Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Pavan Muddana

Summary

Over 8 plus years of SAP, working mainly in the areas of Product Lifecycle Management and Supply Chain Management, which include 12 End - to-End full life-cycle implementations (including 1 roll-outs) and some support projects. Experience has been mainly applied within the Manufacturing, ,Pharmaceutical and Food Industries. Demand management: Creating PIR and Planning strategies-10,11,20,21,25,40,50,52 MRP: MRP types, carrying out planning run

Overview

8
8
years of professional experience
1
1
Certification

Work History

  • Over 8 plus years of SAP, working mainly in the areas of Product Lifecycle Management and Supply Chain Management, which include 12 End - to-End full life-cycle implementations (including 1 roll-outs) and some support projects
  • Experience has been mainly applied within the Manufacturing, ,Pharmaceutical and Food Industries
  • Demand management: Creating PIR and Planning strategies-10,11,20,21,25,40,50,52 MRP: MRP types, carrying out planning run & Stock requirement list
  • Production Orders: Creating production orders, carrying out material availability, scheduling and releasing production orders, confirming production orders, and handling errors in goods movement
  • Discrete Manufacturing: Master data like Material Master, BOM, Work Centre, Routing, Sales, and operational planning, MRP, planned order to production order using Stock / Requirement list, purchase requisition to Purchase order, Goods receipt through MIGO, Confirmation of the production order
  • Repetitive Manufacturing: Creation of Material Master, BOM, Production Line, Rate Routing, Production Version, and Customizing REM profile, back flush and Product Cost Collector, planned independent requirement, Planning table, Goods receipt, Backflushing
  • Process Manufacturing: Creation of Material Master, BOM, Resource, Master Recipe, material quantity calculation for excipients and AP Production Version, planned independent requirement, Master production schedule, Variant configuration
  • Fashion Management System- PP and Project manufacturing interface such as BOM transfer to the project, WBS-wise MRP run
  • PP with other module integration, Costing, Sales, Material Management, and Warehouse
  • Worked on Mill solutions such as mill orders, Mill cut, and WIP batch during confirmation
  • Batch determination and derivation Quality Management: Requirement gathering, Business Process Mapping, BBP Preparation QM setup Inspection planning for incoming, in-process, final inspection, dispatch, and customer returns inspections QM Master Data – Master Inspection Characteristics, Inspection Methods, Inspection Planning, Codes, Catalogues Sampling schema and sampling procedures Results Recording Fabric rolls four-point check for both Grey and finished fabric and Shade batching for finished fabric roll
  • Quality certificate for customer Quality notification to vendors Material Management: Material Type, Material group, purchasing groups P.O/P
  • R Document types configuring
  • Sub-contacting process Stock transfer process Pre-Sales: Several Demo systems setups were done for different clients for various processes
  • Specialty in setting up a demo system for the Pre-Sales team to demo different clients who require Variant Configuration, Fashion vertical business, and Fabric Production
  • Demos for various end-to-end cycles such as Order-to-Cash, Production and Procure-to-Pay cycles.

Premier Fine Linens
10.2022 - Current
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Production Orders, and Parameters for Order Confirmation Functional Specification for reports, enhancements, and forms Major enhancements include RF for production deceleration (GI, GR & confirmation) conversions Bill cockpit for the sub-contacting employees Fast-react interface with SAP Successfully implemented the QM module with quality planning, inspections, and batch status management Set up QM Master Data such as Code Groups and Selected Sets, Master Inspection Characteristics, and Inspection Plans Prepare user manuals, unit test scripts, and integration test scripts Coordinated and conducted unit testing and integration testing and provided process documentation Showcased the analytical Fiori apps for production and quality control.

Modenik Company,India
12.2021 - Current
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Production Orders, and Parameters for Order Confirmation Number range for the master-planned order and master production order and set up the season and segmentation for the rejected parts and different market products (ECOM & Common) Functional Specification for reports, enhancements, and forms Major enhancements include bundle card creation, stitching confirmation through QR code, and repacking and conversions Bill cockpit for the sub-contacting employees Successfully implemented the QM module with quality planning, inspections, and batch status management Set up QM Master Data such as Code Groups and Selected Sets, Master Inspection Characteristics, and Inspection Plans Prepare user manuals, unit test scripts, and integration test scripts Coordinated and conducted unit testing and integration testing and provided process documentation Cut over activities like legacy upload Post Go-Live Support

W.F.B Baird & Company (India)
08.2016 - Current
  • Deployed into the ongoing project in August 2016 during the realization phase Master data templates Functional Specifications for reports and forms Functional Specification for major enhancement (Fabric Design) Weaving Instruction from fabric Design Setting up of Variant Configuration Setting up of WIP batch process and setup for WIP batch to work with in-process Quality inspection Four Point check for both grey fabric, pre-treated, and finished fabric Mass shade batching for the fabric rolls and update the batch characteristics Automatic Materials creation from fabric design enhancement Sales meet sales order creation screen once it is approved automatic material creation and material creation Yarn Dyeing, weaving, and processing confirmation screen for different order confirmations in a single screen Prepare user manuals, unit test scripts, and integration test scripts Conduct user acceptance testing and sign off the test scripts Cut over activities like legacy upload Post Go-Live support For the Plant in Erode we have done a rollout with the same process

Abbott Healthcare Vietnam
06.2023 - 12.2023
  • Preparation of the global template and BBP documentation Global template preparation for the Pharmaceutical with standard SAP process Business process master list with hierarchy Documentation for each BPML as Business process documentation which consists of the process flow, process steps explanation, Key design decision, cross-functional integration, process variants, and Associated Master data Set up the sandbox based on the BPML and sample master data for the two products taken from the Business Workshop conducted with the business team where we showcased the global template in the system after the system demo we took the process outputs, process variants, parking lot, key design document, and process change impact assessment and recorded the changes required in the global template to include the local requirement with global process owner approval System set-up based on the key design document and BPD system setup based on the current master data Prepare the final version of the business process documentation with local requirements Three-day workshop on the end-to-end process flow demo and then a module-wise demo for each BPD and submitting the final BPD to the business user.

