Surya Pradeep Reddy CIVIL ENGINEER PROFESSIONAL Synopsis Civil Engineering Professional with Over 6
Years of Experience in Executive of Construction Sites. Commercial awareness of Understanding of how the actions can affect profitability of a project team problem solving and an eye for detail. Management skills and Resolving any unexpected technical difficulties and other problems that may rise.
Project civil Engineer,GPS RENEWABLES LTD,HYDERABAD
JANUARY 2021-PRESENT
Project-Biogas –BIO CNG 550 TPD SSO based Bio-CNG plant
Project Value-500 Crores Rupees
• .Coordinating with the design team to resolve the design issues as per existing site conditions
• Managing The Subcontractors & Assigning the Work Front(work order), indenting on assessing their Machinery, Man power & Productivity, Preparing the Subcontractors bills
• .Tracking the daily Progress & finding the bottlenecks to ensure the project running as per plan.
Senior Civil Engineer, RSM ASTUTE CONSULTING LTD, Karnataka
DECEMBER 2019 – DECMBER 2021
Project-Coke Oven 5, JSW Steel Plant Ltd, Karnataka
Consultant-SinoSteel,China Project Value-3000 CroresRupees
• Construction,EngineeringandProcurementofChimney165Meter(2Nos)andBattery A,B,C,D(4Nos),CoolingTower,CoalSilos,Substationbuilding,Controlbuilding, Chemical storage building, Blower workshops, Pipe rack foundations, Gas line foundations, Compressor shelters, Pump shelters, Quenching tower, Coal junction house,Rawwatertreatmentplant.ETP(ElectroTarPrecipitation).PGC(PrimaryGas Cooler), CDQ (Coke Dry QuenchingStation)
• Excavation, Footing, Bunkers and other RCC StructuralWorks.
• Site Execution as per approved drawing and Adopt all relevant requirements around issues such as building permits, environmental regulations, and safety on all workassignments.
• Ensure thata project runs smoothly and that the structure is completed on time and within budget.
• Resolves design and development problems.
• Scrutinizing Contractors and Sub Contractors Bills, Preparation of Work Orders, Indents and deriving Quantities of the approved final drawings, Planning and Scheduling of Work, Monthly Work Plan is prepared and makes sure that the project is running as perplan.
• Implementation of RFC drawing for thesite.
• Monitoring Work,Quality and Projectduration&Cost
• Executing and try to achieve the work with respect to monthly target.
• Tracked Labourwork,material consumption and sub-contractors work at construction site.
• to avoid unauthorized execution ofwork
• Assisted with Client for efficient workprogress and controlling the quality.
• Studying drawings and raising technical query wherever necessary.