Summary
Overview
Work History
Education
Skills
Additional Information
Personal Information
Timeline
Generic
Prasenjit Gupta

Prasenjit Gupta

Tool Room Head
Noida

Summary

Experienced Plant Manager adept at improving output, maximizing quality and boosting employee satisfaction with hands-on management style. Recognized as an effective personality in the field of TOOL ROOM ENGINEERING handling Senior level assignments in New product development as well as Development of moulds & dies for an organization of repute. Successful manufacturing management career spanning 26 years.

Overview

26
26
years of professional experience
3997
3997
years of post-secondary education

Work History

DEPUTY PLANT HEAD - SUBROS TOOL ENGINEERING CENTRE

SUBROS LTD.
07.2006 - Current
  • Complete Project Execution as a Project Manager
  • Responsible for Overall PDC and Injection Mold Development , Tool Billing and Tool Handover.
  • Increased productivity, optimizing labor allocation, and scheduling across multiple shifts.
  • Completion of all projects as per schedule within 3 trials and below budgeted cost by at least 10%
  • Reduced downtime by establishing a preventative maintenance program for all equipment.
  • Performing strategic sourcing analysis keeping note of internal constrains, external risks and cost effectiveness
  • Guiding and leading a team of 45 members of Engineer to Senior Manager grade
  • Implemented lean manufacturing techniques to eliminate waste, enhance workflow, and improve quality control.
  • Expediting the delivery time thru Concurrent engineering and regular vendor follow up
  • Fulfilling the relevant Requirements for TS 16949
  • Planning NPD processes to ensure that the components meets on time delivery as per NPD schedule and PQCDSME goals
  • Authorized Member in signing-off for QACM of tools .
  • Collaborated with technical and administrative teams to develop and implement successful corrective plans.
  • Provided direction and leadership to all levels of employees and managers.
  • Managed direction and planning for plant with focus on optimization of daily functions, exceeding customer expectations, and achieving KPIs.
  • Implemented useful inventory management and tracking systems to reduce costs and improve operations.
  • Strengthened relationships with key suppliers, negotiating favorable contracts that reduced costs while maintaining high-quality materials.
  • Reduced costs by eliminating materials waste and unnecessary labor hours.
  • Identified and implemented viable strategies for continuous improvement.
  • Evaluated employee performance and provided feedback and training as needed.
  • Implemented quality control system to review products against technical specifications and corporate standards.
  • Achieved operational excellence through rigorous focus on best practices, data-driven decision making, and employee engagement.

Leader

LIFELONG INDIA LTD.
12.2005 - 07.2006
  • Guiding and leading a team of five designers and 4 manufacturing person for plastic injection molds Development
  • Final design review of molds ranging from 10gms to 2.5Kgs for customers like GENERAL MOTORS, ARVIN MERITOR, HERO HONDA, HONDA INDIA, MARUTI INDIA, before releasing to shop floor
  • Discussing at customer end for type of tool life of tool and process maturation sheet
  • Project planning and tool development till T3 trial
  • Final hand over of tools by doing QACM after component approval by SQA
  • Trouble shooting related to tools during production
  • Responsible for Overall Tool Maintenance and mitigation planning

Executive (Development and Manufacturing)

MOTHERSON SUMISYSTEMS AND HAG TOOLINGS LTD.
09.2003 - 10.2005
  • Responsible for Tool Assembly & Maintenance for smooth running of molds during Production
  • Managing activities of Part Development Section thru feasibility study for manufacturing
  • Responsibility of handling critical components like mirror housings, ducts, fuel-cover ducts and Louvers
  • Specialization in handling main wiring harness components (connector moulds)
  • Overseeing design and feasibility review for manufacturing purposes
  • Planning procedures for meeting deadlines of products delivery
  • Negotiating costs with vendors for Developing Tools from India and Germany for local production
  • Interacting directly with the European customers for new products, tools and queries (Trodat, Ventrex, Woco, Knapp logistics, Ford US, JCI, Siemens, Daimler-Chrysler)
  • Troubleshooting during manufacturing, assembly and trials
  • Preparing and finalizing quotations for plastic molds
  • Individually handled a set of 23 components in DEC 2004 for WOCO MOTHERSON and VENTREX with a team of 4 engineers right from first assembly of molds to the final approval of all components with regular interaction with the customers
  • Worked as a team member for successfully executing the project of LOUVER ASSEMBLY of MARUTI

