up area=19611.21 sq.ft.
  • ARCHITECT/MEP: Sanjay Puri Mumbai/ P.Sharma Structure: PartikMazumdar.
  • COMMERCIAL /IT /FACTORY PROJECTS.
  • Plot No. 94/6 Sec-58 Plot Area=19798 Built-up Area=26750sq.ft.
  • Plot No. 94/7 Sec-58 Plot Area=19798 Built-up Area=26750sq.ft.
  • Plot No. 94/8 Sec-58 Plot Area=19798 Built-up Area=26922sq.ft.
  • Plot No. D-153 Sec-63 Plot Area=37014 Built-up Area=28546sqft.
  • Plot No.D-4Community Center Saket Plot Area 29192Built-upArea=215308 sq.ft.

Asst. Engineer

Competent Construction Company (Engineers& Contractors)
08.1987 - 11.1990
  • 1. URRS EMBASSY ECCONOMIC DEPTT. At chanakya Puri New Delhi.
  • ARCHITECT: Sachdeva /STRUCTURE: Cemac.
  • 2 FIVESTAR HOTEL (HOLIDAY-INN) at Barakhamba Road.
  • ARCHITECT: C P KUKREJA /STRUCTURE: GERZI EASTERN.
  • JOB RESPONSIBILITIES: Engineering Duties, Responsibility For layout/ Survey/ Execution of RCC Structure/ Finishing/ Interior and Billing, Estimating, &Costing Coordination of work with Clients, Subcontractors, and other Principles, and Feasibility, preparation of Specification, and Construction Management Duties, etc.

Education

BACHELOR’S OF CIVIL ENGINEERING -

IIT

MBA - CONSTRUCTION-PROJECT MANAGEMENT

DELHI INSTITUTE OF MANAGEMENT AND STUDIES
Delhi, NCT

Skills

Integration Construction Management Technology

Professional Excellence Summary

OFFERING OVER 03 DECADES OF PIONEERING SUCCESS IN DELIVERING OPTIMUM RESULTS AND BUSINESS VALUE IN HIGH- GROWTH ENVIRONMENTS.

Mission

The group being the most progressive name in the sector is committed to offer quality, professionalism and value to customers with complete trust and credibility.

Personal Information

  • Age: 60
  • Expected Salary: NEGOTIABLE
  • Date of Birth: 08/11/64

Timeline

CEO

Integration Construction Management Technology
09.2013 - Current

President (Projects)

TDI Infrastructure Ltd
01.2010 - 05.2013

Sr. Vice President (SSG. Projects)

Integration Construction Management Technology
07.2006 - 12.2009

General Manager (Projects)

Parsvnath Developers Ltd.
09.2004 - 07.2006

General Manager (Projects)

TDI Infrastructure Ltd
04.1999 - 08.2004

Chief Engineer

Samsung India Electronics Ltd.
06.1996 - 03.1999

Project/ Process Manager

R. K. Enterprises Builders & Contractors
12.1990 - 05.1996

Asst. Engineer

Competent Construction Company (Engineers& Contractors)
08.1987 - 11.1990

MBA - CONSTRUCTION-PROJECT MANAGEMENT

DELHI INSTITUTE OF MANAGEMENT AND STUDIES

BACHELOR’S OF CIVIL ENGINEERING -

IIT
Parkash Chand BirlaB.Tech, Civil Engineer, IITian