Summary
Overview
Work History
Education
Skills
Timeline
Maintenance carried out on Cessna 172,152 Aircraft
Trainings
Achievements
Fathername
Languagesknown
Hobbies
Disclaimer
Maintenance carried out on Cessna 172,152 Aircraft
Trainings
Achievements
Fathername
Languagesknown
Hobbies
Disclaimer
Generic
Peervali Shaik

Peervali Shaik

AIRCRAFT MAINTENANCE ENGINEERING TECHNICIAN
D/no-2-7A Muppalla village sattenapalli taluk

Summary

An enthusiastic personnel with motivated and leadership skills and focused on honoring company ethics and preserving confidentiality and grow along with the organization which provides opportunities for individuals to gain knowledge and achieve higher position.

Overview

6
6
years of professional experience
134
134
years of post-secondary education

Work History

Senior Aircraft Maintenance Technician

GMR AERO TECHNIC LIMITED
11.2018 - Current
  • Carried out maintenance activity on electrical and instrument systems on Airbus A320 fitted with CFM 56-5B, IAE V2500
  • Carried out maintenance activity on electrical and instrument systems on Boeing 737 NG fitted with CFM 56-7B
  • Carried out maintenance activity on electrical and instrument systems on ATR 72-212A fitted with PW 120,127M&F
  • Carried out functional tests, operational test, trouble shooting and modifications on various systems
  • Carried out ELSD modification in A320 Aircraft
  • Carried out ADSB modification in A320 Aircraft
  • Carried out ADSB modification in ATR 42-600 Aircraft
  • Carried out AIR CONDITIONING ENVIRONMENTAL CONTROL SYSTEM modification in ATR 72-600 Aircraft
  • Carried out C checks, redelivery end of lease checks
  • Modification in which addition, deletion, deactivation of wiring and cockpit panels
  • Recently Carried out IFE installation in Boeing 737 Max brand new aircraft

Education

10th class -

Hindu School
Andhra Pradesh, India

10+2 -

Vivekananda Junior Collage
Andhra Pradesh, India

Aircraft Maintenance Engineering -

FLYTECH AVIATION ACADEMY
Hyderabad, Telangana India

Skills

Good interpersonal communication

Timeline

Senior Aircraft Maintenance Technician

GMR AERO TECHNIC LIMITED
11.2018 - Current

10th class -

Hindu School

10+2 -

Vivekananda Junior Collage

Aircraft Maintenance Engineering -

FLYTECH AVIATION ACADEMY

Maintenance carried out on Cessna 172,152 Aircraft

  • Daily inspection schedule
  • 50, 100, 200 hours inspection schedule
  • Component replacement and Instrument replacement
  • Additionally ground run exposure, towing & marshalling
  • Completed on job training on HS-125 Aircraft fitted with ROLLS ROYCE viper MK-522 Engine CESSNA 152 fitted with LYCOMING 0-235 N2C/L2C Engines CESSNA 172S Aircraft fitted with LYCOMING 10-360L2A Engine.

Trainings

Human Factors(HF)

Safety Management System(SMS).

Fuel Tank Safety(FTS).

HAZMAT (Hazardous and waste material).

EWIS Level -1&2.


Achievements

Appreciated for excellent work carried out for IFE installation on Brand new Boeing 737 Max (A6-FKN)(A6-FEK)(A6-FEV) Aircrafts.

Appreciated for excellent work carried out for E-6 Rack full preparation before given time on Brand new Boeing 737 Max (A6-FKN)(A6-FEK)(A6-FEV) Aircrafts.


Fathername

Shaik Silaruddin Basha

Languagesknown

  • Hindi
  • English
  • Telugu
  • Urdu

Hobbies

  • Playing cricket
  • Video games
  • Fishing

Disclaimer

I hereby confirm that the information provided above is accurate and true to the best of my knowledge.

Maintenance carried out on Cessna 172,152 Aircraft

  • Daily inspection schedule
  • 50, 100, 200 hours inspection schedule
  • Component replacement and Instrument replacement
  • Additionally ground run exposure, towing & marshalling
  • Completed on job training on HS-125 Aircraft fitted with ROLLS ROYCE viper MK-522 Engine CESSNA 152 fitted with LYCOMING 0-235 N2C/L2C Engines CESSNA 172S Aircraft fitted with LYCOMING 10-360L2A Engine.

Trainings

Human Factors(HF)

Safety Management System(SMS).

Fuel Tank Safety(FTS).

HAZMAT (Hazardous and waste material).

EWIS Level -1&2.


Achievements

Appreciated for excellent work carried out for IFE installation on Brand new Boeing 737 Max (A6-FKN)(A6-FEK)(A6-FEV) Aircrafts.

Appreciated for excellent work carried out for E-6 Rack full preparation before given time on Brand new Boeing 737 Max (A6-FKN)(A6-FEK)(A6-FEV) Aircrafts.


Fathername

Shaik Silaruddin Basha

Languagesknown

  • Hindi
  • English
  • Telugu
  • Urdu

Hobbies

  • Playing cricket
  • Video games
  • Fishing

Disclaimer

I hereby confirm that the information provided above is accurate and true to the best of my knowledge.
Peervali ShaikAIRCRAFT MAINTENANCE ENGINEERING TECHNICIAN