Twenty-First Century Pharmaceuticals Pvt, Ltd.
08.2020 - 11.2021
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates and Functional specifications for reports, enhancements, and forms Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Process Orders, and Parameters for Order Confirmation Batch determination and deviation Material quantity calculation and assay calculation Prepare unit test scripts and integration test scripts Coordinated and conducted unit testing, integration testing, and provided process documentation Cutover activities like legacy upload Post-Go-Live Support

WIPRO-Hydraulic Pvt, Ltd.
12.2019 - 07.2020
  • Responsible for the Requirement gathering, process designing, and BBP documentation for Shop-floor execution which interface of Plan visage and SAP Master Data Templates such as operator master, and reason code Functional Specifications for operator queue for stores, water spider(Fork lifter), machine, quality, and maintenance After the shift ends system will create the master data and production files and an update in the SFTP folder will be outbound to the Plan visage From the Plan visage, the Work center/operator-wise planned orders with start time and end time are inbound to the SAP Interface with Plan visage and SAP and vice-versa Prepare unit test scripts and integration test scripts Coordinated and conducted unit testing, integration testing and provided process documentation Cutover activities like master data upload Post-Go-Live Support

Armes Maini Storage Systems
06.2019 - 01.2020
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates Functional Specification for forms and interface Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Production Orders, and Parameters for Order Confirmation BOM transfer to the project Material and BOM through PDM, where PDM will send the CVS file in the SFTP folder SAP will read the file and update the custom table, and then the custom program will create the material and BOM Successfully implemented the QM module with quality planning, inspections, and batch status management Set up QM Master Data such as Code Groups and Selected Sets, Master Inspection Characteristics, and Inspection Plans Prepare user manuals, unit test scripts, and integration test scripts Coordinated and conducted unit testing and integration testing and provided process documentation Cut over activities like legacy upload Post Go-Live Support

Evolv Clothing Company, India
07.2018 - 05.2019
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates Functional Specification for reports, enhancements, and forms Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Production Orders, and Parameters for Order Confirmation Preparation of functional specifications for bundle process, stitching, and packing production confirmation through scanning Successfully implemented the QM module with quality planning, inspections, and batch status management Set up QM Master Data such as Code Groups and Selected Sets, Master Inspection Characteristics, and Inspection Plans Triggered Inspections for Customer Returns and Recurring Inspections Four Points for fabric purchase if the grade is F then fabric rolls are returned to the vendor Shade Batching for the fabric and update in batch characteristics Prepare user manuals, unit test scripts, and integration test scripts Coordinated and conducted unit testing and integration testing and provided process documentation Cut over activities like legacy upload Post Go-Live Support

Duroflex, India
10.2017 - 07.2018
  • Responsible for the Requirement gathering, process designing, and BBP documentation Master Data Templates Functional Specification for reports and forms Setting up for Variant Configuration for custom mattresses Configure Shop Floor Control data order type, Order type dependent parameters, Production Scheduling Profile, Scheduling parameters for Production Orders, and Parameters for Order Confirmation Mill cut for foam cutting and Mill orders for combining different grade foam cutting Mass Goods Receipts for Foam Block production goods receipts with length, width, colour, and Grade Yield report for foam, Mass production variance report Prepare user manuals, unit test scripts, and integration test scripts Coordinated and conducted unit testing and integration testing and provided process documentation Cut over activities like legacy upload Post Go-Live Support

Skandia Windows Fashion, USA
12.2015 - 10.2017
  • Deployed into the ongoing project in December 2015 Responsible for Configurations Worked on the creation of PP Master Data such as BOM, Routing, and work centers, in a discrete manufacturing environment Setting up for Variant Configuration Responsible for the Business Process Mapping and configuring PP and MM modules Functional specification for on-the-fly BOM and cutting process If Any components in sales BOM is not available automatically the sales order line item should be put on Backorder Hold Sub-contacting, Stock transfer, assert, and service purchase Coordinated and conducted unit testing and integration testing and provided process documentation Prepare unit test scripts and integration test scripts Conduct user acceptance testing and sign off the test scripts Cut over activities like legacy upload Post Go-Live Support

AMS (Ace Manufacturing Systems)
03.2016 - 07.2016
  • Part of the requirement gathering Supported the senior consultant in documentation and system set-up Done the variant configuration POC for one vertical machining center.

Education

Skills

  • SAP ERP : ECC60 EHP 7, EHP8
  • S/4HANA : S/4 HANA 1511,1610,1709,1809,1909,2020
  • SAP FVB : S/4HANA 1809,2110

Certification

SAP S/4 Hana Cloud Manufacturing-Manufacturing Implementation

Timeline

Abbott Healthcare Vietnam
06.2023 - 12.2023

Premier Fine Linens
10.2022 - Current

Modenik Company,India
12.2021 - Current

Twenty-First Century Pharmaceuticals Pvt, Ltd.
08.2020 - 11.2021

WIPRO-Hydraulic Pvt, Ltd.
12.2019 - 07.2020

Armes Maini Storage Systems
06.2019 - 01.2020

Evolv Clothing Company, India
07.2018 - 05.2019

Duroflex, India
10.2017 - 07.2018

W.F.B Baird & Company (India)
08.2016 - Current

AMS (Ace Manufacturing Systems)
03.2016 - 07.2016

Skandia Windows Fashion, USA
12.2015 - 10.2017

Pavan Muddana