Summary
Overview
Work History
Education
Skills
Accomplishments
Training
Personal Information
Playing Basketball
Timeline
Generic
PRASHANT KUMAR

PRASHANT KUMAR

Senior Application Engineer
Delhi

Summary

Experienced in application development, deployment, and support with advanced technical skills to enhance system performance and reliability. Proven track record of leading successful projects and collaborating effectively with diverse teams in Thermal Power, Fertilizer Plant, and Petro-Chemical industries. Holds a Bachelor of Technology in Electronics and Instrumentation Engineering with expertise in Application Engineering, failure analysis, commissioning, and troubleshooting of turbine and compressor controls on Woodward platforms for OEMs like Elliott, Ebara, MHI, BHEL, GE, and Man Turbo. Demonstrates strong technical aptitude and application expertise leading to optimized performance, continuous improvement recommendations, and product innovation. Organized and dependable candidate adept at managing multiple priorities with a positive attitude and willingness to take on added responsibilities to meet team goals.

Overview

13
13
years of professional experience
12
12
years of post-secondary education
2
2
Languages

Work History

Senior Application Engineer

Woodward India Pvt Limited
04.2023 - Current
  • Working on the new products as per the market demands with the supports from Woodward Offices across globe.
  • Developed Flex 500 PM with WW Stuttgart support and its Beta testing has been completed in India successfully.
  • Supporting WW Fort Collins on the revisions of the Vertex that includes the revision of the GAP logic on the latest ASCE core and GUI modifications as required.
  • Development and completed successful FAT for the Flex500 platform based ITCC for WW Singapore for their project, Air Compressor 101J Petrokemia, Indonesia. This included the adaption of new ASCE core and 505 XT core along with their GUI combined in Flex500 DR. The application has been developed in keeping all the configurable essence intact for 505XT and Vertex control and can be used for the other ITCC applications as well.
  • Providing engineering support to WW Australia for their first Vertex based Compressor control and later commissioning.
  • Developed HMI on Allen Bradley FTView SCADA for 505XT for Woodward India project and commissioned successful.
  • Developed Governing application which exchange data as well from EasyGen and based load input can be provided from GUI. Export/Import logic were prepared in accordance to the India, Electricity Grid Control guidelines.
  • Timely providing the project deliverables which include development of the Designing of the Panel, GAP applications and its HMI development and conducting of the FAT for Generator as well as Compressor Applications.
  • Key speaker in seminar organized by WW India education industries leader about WW products.
  • Provided technical presentation to the leading OEMs in India like Siemens, Atlas Copco, Triveni, MAAN Turbo and Dresser Rand education on WW products like Flex 500 can play in providing better alternative to the PLC based or other competitor control.
  • In context to the above point, developed and successfully application for Siemens on Flex 500 which include Governing control and the logic for their auxiliary motor and pump logics and 4 no. of closed loops. All the IOs where user configurable and developed toolkit for the application.
  • Assisted sales teams in crafting compelling product demonstrations that showcased key features of custom-developed applications to prospective clients.
  • Developed the Gap logic for the Retrofitted project to replace CCC and Woodward 505 controller with Woodward ITCC for Ammonia Compressor – 2 stages along with HMI – Rockwell -Factory Talk View.
  • The project was commissioned successfully and has optimized the plant efficiency.
  • Developed the Gap logic for the Retrofitted project to replace CCC and Woodward 505 controller with Woodward ITCC for Ammonia Compressor - 4 stages along with HMI – Rockwell -Factory Talk View.
  • Identify the industry requirement by interacting with end user while service, seminar or commissioning and inputs from Bluishness Development and Sales team and provide resolution by evaluating its feasibility in Global Core Teams.
  • Global ITCC core team member and actively provide ideas and resolutions as per the Artifact on TeamForge.
  • Assisted to BDO team in creating a Specification document on WW MicroNet based ITCC system
  • Previous Gap logic was provided by the GE and customer were facing many challenges, hence, identified the customer issues and developed the new GAP software as a solution of their problem along with HMI – Rockwell -Factory Talk View.
  • Commissioning in India and Overseas of the multiple ITCC Micronet Plus control systems.
  • Developed GAP logic and Successfully Retrofitted/Upgraded Flex 500 for Steam Turbine with Generator Application for running with load biasing signal from a LMS Woodward Panel along with Allen Bradley Factory Talk View Scada for 10 MW STG which was previously running on Woodward old 505 controller.
  • Successfully commissioned 50+ sites for various Woodward standard and customized products like MicroNet TMR, MicroNet Plus, 5009 XT, Flex 500, 505D, 505 XT, Peak 150 CPC II etc.
  • Evaluated third-party tools and libraries for potential integration into projects, ensuring optimal resource allocation for maximum benefit to the business.
  • Consistently met project deadlines through effective time management strategies and clear communication with stakeholders.
  • Enhanced end-user experience by incorporating feedback from them and BDO team into application design and functionality improvements.
  • Provided technical guidance to junior engineers, improving overall team efficiency and skill levels.

