Summary
Overview
Work History
Education
Skills
Interests
Declaration
Professional Synopsis
Timeline
Generic

Prashant Pal

Senior Engineer In BIW & Paneling Of Bus Body Industry.
Lucknow

Summary

I aspire to build a career with a leading corporation in a high-tech environment, collaborating with committed and dedicated individuals. My goal is to fully explore my potential and contribute as a key player in a challenging and creative setting.

Overview

16
16
years of professional experience
2
2
Languages

Work History

Senior Engineer (BIW & PANELING)

EKA MOBILITY LIMITED
- Current
  • Production Management: Manage daily production activities in the BIW and paneling shops to ensure production targets are met according to the established plan.
  • Quality Control: Ensure all components and assemblies meet quality requirements and customer specifications.
  • Implement and monitor quality management systems, conducting process audits and resolving non-conformities.
  • Minimize rework, rejection, and scrap rates.
  • Conduct appearance quality inspections and ensure gap and flush requirements are met.
  • Process Engineering & Improvement: Monitor and optimize the utilization of all resources, including manpower and equipment.
  • Drive and implement process improvement initiatives (e.g., Kaizen, lean manufacturing).
  • Develop and implement BIW process plans for manual and potentially robotic welding lines, optimizing cycle times.
  • Conduct manufacturing feasibility studies for new product introductions.
  • Design and Development Support: Coordinate with design and R&D teams to understand and resolve manufacturing problems, implementing feedback into future designs. This includes checking 3D models and engineering drawings for Design for Manufacturing (DFM) and Design for Assembly (DFA).
  • Team Leadership & Management: Lead, supervise, and mentor a team of engineers, team leaders, and shop-floor associates.
  • Ensure a harmonious work environment, maintain shop floor discipline, and implement staff training and multiskilling plans.
  • Coordination & Stakeholder Management: Coordinate with cross-functional teams, including Quality, Purchase, SCM (Supply Chain Management), and Projects, to ensure smooth workflow and timely material delivery.
  • Liaise with internal and external stakeholders, including customers, for stage inspections and issue resolution.
  • Safety & Compliance: Ensure adherence to all safety standards, regulations, and company policies, maintaining a safe and organized (e.g., 5S) working environment.
  • Documentation & Reporting: Prepare and maintain accurate production reports, downtime logs, and documentation for audits and management reviews.

Engineer (Fabrication)

TATA MOTORS BODY SOLUTION LTD
09.2009 - 11.2025
  • Lead a team of 10 supervisors overseeing a workforce of 500, adhering to SQDMCE (Safety, Quality, Delivery, Motivation, Cost, and Environment) parameters.
  • Achieved 100% on-time production schedules and implemented effective countermeasures based on feedback from service audits and customer insights.
  • Identified training needs for welders and executed comprehensive training programs for team leaders, group leaders, and associates to support their professional growth.
  • Promoted and communicated safe work practices, establishing guidelines for environmental health and safety.
  • Monitored key performance indicators (KPIs) to ensure targets are consistently met and exceeded.
  • Controlled and maintained costs related to shop operations.
  • Conducted capacity analysis in alignment with monthly production plans.
  • Collaborated with line engineers and assistant managers to effectively address problems, reducing rework and scrap rates.
  • Developed and executed project production schedules, assisting with production duties to meet all goals efficiently.
  • Oversaw the manufacturing process, ensuring smooth and efficient operation of production lines.
  • Addressed field issues with both short-term and long-term solutions, maintaining quality levels at benchmark standards.
  • Provided cross-departmental support to ensure timely production across all projects.
  • Collaborated closely with supervisors and maintenance staff to plan work, set targets, and ensure finished products meet quality standards.
  • Allocated resources effectively, including staffing and necessary materials, to optimize production efficiency.
  • Tracked production progress and developed updates to existing tracking systems for enhanced monitoring.
  • Implemented product standards and coordinated efforts with other departments to align on production goals.
  • Accountable for managing indirect material costs per bus, including rectification, rework, rejection, process scrap, warranty costs, and power consumption.
  • Maintained consumable and manpower costs within budgeted and benchmark levels.
  • Ensured adherence to health and safety guidelines throughout the production process.
  • Facilitated field quality interactions, achieving zero-defect delivery for in-house defects.
  • Reviewed worker performance to identify training needs and enhance team capabilities.

Education

3 Years Diploma - Mechanical Engg

Skills

Team leadership

Interests

Playing Chess, Swimming, Watching Movies, Cricket

Declaration

I consider myself well-versed in mechanical engineering aspects and am confident in my ability to work effectively within a team. I hereby declare that the information provided above is true to the best of my knowledge. Prashant Pal

Professional Synopsis

  • Over 15 years of extensive experience of bus body in BIW, Paneling, Trim department.
  • Actively participated in initiatives such as KAIZEN, Value Analysis/Value Engineering (VAVE), and optimizing inventory of non-moving and slow-moving materials.
  • Achieved a 40% cost reduction in Indirect material (IDM) per equivalent bus through Project EVEREST.
  • Strong exposure to various bus segments, including Light Commercial Vehicles (LCV), Medium Commercial Vehicles (MCV), and Low Entry Models.
  • Played a key role in project teams for the installation of new production lines for various models (4x12, 9x12, 9x9, Electrical Model).
  • Involved in the production line installation for the Tata Ace body.
  • Contributed to new projects focused on alternative fuel technologies, including Fuel Cells, LNG, and PNG.
  • Successfully implemented manpower reductions on the G3 line through work content reduction and line balancing strategies.

Timeline

Engineer (Fabrication)

TATA MOTORS BODY SOLUTION LTD
09.2009 - 11.2025

Senior Engineer (BIW & PANELING)

EKA MOBILITY LIMITED
- Current

3 Years Diploma - Mechanical Engg

Prashant PalSenior Engineer In BIW & Paneling Of Bus Body Industry.