Summary

Dynamic construction manager with extensive experience at M/s PNC INFRATECH LTD., excelling in flexible planning and quality assurance. Proven track record in leading teams to successfully execute complex projects, ensuring safety and security while optimizing material procurement. Committed to delivering high-quality results in challenging environments.

Overview

20
20
years of professional experience

Work History

Manager (RE. Wall & Str.)

M/s PNC INFRATECH LTD.
Mathura
12.2023 - Current
  • Company Overview: Four Laning of NH 530B from Mathura Bypass (Start) (Existing km 266.000 of SH 33/Design km 0.000) to Gaju village (End) (Design Km 32.982) (Design Length=32.982 km) in the State of Uttar Pradesh on HAM mode (PACKAGE 1-B).
  • Construction of Retaining Earth Wall, Median Drain, Outer Drain Pipe Drain with cradle, Pre Cast Crash Barrier Casting & Erection, Pre Cast Box Culvert (Casting & Erection), Pipe Culvert, RCC Boundary Wall, Pile Foundation, MNB & VUP etc.
  • CLIENT: National Highways Authority of India.
  • Consultant: Frischmann Prabhu India Project Management Consultancy services Pvt Ltd.
  • Four Laning of NH 530B from Mathura Bypass (Start) (Existing km 266.000 of SH 33/Design km 0.000) to Gaju village (End) (Design Km 32.982) (Design Length=32.982 km) in the State of Uttar Pradesh on HAM mode (PACKAGE 1-B).

Assistant Manager (RE. Wall & Str.)

M/s PNC INFRATECH LTD.
UP
03.2021 - 12.2023
  • Company Overview: Under Bharatmala Pariyojna for Unnao – Lalganj Section of New NH-31 (Old NH 232A) On Hybrid Annuity Mode in the State of UP & Ch. Km 0.000 to Km 70.00
  • Construction of Retaining Earth Wall, Median Drain, Outer Drain Pipe Drain with cradle, Pre Cast Crash Barrier Casting & Erection, Pre Cast Box Culvert (Casting & Erection), Pipe Culvert, RCC Boundary Wall, Pile Foundation, MNB & VUP etc.
  • CLIENT: National Highways Authority of India.
  • Consultant: M/S Lion Engineering Consultants in Association With M/s Sugam Technocrats Pvt.Ltd.
  • Under Bharatmala Pariyojna for Unnao – Lalganj Section of New NH-31 (Old NH 232A) On Hybrid Annuity Mode in the State of UP & Ch. Km 0.000 to Km 70.00

Assistant Manager (RE. Wall)

M/s PNC INFRATECH LTD.
UP
05.2018 - 03.2021
  • Company Overview: 4-Laning of Varanasi Gorakhpur Section of NH-29 from 12.000 (Design Chainage Km. 12.010) to Km 88.000 (Design Ch.KM (84.160) [Package-II from Sandah to Birnon) in the State of Uttar Pradesh under NHDP PHASE-IV on EPC mode.
  • Construction of Retaining Earth Wall, Median Drain, Pre Cast Crash Barrier Casting & Erection etc.
  • CLIENT: National Highways Authority of India.
  • Consultant: MSV INTERNATIONAL Inc. in association with MSPARK Futuristic & Associates.
  • 4-Laning of Varanasi Gorakhpur Section of NH-29 from 12.000 (Design Chainage Km. 12.010) to Km 88.000 (Design Ch.KM (84.160) [Package-II from Sandah to Birnon) in the State of Uttar Pradesh under NHDP PHASE-IV on EPC mode.