Application Engineer

PM Controls India Private Limited
09.2019 - 04.2023
  • Played a crucial role in successful project completion by contributing technical expertise at all stages of development.
  • Developed custom solutions for clients, improving overall user experience and satisfaction.
  • Served as a go-to technical expert within the organization on multiple occasions, providing timely guidance and input during critical decision-making moments.

Some of the notable projects executed are mention below:

  • · M/s Yara Fertilizer Limited, UP: - Developed the Gap logic for the Retrofitted project to replace CCC and Woodward 505 controller with Woodward ITCC for Ammonia Compressor – 2 stages along with HMI – Rockwell -Factory Talk View.
  • M/s Gujarat Narmada Fertilizer Limited, Gujarat: - Developed the Gap logic for the Retrofitted project to replace CCC and Woodward 505 controller with Woodward ITCC for Ammonia Compressor - 4 stages along with HMI – Rockwell -Factory Talk View. T
  • M/s Matix Fertilizer and Chemical Limited, West Bengal: - Developed the Gap logic for ITCC – CO2 project based on GE Speed control narrative as required by the customer. Previous Gap logic was provided by the GE and customer were facing many challenges, hence, identified the customer issues and developed the new GAP software as a solution of their problem along with HMI – Rockwell -Factory Talk View.
  • · M/s Chambal Fertilizer and Chemical Limited, Kota: Successfully Commissioned/ Retrofitted Woodward ITCC on MicroNet Plus Redundant system platform in Ammonia II plant for total four number of Centrifugal Compressors (NG, Process Air, Syn Gas and Ammonia) which was previously using MAN GHH Borsig as Compressor Control and Woodward 505/505E as Speed Control. Prepared GA and CW, Gap logic, HMI on iFix 6.5 along with the conduction of the FAT and commissioning of all the four ITCC projects.
  • · M/s Dangote Fertilizers Limited, Lagos: Application Engineering and Successfully completion FAT Train 1 and Train 2 each comprising of four number of centrifugal compressors – Process Air, Syn Gas, Ammonia Gas and COշ Gas

C&I Manager - ROGC

Reliance Industries Limited
11.2018 - 09.2019
  • To ensure the efficient working of all the Instruments and control system with minimum or zero breakdown in compliance to safety guidelines.
  • The completion of the project in the stipulated time and ensuring all the quality compliances.
  • Also, the procurement of the spare and implementation of Kaizen and TPM.
  • Evaluated vendor drawings, logic sequence, interlock sequence and cause and effect diagrams.
  • Maintenance and troubleshooting of 50 GCs (Maxum II make: Siemens) along with 70 field analyzers and 10 Analyzer Shelters by strategic planning and optimized resource.
  • Maintenance and troubleshooting of highly specialized analyzers like Mass spectrometer & Wobbe index.
  • Monitored performance of online process analyzers and involved in critical troubleshooting of the same.
  • Managed planning, scheduling and execution of overhauling and troubleshooting activities of plant instruments during major shutdown of Cracker plant (RIL JMD).
  • Overspeed test in Peak 150 governor make: Woodward.
  • Optimized cost and availability of spare parts by inventory modelling in SAP MM module.
  • Supervised a team of 8 people during major shutdown of the plant for safe execution of shutdown activities.
  • Carrying out various audits IMS and SSAC audits.

C&I Executive (BTG and BOP)

UPL Limited
10.2017 - 11.2018
  • Erection/Commissioning/Maintenance of Back Pressure Turbine (1 x 16.15 MW Make: Siemens).
  • Erection /Commissioning/Maintenance of AFBC Boiler (1 x 100 TPH Make: ISGEC).
  • Maintenance of STG Turbine (1 x 21.5 MW Make: GE).
  • Maintenance of CFBC Boiler (1 x 150 TPH Make: ISGEC).
  • Erection and commissioning of the BPSTG (1 x 16.15 Make: Siemens) and AFBC Boiler ( 1 x 114 TPH Make: ISGEC).
  • Organize, coordinate and ensure operation and implementation of Instrumentation maintenance activities with proper safety guidelines and quality of job.
  • Commissioning and troubleshooting in MicroNet Control System Panel (make: PMCS) and Working on the GAP logics.
  • Commissioning and troubleshooting of the Turbine Supervisory Panel comprising of Woodward Governor 505xd, Bentley Nevada Vibration Monitoring System 3500 and Woodward Overspeed Protection System -Protech.
  • Simulation and checking of all the Safety interlocks of the Turbine.
  • Shutdown Instrumentation related to Budget preparation and planning.
  • Procurement of spares, maintaining inventory of C&I materials.
  • Carry out risk assessment and adhere to all the safety norms in maintenance jobs.
  • Providing technical and safety guidance to subordinates.
  • Calibration of the Voith I/H and Servo motors.
  • Ensuring all the instruments are installed as per the P&ID and Hook UP Drawings.
  • Preparing instrument list, Wiring list, I/O check list of DCS and PLC for commissioning activities and validating final completion.
  • Coordinating with subcontractors and Vendor for supporting the O&M activities of equipment’s.

