Summary
Overview
Work History
Education
Skills
CORE KEY STRENGTHS ACROSS ASSIGNMENTS
PERSONAL INFORMATION
Disclaimer
Timeline
Generic

Pavan Kumar

Naihati

Summary

A seasoned electrical project professional with over 12 years of experience in executing and managing large-scale government and private sector power distribution projects. Proven expertise in leading cross-functional teams, managing end-to-end project lifecycles, and ensuring timely, cost-effective delivery. Adept in handling projects under various central schemes including RDSS, MKVSY, IPDS, DDUGJY, RGGJY, and organizations like CPWD and CBRE. Demonstrated capabilities in project planning and monitoring, stakeholder coordination, material and contract management, billing, and data analysis. Proficient in Lighthouse ERP and SAP, with a strong track record of preparing detailed project reports and aligning technical execution with business goals. A results-driven professional with a solid foundation in electrical engineering, and a strong commitment to quality and efficiency in project delivery.

Overview

12
12
years of professional experience

Work History

Deputy Project Manager – Electrical Execution

M/S Techno Power Enterprises Pvt Ltd
Kolkata
11.2020 - Current
  • Major Projects Handled:
  • 1. Muzaffarpur District Electrification (DDUGJY Scheme) – Bihar.
  • Scope: 33 kV and 11 kV feeder line separation/creation of agriculture and non-agricultural feeders, strengthening, and electrification.
  • 33/11 KV PSS at Bahilwara Rupnath, Saraiya, Muzaffarpur, under North Bihar Power Distribution Company Ltd. (NBPDCL)
  • LOA Cost: ₹240.1 Cr
  • Under scheme DDUGJY (Deendayal Upadhyaya Gram Jyoti Yojana)
  • Status: Project Completed
  • 2. Ara MKVY Project (SBPDCL) – Bihar.
  • Scope: Construction & Extension of 11KV Dedicated Feeders, DTR Installation, LT AB Cable Line Work, New Agricultural Connections, and R&M of LT Lines
  • LOA Cost: ₹79.44 Cr
  • Client: South Bihar Power Distribution Company Ltd.
  • Status: Project Completed
  • 3. Motihari MKVY Project (NBPDCL) – Bihar
  • Scope: Similar to Ara Project – Distribution system strengthening and new agricultural connections under the State Plan scheme
  • LOA Cost: ₹58.01 Cr
  • Client: North Bihar Power Distribution Company Ltd.
  • Status: Project Completed
  • 4. Begusarai RDSS Project (NBPDCL) – Bihar
  • Scope: Development of Distribution Infrastructure for Loss Reduction
  • Scheme: Revamped Distribution Sector Scheme (RDSS)
  • Status: Ongoing

Planning Engineer – Execution

M/S Lanarsy Infra Ltd
Simdega
02.2019 - 06.2020
  • Company Overview: LaNarsy Infra Ltd (Pace Group) is a diversified infrastructure development company with core interests in Energy, Infrastructure, Education, and HR Development sectors, operating in both India and Africa.
  • Major Project Handled:
  • Rural Electrification & Substation Development – Simdega, Jharkhand
  • Scope: Construction of 33/11KV PSS (10 MVA) and associated rural electrification works
  • Schemes Involved:
  • DDUGJY (Deendayal Upadhyaya Gram Jyoti Yojana)
  • Saubhagya (Pradhan Mantri Sahaj Bijli Har Ghar Yojana)
  • 12th Plan Implementation by JBVNL (Jharkhand Bijli Vitran Nigam Limited)
  • Role & Responsibilities:
  • Involved in planning, scheduling, and monitoring of electrification and substation activities
  • Coordinated with site teams, contractors, and vendors to ensure timely material delivery and work execution
  • Tracked project progress and reported milestones to higher management
  • Ensured compliance with quality and safety standards at every execution stage

