INSTRUMENT AIR/PLANT AIR SYSTEM, TALCHER FERTILIZER LIMITED [JULY 2023 - Present]
- Prepared PFD, PID, process datasheets of dryer, compressors, suction filter, receivers, line list, equipment list, tie-in list, utility list, basis of design document, process description, material balance sheet, line sizing calculations, reviewed vendor offers and post ordering documents.
- Sizing of pressure safety valves.
- Attended HAZOP study of plant.
149 TPD ASU OXYGEN PLANT FOR COKE OVEN PLANT, KIRLOSKAR FERROUS LIMITED [AUGUST 2023 - November 2023]
- Preparation of PFD, process datasheets of compressors, storage tanks, cryogenic pumps and vendor offer review.
- Pressure building coil capacity calculation sheet for simultaneous filling and withdrawal for liquid N2 storage tank.
NRL EXPANSION PROJECT, NUMALIGARH REFINERY LIMITED [January 2022 - Present]
- Studied simulations, warm end loss and flash loss calculation.
- Prepared process description, equipment list, tie-in list and datasheets of DCAC, EVC, ambient vaporizers, PB coil, silencer, heat exchanger, reboiler/condenser, filters, liquid nitrogen and liquid oxygen storage tanks.
- Revised process documents and provided resolution against client's/PMC comments.
- Reviewed vendor offers of storage tank, ambient vaporizers, pressure building coil, regeneration heater, thawing heater.
- Attended plant HAZOP study as second lead.
- Filled process data for control valves, on-off valves, alarm set point list, line list cum insulation schedule.
CRYOGENIC PLANT PACKAGE, GAIL USAR [May 2022- January 2024]
- Preparation of datasheets of ambient vaporizer, pressure building coil, silencer, regeneration heater, thawing heater, PPU after-filters.
- Reviewed vendor offers of process equipments.
- Filled process data for control valves and line list cum insulation schedule.
- Provided assistance as second lead during HAZOP study and prepared HAZOP action taken report.
NITROGEN GENERATION UNIT, INDIAN OIL CORPORATION LIMITED, PANIPAT [August 2022 - December 2022]
- Worked on simulation for design cases in UNISIM and optimization of the manufacturing process, prepared process equipment datasheets for vendor inquiry for cost estimation and power consumption purpose and calculation of warm end loss during the pre-bidding phase.
NITROGEN GENERATION UNIT, CHENNAI PETROLEUM CORPORATION LIMITED [July 2022 - October 2022]
- Simulation of 5 cases in UNISIM and optimization of the process, equipment datasheets and Warm end loss calculations during pre-bidding phase.