To be associated with a progressive and professional organization with challenging opportunity and responsibility where I can utilize strength and skills and to keep myself growing with the company.
Overall, 16 Years 2-months technical experience in Cement Plant (Project) and design consultancy.
Project Profile
Project Profile
· Developed General Arrangement (G.A.) and proposal drawings in compliance with project specifications and industry standards.
· Conducted modifications to engineering drawings to accommodate changing project requirements.
· Prepared detailed Bill of Materials (BOM) for project components, enhancing procurement accuracy and inventory management.
· Created fabrication drawings for venting systems, ductwork, and chutes, optimizing manufacturing processes.
· Generated clear equipment drawings to guide the assembly and installation of machinery.
· Contributed to the manufacturing of various equipment for the cement industry, including Air Slides, Screw Conveyors, Rotary Air Locks, Diverter Gates, Flow Control Gates, Slide Gates, and Different Types of Dampers.
· Assisted in the design of Belt Conveyors and Pipe Screw Conveyors, tailored to the needs of the cement industry.
· Developed General Arrangement (G.A.) and proposal drawings in compliance with project specifications and industry standards.
· Executed modifications to existing engineering drawings to accommodate evolving project requirements.
· Prepared comprehensive Bills of Material (BOM) for accurate project costing and efficient procurement processes.
· Designed fabrication drawings for venting systems, ductwork, and chutes to enhance manufacturing efficiency.
Created detailed equipment drawings to facilitate precise assembly and installation of engineering components