Asst. Manager (RE. Wall)

M/s APCO INFRA.PVT.LTD.
06.2017 - 05.2018
  • Company Overview: Varanasi by pass Ring Road Project. Package -1
  • Construction of Retaining Earth Wall, Pre Cast Crash Barrier Casting & Erection Box Culvert PSC Beam Casting etc.
  • CLIENT: National Highways Authority of India.
  • Consultant: Yongma Engineering Co. LTD.
  • Varanasi by pass Ring Road Project. Package -1

Asst. Manager (Highway)

M/s GAMMON INDIA LIMITED
03.2012 - 05.2017
  • Construction of Retaining Earth Wall, Rcc Drain, Curb, Rcc Median Crash Barrier and Underpass & other structure from Initial stage to final stage.
  • Earthwork for New Carriageway & Service Road as per MORTH & IS Codes.
  • Preparation of Drawing according to site condition.
  • Responsible for all testing related to execution of Road like MDD, FDD etc.
  • Responsible for approval of material like Concrete, C&G, Emb, Sub-grade, GSB, WMM, DBM, BC etc. as per site requirement for achieving target.
  • Responsible For all Documentation Maintaining as per ISO system or Test plan.
  • Responsible for calculating of Quantity of any complicated section for the purpose of entering Measurement Book of Contractor.
  • Responsible for executing the work in the site by maximum utilization of resources in minimum time as per target by the best way of management.
  • Rate Analysis of Extra Item of the project & finalization of Sub-contractor.
  • CLIENT: National Highways Authority of India.
  • Consultant: Feedback Ventures Private Limited.

Engineer (Highway)

M/s GAMMON INDIA LIMITED
04.2008 - 03.2012
  • Company Overview: Kosi Bridge Project, four lane bridge across river Kosi, Nirmali, Supaul (Bihar) NH-57.
  • A: working as a site engineer on NH-57, right now soil filing & checking FDD also.
  • B: Box culvert also done in, between road work.
  • C: Subgrade, GSB, WMM, DBM, BC also done.
  • D: Filter media on embankment slope.
  • E: Boulder pitching in slope & apron with wire crates.
  • F: Turfing work in slope.
  • Kosi Bridge Project, four lane bridge across river Kosi, Nirmali, Supaul (Bihar) NH-57.

Site Engineer

Astha Industry Pvt. Ltd.
Raebareli
04.2007 - 12.2007
  • Work in Construction and Earth work Of Solvent Plant (400 ton), Boiler, Office building, Electrical Building, go down, Labor Colony, weigh bridge, Diesel Tank, Hexane Tank, security office, Rain Water Harvesting etc.

Field Engineer

Tahal Consulting, Engineers Ltd.
Lucknow
12.2004 - 02.2007
  • Company Overview: Tahal Group Israel.
  • Redesigning of Canals under U.P. Water sector Restructuring Project from Jaunpur Branch & Haidargarh Branch, other branch, Distributary's, minor under of Sarada Sahayak Feeder Canal.
  • Tahal Group Israel.

Education

MBA - Construction Management

IIBMS
Mumbai, India
01.2009

Three-year Diploma - civil engineering Related

Chandauli Polytechnic
Chandauli, UP, India
01.2003

Skills

  • Flexible construction planning
  • Quick learning
  • Quality assurance
  • Material procurement
  • Team leadership
  • Problem solving
  • Multitasking
  • Safety and security

Hobbies and Interests

  • Reading Books
  • Listening Music

Languages

  • English
  • Hindi

Personal Information

  • Total Experience: 18 Years
  • Expected Salary: Negotiable As per company policy
  • Date of Birth: 02/15/84
  • Gender: Male
  • Marital Status: Married

Timeline

Manager (RE. Wall & Str.)

M/s PNC INFRATECH LTD.
12.2023 - Current

Assistant Manager (RE. Wall & Str.)

M/s PNC INFRATECH LTD.
03.2021 - 12.2023

Assistant Manager (RE. Wall)

M/s PNC INFRATECH LTD.
05.2018 - 03.2021

Asst. Manager (RE. Wall)

M/s APCO INFRA.PVT.LTD.
06.2017 - 05.2018

Asst. Manager (Highway)

M/s GAMMON INDIA LIMITED
03.2012 - 05.2017

Engineer (Highway)

M/s GAMMON INDIA LIMITED
04.2008 - 03.2012

Site Engineer

Astha Industry Pvt. Ltd.
04.2007 - 12.2007

Field Engineer

Tahal Consulting, Engineers Ltd.
12.2004 - 02.2007

MBA - Construction Management

IIBMS

Three-year Diploma - civil engineering Related

Chandauli Polytechnic