Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Paul Mullins

Lake Station,IN

Summary

Dynamic Framing Foreman at Vater Construction with a proven track record of enhancing project efficiency and customer satisfaction. Expert in construction building and building code compliance, I excel in mentoring teams and implementing time-saving strategies, consistently delivering high-quality results on time and within budget. Strong communicator dedicated to fostering positive team relationships.

Overview

13
13
years of professional experience

Work History

Framing Foreman

Vater Construction
09.2011 - 01.2025
  • Conducted thorough quality control checks throughout each phase of framing process and rectified any discrepancies immediately upon discovery.
  • Implemented cost-effective measures like recycling excess materials or repurposing them for new assignments thereby reducing expenses incurred in purchasing raw materials.
  • Developed strong relationships with clients through regular communication updates on project progress and addressing any concerns or changes promptly.
  • Achieved high customer satisfaction rates by delivering projects on time, within budget constraints and consistently meeting or exceeding client expectations for quality work.
  • Ensured accurate alignment and leveling of structures by utilizing laser levels, plumb bobs, squares, and other precision tools.
  • Enhanced safety on the job site by enforcing OSHA regulations, conducting regular inspections, and providing safety training to all crew members.
  • Expedited construction timelines by effectively managing multiple projects simultaneously while adhering to strict deadlines.
  • Improved overall productivity through strong leadership, clear communication, and timely resolution of issues among team members.
  • Mentored new hires on company policies, procedures, safety guidelines and proper usage of tools; significantly reducing the learning curve and increasing their contribution to the team''s success.
  • Maintained high-quality standards for framing work by demonstrating expert carpentry skills and mentoring junior crew members in best practices.
  • Increased project efficiency by implementing effective construction strategies and delegating tasks to crew members.
  • Boosted employee morale through fair distribution of workload based on individual strengths; this led to increased overall performance during peak periods.
  • Promoted a positive working environment through excellent interpersonal skills and fostering open communication channels between team members.
  • Developed custom solutions for unique building challenges encountered during construction process, ensuring overall structural integrity is maintained without compromising aesthetic appeal.
  • Reduced material waste and costs by accurately estimating job requirements and ordering necessary supplies.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Provided feedback to workers on job performance and safety procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Assisted in recruiting and hiring new construction and extraction workers.

Education

GED -

Liberty Christian Academy
Seymour, IN

Skills

  • Task delegation
  • Materials management
  • OSHA regulations
  • Building codes
  • Power tool operation
  • Hand tool proficiency
  • Layout planning
  • Door installation
  • Window installation
  • Scaffold setup
  • Floor installation
  • Detail orientation
  • Willingness to learn
  • Building codes compliance
  • Teamwork
  • Dependable and hardworking
  • Problem-solving
  • Time management
  • Attention to detail
  • Problem-solving abilities
  • Following instructions
  • Multitasking
  • Construction safety
  • Reliability
  • Excellent communication
  • Organizational skills
  • Team leadership
  • Effective communication
  • Hand and power tool operation
  • Adaptability and flexibility
  • Physical strength and stamina
  • Decision-making
  • Heavy lifting
  • Self control and integrity
  • Site safety
  • Heavy equipment operations
  • Tool operation
  • Site maintenance
  • Team building
  • Safety protocols
  • Forklift operation
  • Hand-eye coordination
  • Task prioritization
  • Employee motivation
  • Worker training
  • Equipment operation
  • Analytical thinking
  • Conflict resolution
  • Employee training
  • Risk assessment
  • Professionalism
  • Blueprint reading
  • Basic mathematics
  • Job planning
  • Safety oversight
  • Crew supervision
  • Time management abilities
  • Continuous improvement
  • Physical stamina
  • Structural analysis

Accomplishments

  • Supervised team of 5-7 staff members.

Timeline

Framing Foreman

Vater Construction
09.2011 - 01.2025

GED -

Liberty Christian Academy
Paul Mullins