Design and Development of MCB Assembly Machine
Client: Fox Solutions, Nashik
Software: Solid Edge 2023, Ansys
Key Deliverables:
- High Speed Component assembly machine for Electrical MCB.
- Its Key MSP is an Cycle time of about 1.3 Sec per MCB and runs 24x7.
- Accuracy designed up to 60 Micron.
- Most reliable Machine with minimum breakdown and Easy for Maintenance .
- Suitable for many product family with configuration.
- Easy to operate and able to depute minimum skilled operator.
- Handle project team with best in class project scheduling and planning
- Done Design Calculations and simulation with test Certificate.
- Prototype testing and modification completed within time frame
- Manufactured Setting Master, Set Dowels, Fixtures and tools to minimize downtime and any Mechanical component can replace within Max. 22 Minutes.
Design and Development Medical Product Testing Machine
Client: Fox Solutions, Nashik
Software: Solid Edge 2020, Ansys
Key Deliverables:
- Design Pouch Leak testing Machine for saline liquid pouches and bottles.
- Facility to segregate faulty pouches safely with minimum damage.
- High Speed and accurate leak testing machine.
- Can able to detect leak in cold component even dewdrops on it.
- All Material used is food and Medical grade.
- Its easy for cleaning and Sterilization as used in Medical Industry.
- Done FMEA and risk analysis to detect possible failures and provide measures.
- Improved reliability and easy for maintenance in clean room
- Provided Common screw size, Dowels, Color marks and part No on part for easy Maintenance
- Implemented Bar code system for easy maintenance by scanning bar code to play step-by-step Maintenance video.
Reliability improvement of Airport Baggage Handling System
Client: Fox Solutions, Nashik
Software: Solid Edge 2019, Ansys
Key Deliverables:
- Improvement in reliability of previously designed Airport baggage handling system.
- Most serious component if fail between jumbo flight arrival then complex task to shift on different system.
- Identify component failures and set RPN,
- Developed new inspection procedures to ensure reliability of equipment as shift work on site.
- Reviewed and updated preventive maintenance plans for conveyors and carousel.
- Conducted root cause analysis on downtime events.
- Analyzed data from vibration analysis program and shift detection sensors to identify potential problems with rotating machinery like belt drum.
- Design Changes for improving life of component like weld bolt instead of stud weld
- Read worker logs, product processing sheets or specification sheets to verify adherence to specifications and maintenance schedules
Design & Development of Reliability Test fixture for Weighing Scale Medical Device testing
Client: Capgemini, Pune
Software: Solidworks 2017
Key Deliverables:
- Motion Simulation in Solidworks
- Design of Scalable Reliability testing fixture for Medical grade weighing scale
- Its have an calibrated weight put simulate patient and kept repeatedly on weighing scale like patient standing and also with wheel chair. ramp up ramp down.
- Check for Load cell accuracy after number of operations,
- check ramp hinge and bending in ramp after number of operations
- Motor, belt, pulley, weight Selection for fixture
- Hand calculation for load and effort
- All measuring device attached got calibrated with NABL certified labs
- Regular Maintenance for Testing fixture
- Facility provided for Accelerated Testing
VA VE and Reliability test of weight monitoring Units
Client: Capgemini, Pune
Software: Solidworks 2016
Key Deliverables:
- Write Test protocol for Validation, and also for reliability test
- Conducted test Chemical testing effect on material when cleaning with harsh chemical like Isopropyl alcohol
- Conducted test for reliability improvement by putting fatigue load repeatedly for 5000 times and tested accuracy of weight.
- Conducted test for patient safety to avoid topple of scale when patient standing on It.
- Conducted test on thermal printer for print quality in different weather condition
- Conducted Battery replacement time calculation and improvement in design
- conducted butten pressing test and determines life of buttons
- conducted pull force test on weighing scale
- all test protocol documented and maintained.