Site Electrical Engineer

M/S Power and Instrumentation (Gujarat) Limited
Andheri East
03.2014 - 01.2019
  • Company Overview: M/S Power Instrumentation (Gujrat) Ltd is from Ahmedabad leading Manufacturer of MV & LT Panels & also executed Turnkey Projects up to 33KV
  • Key Clients:
  • Ajmer Vidyut Vitran Nigam Ltd (AVVNL), Rajasthan
  • Central Public Works Department (CPWD), Mumbai & Pune Divisions
  • Major Projects Handled:
  • 1. RGGVY 12th Plan Scheme – Simalwara District, Rajasthan (Under AVVNL)
  • Scope:
  • Construction of new electrical infrastructure including:
  • New and reconductoring of 11KV HT lines
  • Installation of DTRs (Distribution Transformers)
  • Erection of LT lines
  • Rural electrification and consumer connection work
  • Role: Executed field-level electrical installation and testing activities in accordance with government electrification norms.
  • 2. 11/0.433KV Indoor Substation – NISM, Patalganga, Panvel (CPWD Mumbai Division)
  • Client: National Institute of Securities Markets
  • Scope: Full installation and commissioning of indoor substation infrastructure.
  • 3. 11/0.433KV Indoor Substation – ICAR-NIASM, Baramati (CPWD Pune Division)
  • Client: National Institute of Abiotic Stress Management (NIASM)
  • Scope: Full installation and commissioning of indoor substation infrastructure.
  • Key Technical Involvements & Responsibilities:
  • Installation, testing, and commissioning of:
  • Power Transformers: 1x1500 KVA & 2x1000 KVA
  • Ring Main Unit (RMU) Panels: SF6 Circuit Breakers (11KV/33KV)
  • HT & LT Panels, Feeder Panels, and APFC Panels
  • HT & LT Underground XLPE Cabling with Termination Kits
  • Sandwich Bus Trunking (SBP): 630A to 5000A, IP40 & IP67 (Make: Zucchini, Legends)
  • Internal Substation Wiring, Light Fixtures (Indoor/Outdoor), and Conduiting
  • Street Lighting System with Digital Timer Switches and Clocks
  • Diesel Generator Sets: 250kVA, 200kVA, 100kVA, 50kVA with AMF Panels
  • Battery Bank Systems
  • Coordinated with CPWD engineers, vendors, and on-site technicians to ensure timely and quality execution.
  • Highly motivated to work beyond regular hours when required, with a strong commitment to project deadlines and quality standards.
  • Ensured compliance with CPWD specifications, safety protocols, and client requirements.

Technical Support Engineer

M/S HCL Services Ltd.
Pondicherry
07.2013 - 02.2014
  • Provided technical support and troubleshooting for hardware and software issues.
  • Handled installation, maintenance, and configuration of IT systems and peripherals.
  • Assisted end-users in resolving system-related problems and ensured minimal downtime.
  • Maintained service logs, documentation, and coordinated with higher-level support teams for escalations.

Education

B.Tech - Electrical Engineering

Baba Institute of Technology & Sciences
Visakhapatnam
05-2013

Skills

  • Design & Tools: AutoCAD
  • Office Suite: MS Word, Excel, PowerPoint
  • ERP/Software: Lighthouse ERP, SAP, Primavera P6
  • Others: Internet research, Documentation, BOQ preparation

CORE KEY STRENGTHS ACROSS ASSIGNMENTS

  • Planning, execution and finalization electrical projects, adhering to scope and quality standards.
  • Project monitoring, scheduling, coordination interaction in project activities and preparation of project BOQ & inventory.
  • Coordination with client and Project management for GTP drawing review & approval.
  • Checking & verifying a Material stock inventory register weekly ensuring store overall flow of goods within warehouse after issue goods to subcontractor are accurately recorded.
  • Preparing client running bills along with all supporting documents.
  • Checking & verification of Sub-Contractor billing as per site physical progress & Reconciliation of material and ensuring that all work is accurately measurement and quantities in the billing.
  • Preparing Project chairing weekly & Monthly progress review meeting to highlight on the critical project milestones, areas and immediate actions.
  • Guide discipline engineers on close monitoring of progress as per detailed schedule.
  • Maintaining project scope control and budget analysis to ensure the project stays on track and meets its goals.
  • Project Material Management & Reconciliation.
  • Preparing management information system reports.
  • Preparing and maintaining a hindrance recorded in the register, highlighting significant delays report have affected the project timeline, review the contract terms regarding time extensions
  • Preparing & maintaining proper project documentation and reports for a project closure
  • Develop policies to ensure safety of an environment during execution of a project.
  • Good liaising & dealing with Client, Consultant, Contractors & Capability to Handle the Tasks Assigned.
  • Always Creating Friendly & Comfortable Professional Environment for all employees in the Team & Organizing Time to Time Trainings program for up-gradation & awareness of Latest Technology & Norms.

PERSONAL INFORMATION

  • Father' Name: Mr. Kedar Sahu
  • Date of Birth: 1990-04-16
  • Marital Status: Married
  • References: Available on Request
  • Address: Shymashreepally Naihati, West Bangel, N24Pgs, 743165
  • Salary Drawn: Rs.6 Lacs 60 Thousand per Annum
  • Preferred Location: Any Location

Disclaimer

I hereby declare that the information furnished above is true to the best of my knowledge and belief. 

Place: Kolkata 

02-Jan-2025 

PAVAN KUMAR

Timeline

Deputy Project Manager – Electrical Execution

M/S Techno Power Enterprises Pvt Ltd
11.2020 - Current

Planning Engineer – Execution

M/S Lanarsy Infra Ltd
02.2019 - 06.2020

Site Electrical Engineer

M/S Power and Instrumentation (Gujarat) Limited
03.2014 - 01.2019

Technical Support Engineer

M/S HCL Services Ltd.
07.2013 - 02.2014

B.Tech - Electrical Engineering

Baba Institute of Technology & Sciences
Pavan Kumar