C&I Engineer (Boiler, Turbine, CHP and Ash Handling System)

Sanghi Industries Ltd.
10.2015 - 10.2017
  • Maintenance of Boiler Instruments – C.F.B.C (1 X 260 TPH).
  • Maintenance of Steam Turbine, Make : CHINA (1 X 63).
  • Maintenance of Instruments in Ash Handling System, Make: Macawber Beekay Ltd.
  • Maintenance of Instruments in Coal Handling Plant.
  • Organize, coordinate and ensure operation and implementation of Instrumentation maintenance activities with proper safety guidelines and quality of job.
  • Maintenance and troubleshooting of DCS - ABB AC800F, PLC - Messung and Allen Bradley.
  • Maintenance of MV - VFD (make: Harvest).
  • Developing/modifying of control logic of open/close loops, drives etc. and operation graphic.
  • Maintenance, Troubleshooting and calibration of Gauges, Transmitters (ABB, YOKOGAWA, ROSEMOUNT), Control valves (MIL, Forbes Marshall etc.) and switches etc.
  • General Maintenance and calibration of Pneumatic Control Valves, E-to-P Converters, Power cylinders, Dampers etc.
  • Assist Managers in shutdown planning, budgeting and execution.

C&I Assistant Engineer (Boiler, Turbine, CHP and Ash Handling System)

Action Ispat and Power Plant
06.2012 - 10.2015
  • Team member of Maintenance and Commissioning of 43 x 2 MW Unit –Stean Turbine Generator and CFBC Boiler 185 x 2 TPH Make-Thyssenkrupp.
  • Maintenance of Hot Gas Generator System (HGG) through DCS and troubleshooting done.
  • Worked on DCS Yokogawa (Centum VP and 3000) and ABB (AC800F) logic and hardware, system architecture, System Power On.
  • Maintenance and troubleshooting of Yokogawa and ABB DCS Hardware system like DI, DO, AI, AO, SOE, RTD, TC, Relay cards, power supply module, Controller, Grounding, Temp. Switch, Network Cable, CPU etc.
  • Soft-Logic simulation and validation during trail operation of equipment using DCS Yokogawa and ABB.
  • Maintenance and calibration of Oxygen Analyzer (Make: YOKOGAWA).
  • Preventive Maintenance and troubleshooting of Air Compressor Make: ELGI (110 ,55 and 37 KW ) C & I scope.

Education

B.E - Electronics & Instrumentation

Hindustan College of Science And Technology
Mathura, UP
04.2001 - 01.2013

Skills

Ms-Office

GAP

GE IFIX

Factory Talk View

AutoCAD 2021

QT

undefined

Accomplishments

  • Awarded R-Samman by RIL for eliminating a hydrocarbon leakage
  • Played basketball at National level
  • Participated in various technical National Basketball Tournaments
  • Co-coordinator of national level technical cum cultural fest, Gyan Jyoti

Training

  • Graduate Engineer Trainee (I&C), Action Ispat & Power Pvt. Ltd., 06/01/12, 06/01/13
  • Industrial Automation Training in PLC & SCADA, Sofcon India Pvt. Ltd.

Personal Information

  • Passport Number: Z7622187
  • Passport Date Of Issue: 01/08/24
  • Passport Place Of Issue: Delhi, India
  • Passport Expiry Date: 01/07/34
  • Date of Birth: 09/04/89
  • H1/B1 US visa


Playing Basketball

Participated in many state and national level tournaments

Timeline

Senior Application Engineer

Woodward India Pvt Limited
04.2023 - Current

Application Engineer

PM Controls India Private Limited
09.2019 - 04.2023

C&I Manager - ROGC

Reliance Industries Limited
11.2018 - 09.2019

C&I Executive (BTG and BOP)

UPL Limited
10.2017 - 11.2018

C&I Engineer (Boiler, Turbine, CHP and Ash Handling System)

Sanghi Industries Ltd.
10.2015 - 10.2017

C&I Assistant Engineer (Boiler, Turbine, CHP and Ash Handling System)

Action Ispat and Power Plant
06.2012 - 10.2015

B.E - Electronics & Instrumentation

Hindustan College of Science And Technology
04.2001 - 01.2013
PRASHANT KUMARSenior Application Engineer