Test Lab Setup for New Client
Client: Capgemini, Pune
Software: AutoCad
Key Deliverables:
- The new client need an advance and state of Art Lab for Various test and Experiments
- Gather the need and types of work to be carried in Lab
- Identified the device and Equipment requirement
- Select the best and comman used brands for Equipment and Tools
- Prepare the plan in AutoCad for entire Lab
- Identified Space, Power and Electrical requirements
- Put PO for Equipment and Tools Purchases
- Setup the SOP for use of equipments
- Maintain the records of test and equipment uses
- Set up an Process Approval Flow Chart
- Periodically Test the Measuring devices for Accuracy at Certified Labs
Development of Latches for Ventilator System of Medical Devices
Client: Capgemini, Pune
Software: Solidworks 2013
Key Deliverables:
- Study and Identification Principle & Importance of Latch
- Calculation of Loads, Time, Panic condition operations, Accessibility, Safety, Material Selection
- Design & Drafting of Latch Assembly
- Tolerance Stack up Analysis
- Testing for Exact De-clamping force and also compare with CAE
- Prototype building & Testing as per Norms
- Cyclic Fatigue Testing, DFMA, Accelerated Life cycle Testing etc.
Kinematics of Circuit Breaker for Medium Voltage Application
Client: Crompton Greaves Ltd, Nashik
Software: Autodesk Inventor, Ansys, Elecnet
Key Deliverables:
- Benchmarking of current leaders in Medium voltage switchgear,
- Calculation for Available Kinematics like Spring energy availability and yield limit of mechanism
- Kinematic Calculation for new development to increase load of current mechanism from 800 Kg to 1200 Kg.
- Modeling & Detailing, Material Selection & Manufacturing for Prototyping. Testing & Validation
Novel Design of Cradle assembly for Breaker Auto Rackin Rackout
Client: Crompton Greaves Ltd, Nashik
Key Deliverables:
- Benchmarking of current Cradles, Resizing & Recalculation of Load
- Motor Selection as per new load, Easy Lock & Release, Lead Nut wear prevention,
- Outsource to different country vendor for cheap manufacturing.
Novel Design of Shutter Assembly as Safety Interlock for Medium Voltage Switchgears
Client: Crompton Greaves Ltd, Nashik
Key Deliverables:
- Benchmarking of current interlock, Study of Available Shutter Problems.
- New Two Side actuation with less effort, Simple Locking,
- Use of Oil free bush for long maintenance schedule
- Non defetable mechanism with sensors and logic
- Ensure maximum human safety
Design of Test Rig for High Accuracy Pharma pump Projects
Client: Hi-Tech Gears/ Emerson Innovation Center, Pune
Software: Solidworks 2011,
Duration: 4 Months
Key Deliverables:
- Study and workout for pump working and need of testing
- Concept design of Test Rig with Facility of Environmental condition changer, Harsh Chemical sustainability, Temperature sustainability, vibration simulation etc in one test setup.
- Added Facility and adjusting facility for Electronic Sensors, PCB’s, Optical turbidity sensors, Reeds, Relays.
- Whole Design and Drafting with ASME Y14.5, 2009 Std in Solidworks, Drawing SAP Entry for selected concept
- Mechanical Motion simulation for customer end and inspector end understanding.
- Manufacturing, QA at vendor site, Report preparation, BOM Preparation etc
- Validating and actual test monitoring at Govt. approved Test Lab Pune.
Design & Testing of Chromatography & Positioners Projects
Client: Hi-Tech Gears/ Emerson Innovation Center, Pune
Software: Solidworks 2010,
Duration: 8 Months
Key Deliverables:
- Performing Optimisation for Design, Cost Reduction by implementing new Design changes, Design & Modeling of Notching Machine with Calculations
- Detailing for Manufacturing, Perform Test on Prototypes
Drafting of Rail Coach Welding Fixture
Client: Mechatrix/ TAL, Pune India
Software: Solid Edge ST
Duration: 3 Months
Key Deliverables:
- Done Detailing with ASME 14.5Y Standard and as per Company standard for all 3D component already modelled in SolidEdge.
- Quality Checking done for all drawings
- BOM Creation and separation with SAP code registration
Modeling & Drafting of Aerospace Tooling of Helicopter
Client: Mechatrix/ TAL, Pune India.
Software: CATIA V5R19, AutoCad 2008
Duration: 3 Months
Key Deliverables:
- Aircraft riveting fixture modelling for selected section with position from reference
- Modelling and verifying with CATIA and Drafting in Catia then convert in Autocad and adjust Layers
Design & Drafting of Base Structure for Exhaust Mufflers Robotic Welding
Client: Mechatrix/ TAL, Pune India.
Software: Catia V5 R19
Duration: 15 Days
Key Deliverables:
- Study of whole Component, Calculation of Load, Modeling Base Frame,
- Drafting detailing with GD&T.