Senior Engineer (Design and development)

TIMEX WATCHES Ltd.
07.2001 - 08.2003
  • Tool design on UG V-17 for plastic components (NYLON, LDPE, DELRIN, ABS, ETC.) for customers like LK DENMARK, LK INDIA, CONTECH DEVICES, SCHNIEDER ELECTRICALS, BAUSCH & LOMB, MARUTI, TELEMECHANIQUES, ETC
  • Progressive tool design for watch case back
  • Understanding customer requirement w.r.t feasibility
  • Reviewing process planning and stage follow up in manufacturing
  • Active member in the Export part development team
  • Initiating process follow up from design until the PPAP is done
  • Designed a complete set of 10 gear components for TT Ltd
  • Designed and Manufactured assembly of wiring harness components for SUMI, Japan
  • Designed the full project of 10 MCB molds for HAVELL’S INDIA
  • Controlled project costs by approving expenditures.

Engineer (Design and development)

EL FORGE Ltd.
04.1999 - 07.2001
  • Design of tools related to hot and cold forging through hammer or press ranging from 60tonns to 2500tonns, with stainless and alloy steels
  • Handled customers like FORD INDIA, TELCO, BURMAN HITON-UK, TOYOTA KIRLOSKAR, SMITH FRANCE ETC
  • Carry out ISO9002 and QS9000 activities like FMEA, PPAP, etc

Education

Diploma - Mechanical Engineering

WBSCTE
01-1997

POST DIPLOMA - FOUNDRY AND FORGE TECHNOLOGY

NATIONAL INSTITUTE OF FOUNDRY AND FORGE TECHNOLOGY
Ranchi, India
01-1999

Skills

Operations management

Waste minimization

Health and safety compliance

Cost reduction & Cost reporting

Team building and development

Project management

Cost control

Strategic planning

Employee hiring

Additional Information

  • Awardee for the BEST QUALITY AND COMMITMENT AWARD’2005 from SUMITOMO, JAPAN.
  • Award winner for the BEST PERFORMANCE IN OPERATIONAL EXCELLENCE in ’2010 from MSIL.
  • Awardee for the BEST PERFORMANCE IN NPD ACTIVITIES in ’2011-2012, 2015-2016 from MSIL.
  • Awardee for RS EVAPORATOR Localization Project and Tool localization for FY 2017-2018.
  • Winner of Best Kaizen for more than 16 times at a stretch Annually.
  • Recognition as "ASSET TO THE COMPANY " by COO

Personal Information

  • Passport Number: N3474976 Expiry Date : 05/10/2025
  • Father's Name: Shri Sudarshan Gupta
  • Date of Birth: 03/30/75
  • Nationality: Indian
  • Marital Status: Married

Timeline

DEPUTY PLANT HEAD - SUBROS TOOL ENGINEERING CENTRE

SUBROS LTD.
07.2006 - Current

Leader

LIFELONG INDIA LTD.
12.2005 - 07.2006

Executive (Development and Manufacturing)

MOTHERSON SUMISYSTEMS AND HAG TOOLINGS LTD.
09.2003 - 10.2005

Senior Engineer (Design and development)

TIMEX WATCHES Ltd.
07.2001 - 08.2003

Engineer (Design and development)

EL FORGE Ltd.
04.1999 - 07.2001

Diploma - Mechanical Engineering

WBSCTE

POST DIPLOMA - FOUNDRY AND FORGE TECHNOLOGY

NATIONAL INSTITUTE OF FOUNDRY AND FORGE TECHNOLOGY
Prasenjit GuptaTool Room Head